Responds to Re Excessive Lengths of Tours of Duty & Suggestion That Operator Tours Be Limited to 12-h. Inquiry by IE Found That 16-h Shifts Were Not Routinely Scheduled.Review Under Way to Determine Safety Aspects
ML17207A381
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/16/1979
From: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Rich L
AFFILIATION NOT ASSIGNED
Shared Package
ML17207A382 List:
References
NUDOCS 7909190508
Download: ML17207A381 (1)


Text

pe RECI c<

f

<<<<~*+

'NITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

.UG Z6 879

".SI:IS 6530 Nr. Laurence N.,Rich 6206 Hidden Pines Road Fort Piercei FLorida 33450

Dear Hr..Rich:

On Hay 1 1r 1979'ou sent a Letter on behaLf of severaL other operators at the St. Lucie NucLear Power Plant requesting. that an operator%

tour of duty be. Limited to a

maximum of twe lve hours with a tweLve hoCr rest period prior to the next tour.

You also alleged that operators "are being routinely required to work up to sixteen (16) continuous hours".

The results of the inquiry by the Office of Inspection and Enforcement into this matter are discussed in the enclosed Letter which was sent to Senators Stone and Chile's.

The inquiry did not find that 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> shifts were being routineLy scheduled at the St. Lucie plant.

ALthough our inquiry does not indicate that further, action by the NRC is warranted at this time at St. Lucier we are taking a 'fur ther I.ook at the safety-r eLated aspect of working extended hours to ascertain whether specific action is required to Limit the working hours of operators.

We appreciate your concern in this matter.

Sincerelyi Victor Ste'L Lar J r'.

Director Office of Inspection and Enforcement

Enclosure:

Litter to Senator Stone dated August 1r 1979 g:P-~