Commonwealth Edison Company.
Dresden Nuclear*P6w~r Station*
Docket Nos. 50-237; 50-249 License Nos: DPR-19; DPR-25
- As a result of th~ inspection conducted on December 30, 1990 through February 15,'_1991, _and in accordance with.the "General Statement of Policy
- . ProcedLJre for NRC Enforcement Actions, 11 10 CFR Part 2, Appendjx C, (1991)
(Erifti~cement Policy), the *following violation was identified~
~nd.*
10 CFR 50~ Ap.pendixB, Criterion i/, a~ imp.lemented by Commonwealth Edison
- Company's Quality As~urance Progra~. req~ires, in part, that activities affecting qualit~ shall be prescribed by documented i.nstructions, procedures, or drawings, of a type appropriate to the circumstances, Contrary to the above; between June 3,*19S8 and January 23, 1991, Dresden Instrument 'surveillance (DIS) Procedure. 500-9, "Reactor Protection System (RPS) Functional Response Tim*e Tests, 11 was inappropriate to the circumstances in that actions ~ere d~line~ted whi~h failed to adequately measure RPS response times from the opening of the sensor contacts, up to and including the opening of the trip actuator contacts.as required by Technical Specification 3.1.A.
This is a Severity Level IV violation (Supplement 1)~
- The inspection showed that actions h~d been:taken td correct the identified violation and to preverit recurrence.
Consequently,_ no reply to the violation.
is required and we have no further questions.regarding this matter.