Forwards Safety Evaluation Re Util Responses to First 12 Open Items of Region III 860226 Insp Rept Re Investigation of Fire on 860128,29 & 0207 & 13.Responses Acceptable
ML17199S813
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/31/1987
From: Holahan G
Office of Nuclear Reactor Regulation
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17199S821 List:
References
TAC-60987, NUDOCS 8709080112
Download: ML17199S813 (4)


Text

UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 31, 1987 MEMORANDUM FOR:

C. E. Nore l i us, Di rector Division of Reactor Projects*

FROM:

SUBJECT:

Gary Holahan, Assistant Director for Regions III and V Division of Reactor Projects - III IV, V and Special.Projects CONCERNS RELATED TO THE DRESDEN UNIT 3 DRYWELL EXPANSION GAP FIRE_ OF JANUARY 20, 1986 (TIA-86-10.B, TAC 60987)

This fs in response to your February 10, 1986 memo and the August 7, 1986 memo from C. J. Paperiello.

Region III conducted an investigation of the fire on January 28, 29, and February 7 and 13, 1986.

The Inspection Report dated February 26, 1986, contained a total of 13 open items.

The licensee's response, dated May 6, 1986, addresses the first 12 of those open items.

The last one concerns Emergency Preparedness and the licensee has committed to review that item in the licensee's General Office and respond at a later date.

The 1 i cens:ee further responded to the February 25, 1986 1 etter from NRR on June 5, 1986, with an exemption request.

This request will be responded to separately. /The enclosed Safety Evaluation Report has evaluated the licensee response to the first 12 open items (Nos. 3.a - 3.1) of the Region III Inspection Report.

We find the responses acceptable for all of these items.

We have also considered four additional concerns in a memo from Paperiello to Holahan, dated August 11, 1986.

Three of those concerns were essentially restatements of issues identified in the February 26, 1986 Inspection Report.

The fourth concern was new in that it questioned whether the residue and degraded material left in the expansion gap from the burned polyurethane materi*al has physical characteristics sufficiently altered from those of the original material to now be subject to spontaneous combustion or ignition at the normal ambient operating temperature at the expansion gap of about 135°F.

Our evaluation indicates the licensee should provide more information to resolve this concern (No. 4).

Based on our evaluation to date as summarized above, subject to the resolution of concern No. 4, we have concluded that the licensee needs to make no modifi-cations or changes and that the resolution of items 3g and 3m and concern No. 4 should not preclude the resumption of operation of Dresden Unit 3.

It is essential that the commitment to strengthen safety procedures when doing any hot metal working - including welding and cutting - to Dresden Station be

-~------*

OFC C. August 31, 1987 I

implemented.

We have als.o conclude*d that there are no generic implications resulting froni this fire that will require any modification at other nuclear power plants.

Enclosure:

As stated Distr1bution:

. :~Docket r/f *;;

NRC &.. Loe.a 1. PD Rs PDIII'-2 r/f GHolahan Lluther OGC-Beth.

EJordan JPartlow ACRS (10)

PDIII-2 plant file FWitt, NRR

  • See Previous.Concurrence PDIII-2 SP[B Original. Signed by/.

Gary Holahan, Assistant Director

  • tor Regions III and V Divisi~n of Reactor Projects - III IV, V and Special Pro.jects SPLB:SC SPLB:BC PDIII-2:0. : oml~:AD

*----------------*--------------*-------------~*----~---------*---~--~-------*-----------~-

NAME

  • MGrotenhuis
*DNotley
*JKudrick
*JCraig
*DMuller
GHolahan

~-~~-----------*-~------------*-------~--~--~*---------~-~--*--~---~-------*--------~----

DATE

8/27 /87
8/19/87 8/19/87
8/24/87 :

. 8/25/87 8/.3 / /87

e*

C. implemented.

We have also concluded that there are no generic implications resulting from this fire that will require any modification at other nuclear power plants.

Enclosure:

As stated Distribution:

Docket r/f NRC & Local PDRs PDII I-2 r/f GHolahan LLuther OGC-Beth.

EJordan.

JP art low ACRS (10)

PDIII-2 plant file FWitt, NRR

  • See Previous Concurrence Gary Holahan, Assistant Director Division of Reactor Projects - III IV, V and Special Projects

,/

/

'OFC PDIII-2~ :

SPLB

SPLB:SC SPLB:BC
PDIII-2:0
DRP:DSRP:AD NAME
MGrotenhu1
*DNotley
*JKudrick
*JCraig
*DMuller

--:--------------:--------------:--------------:------~-------:-------------

i DATE. : *8/

/87

8/

/87

8/

/87 : 8/

/87 : 8/

/87

8/

/87

)

C. E. Norelius 2

implemented.

We have also concluded that there are no generic implications resulting from this fire that will require any modification at other nuclear power plants.

Enclosure:

as stated Distribution:

Concurrence:

F. Witt, NRR PD 111-2: P2r M 7 /dtf."nh°'

DRP:DSRP.AD G. Holahan II

/ /

1*

G. Holahan, Assistant Director Division of Reactor Projects 111/lV/V and Special7 SP