Notice of Violation from Insp on 910122-29 & 0213.Violation Noted:Licensee Failed to Conduct Six Month Surveillance Test on Linear Thermal Detectors in Safety Related Fire Zones Since 890731
ML17202V018
Person / Time
Site: Dresden  
Issue date: 03/05/1991
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17202V017 List:
References
50-237-91-04, 50-237-91-4, 50-249-91-04, 50-249-91-4, NUDOCS 9103130006
Download: ML17202V018 (1)


Text

.. \\

.\\

NOTICE OF VIOLATION.

  • Commonweal th Edison Company Dresden Nuclear Station.*

Uni.ts 2 and 3 Docket N6s: *s0-237;50-24i Licenses No. *DPR-19; No. DPR~25 As a result*of the inspection con~ucted January 22-29, and February 13,. f9.9J, and in* accordance with.the "General Statement of Policy and Procedure for NRC Enforcement Actions",* 10 CFR ~art 2,* Appendix C,. (1990) (Enforcement Policy}

the' following violation was i?entified:

Amendment*No. 106_ to. Provisional Operating License No. DPR-19 (Unit.2) and.Amendment No. 101 to facility Operating LiCense.No. DPR-25 (Unit 3) requires the licensee to maintain fn effect all proyisions of the approved fire protection program for Dresden Unit 2 and Unit 3. *

  • As part of the ~pproved program,* the licens*ee cornrnitte*d_to.install and maintain the fire det.ection and alarm system in accordance with the National Fire Protection Standard No 72E, which required the linear thermal detectors to be tested every. six months.
  • Contrary to the above, the licensee failed to conduct the* 'six month surveillance.test on.. the liqear thermal detect.ors in safety-related fire zones.l.i.1,1 and l~l.2.1 sine~ July 31; 1989.

This is a Severity Level IV violation. (Supplement 1).

Pursuant to the provisions* of 10 _CFR 2. 201,. you are required to submit to this

  • office within thirty days of the date of this Notice' a written s_tatement or explanation in reply, including for the violation: (1) the corrective actions that have been taken and the results *achieved; (2) the corrective actions that will be taken to avoid further'violations; anq (3) the date when full.

compliance will be achieved.* Consideration m,ay be,given t.o extending your response time for good cause shown.

Dated

  • ~~~*

M _. A. lUngJctd~

Engineering Branch 9103130006 910305 PDR ADOCK 050002'37 Q

PDR*