NRC-17-0005, 2017 Fer Ile Proposed Exam Licensee Letter

From kanterella
(Redirected from ML17198D940)
Jump to navigation Jump to search
2017 Fer Ile Proposed Exam Licensee Letter
ML17198D940
Person / Time
Site: Fermi 
Issue date: 04/03/2017
From: Maglio S
Detroit Edison, Co
To: Robert Orlikowski
NRC/RGN-III/DRS/OLB
Shared Package
ML17061A781 List:
References
NRC-17-0005
Download: ML17198D940 (2)


Text

DTE Energy ComPanY 6400 North Dixie HighwaY Newport, MI48166 DIE Energy' Confdential Material Enclosed - \\ilithhold Under f 0 CFR 2'390 January 09,2017 NRC-17-0005 10 cFR 55.40 Mr. Robert Orlikowski Chief, Operations Branch Division of Reactor Safety Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle,Illinois 60532-4352

Reference:

Fermi 2 NRC DocketNo. 50-341 NRC OPerating License No. NPF-43

Subject:

Fermi 2 Initial Licensed Operator Examination Materials Enclosed please find the proposed examination materials for the upcoming Fermi 2 Initial Licnse Examination ihut is scheduled for the week of March 27,2017. The fcíllowing items are enclosed:

. Modified Examination Outlines (modified during the examination development process)

. Seventy-five (75) written examination items for the Reactor Operator examination

. Twenty-five (25) written examination items for the Senior Reactor Operator examination

. Eleven (11) Plant Systems related Job Performance Measures

. Eight (8) Administrative topic Job Performance Measures

. Three (3) Simulator Scenarios r Supporting Reference Material

. Quality Verification Checklists from NUREG 1.021, Revision 10.

The enclosure to this letter contains confidential material' Upon separation from the enclosure, this cover letter is DECONTROLLED.

K

USNRC NRC-17-0005 Page2 confidential Material Enclosed - withhold under 10 cFR 2.390

. Generic Kaowledge and Abilities outline (K/As) (Form ES-401-3)

. Record of Rejected IlAs (Form ES-401-4)

The examination materials were developed using the appropriate guidance contained in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,"

Revision 10. The examination matrials shall be withheld from public disclosure until after the examinations are complete.

We look forward to working with you and youf examination team during the examination development and administration process. If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Bryan Crone, General Supervisor, Operations Training at(734) 586-4173.

Sincerely A. ^.,4A Scott A. Maglio Manager - Nuclear Licensing Enclosures

[w/o Enclosures]

NRC Project Manager Reactor rojects Cnief, Branch 5, Region III NRC Resident Office Document Control Desk, V/ashington D C The enclosure to this letter contains confidential material Upon separation from the enclosure, this cover letter is DECONTROLLED.

cc