j
- ~ '
NOTICE OF*VIOLATION Conunonwea*1 th Edi son Company Dresden Nuclear Power.Station Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 During an *NRC inspection conducted 6n Nov~mber 17 through December 29, 1990, violations of NRC requirements were identified.
In accofdance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," -.
10 CFR Part 2, Ap~~ndix C (1990), the viol~tions are listed below:
A~
Section III.J. of 10 *CFR Part 50, Appendix R, requires emergency lighting units with at least an e hour battery power supply to be installed in all areas needed for operation of safe* shutdown equipment and in access a.nd B.
egress routes thereto.
Technical Specification Section 6.2, entitled "Plant Operating
- Procedures," requires procedures that detail the Fire Prote~tion Program Implementation, be prepared, approved arid adhered to~
(
Contrary to the ab.ove*, the licensee did not.adhere to Dresden Electrical Surveillance (DES) 4153-02t "Emergency Lighting Monthly Inspection,"
Revision 0, Sectio~ I.d.(lJ, in that distilled water was not added to the emergency light when the electrolyte.level was identified on October 29, 1990, below the* fill line as required by the _procedure.
This is a severity level IV violation (Supplement I).
10 CFR 50.72tb)(2)(ii) requires the NRC to be notified within.four hours
- of the occurrence of any _event *or condition that* results in manual or automatic actuation of any Engineered Safety Feature (ESF).
Contrary to 'the above~ the une~pected closure of several Unit 2 Group II primary containment isolation valves.upon lifting of an electrical lead during post-maintenanc~ tes~ing on_ December 8, 1990, constituted an*
automatic actuation of an ESF ~nd the NRC was not notified of the occurrence.
This is a severity level IV violation (Supplement I).
9101280048 910117 r.
~DR ADOCK 050~~~7 f{.
- i l
With respect to Item A, the inspection showed that ~cttons had*be~n taken to correct the identified viola.tion and to prevent recurrence.* Consequently, no reply to the.violation is required*and we have no further questions regarding thi$ matter.
~t~h fespect to Item B, pursuant* to the prov~sions of *
- 10 CFR 2.201, you are required-to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) the corrective steps.that h~v~ been taken and the
- results ~chie~ed; (2) the torrective steps that vill be taken to avoid further violations; and (3) the date when full compliance will *be achieved.
Consideration may be given to.extending your re~ponse time* for good cause
.shown. -
. 1~11~ 01.
Dat.ed a e,
ie Reactor Pr~ ects Branch 1