ML17206A780
| ML17206A780 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/12/1979 |
| From: | Tourtellotte J NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Mike Farrar, Johnson W, Salzman R NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP) |
| References | |
| NUDOCS 7905100130 | |
| Download: ML17206A780 (6) | |
Text
~qR ASSAI Wp.
+
0 IP ++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 12, 1979 P
Qpp
.aoc~
C p'o Dr.
W. Reed Johnson Atomic Safety and Licensing Appeal Board U.S.
Nuclear Regulatory Commission Washington, D.
C.
20555 Richard S.
- Salzman, Esq.
Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ps'79 0 pP~~y~ ~~lH 0~~i~o~-
5 2)
In the Hatter of florida Power 5 Light Company (St. Lucie Nuclear Power Plant, Unit Docket No. 50-389 Michael C. Farrar, Esq.,
Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 Gentlemen:
This letter is in reponse to your Memorandum and Order of April 5, ]979 ALAB-537 requesting that certain information be filed by the Staff with-in 45 days from the date of that opinion.
We calculated that date to be Hay 21, 1979.
The Staff witness most familiar with the St. Lucie case and the one which the Staff intends to rely upon for preparation of the requested testimony is currently stationed at Three Nile Island.
He is expected to return around Nay 1, 1979.
His absence makes it impossible for the Staff to begin preparation of the information requested by ALAB-537.
Moroever, the uncertainties associated with the situation at Three Nile Island precludes absolute assurance that the Staff witness will return by Nay 1, 1979.
The Staff proposes to reassess its position sometime in the latter part of April and will advise the Board at that time of the nature of our requested continuance.
As a matter of information, our Staff witness believes that the job required by ALAB-537 will take 45 days from the date he returns.
In any event, it appears, that the Staff would not be prepared to present its testimony until June'. 15, 1979 or later.
tp We will keep the Board and the parties advised.
~ ~
cc (see page 2)
Sincerely James R. Tourtellotte Assistant Chief Hearing Counsel 7 gc >ip oi ~ D
CC:
Edward Luton, Esq.'ichael
- Glaser, Esq.
David L. Hetrick Martin Harold Hodder, Esq.
Dr. Frank Hooper Dr. Marvin M. Mann Harold F. Reis, Esq.
Norman A. Coll, Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Docketing and Service Section Mr. Samuel J. Chilk
April 12, 1979 Michael C. Farrar, Esq.,
Chairman Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Richard S.
- Salzman, Esq.
Atomic Safety aqd Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr.
W. Reed Johnson Atomic Safety and Licensing Appeal Board U.S. Nuclear Regulatory Commission Washington, D.
C.
20555 In the flatter of Florida Power 8 Light Company (St. Lucie Nuclear Power Plant, Unit 2)
Docket No. 50-389 Gentlemen:
This letter is in reponse to your Memorandum artiGh der of April 5, 1979 ALAB-537 requesting that certain information be filed by the Staff with-in 45 days from the date of that opinion.
$1e calculated that date to be llay 21, 1979.
The Staff witness most familiar with the St. Lucie case and the one which the Staff intends to rely upon for preparation of the requested testimony is currently stationed at Three Nile Island.
He is expected to return around May 1, 1979.
His absence makes it impossible for the Staff to begin preparation of the information requested by ALAB-537.
Noroever, the uncertainties associated with the situation at Three l1ile Isl'and precludes'bsolute assurance that the Staff witness will return by Hay 1, 1979.
The Staff proposes to reassess its position sometim in the latter part of April and will advise the Board at that time of the nature of our requested continuance.
As a matter of information, our Staff witness believes that. the job required by ALAB-537 will take 45 days from the date he returns.
In any eveht, it appears that the Staff would not be prepared to present its testimony until June 15, 1979 or later.
We will keep the Board and the parties advised.
E Sincerely,
~g505 l, 00 lgg OFPICC~
dURNAQQ(
OATN~
ee-page-2)
James R.
""'"-'Ass'i'saba'lit ourtellotte Chief.;-i{earing NRC FORM 518 (9-76) NR(24 0240 4 VId OOVSRNMCNT RRINTINO OFFICE 10'7d d~~
II I
~T I
~
lf VVI-*
4 l '
zf I
I Ill t
It 4.
I' 9
I 4
h
'4 ht 99 I
~
I 4
R,
~ ll I
~
4 J[ 4 tQ I
I(>>
~
9 f4 Il I
e.
'I I
4 IV%94
~'I
. V,V
~,
VN
,4 I I
I R
V I'
I P I' ff I
I I
I I
~,
I tl 1
9 I
9
~
14 I
I E
r
~
11' II I
I I
1 I
'h E
1 I
9 I
99 hf I
'IE I
I V
It 4
I'I
$ 9 ~
P ll.
19'I' 9'
TI '1 I I
tf 4 ~
I I
cc e
Edward Luton, Esq.
Michael Glaser, Esq.
David L. Hetrick Martin Harold Hodder, Esq.
Dr. Frank Hooper Dr. Marvin N. Mann Harold F. Heis, Esq.
Norman A. Coll, Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Docketing and Service Sectio'n Mr. Samuel J. Chilk Distribution:
Tourtellotte Paton Olmstead ODT Lynch R. Birkel Formal Files Reg.'ent LPDR Shapar/Engelhardt/Christenbury OPPICC~
BURNAMC~
OATC~
OELD JTourtellot 4g
/79 NRC FORM 318 (9.76) NRCM 0240 4 UI 0 OOVCRNMCNT PRINTIN4 OPPICCI IDTD~ BB~DI1
,n 0
d p
~
K 1
Ilk k
gf 4N~
E.
j i
4
~
t flL5+g~/I
) cg Nil'I J
I p )
)
II'
'y f)
(.
l 1,
1 I
t' k
C-
~
4 d
I 0
5 I
,I I
'I lh 4