ML17193B027

From kanterella
Jump to navigation Jump to search
Notifies That Action Required by Bulletin 74-09 Re Deficiencies in GE Type M26 & MC4-76 Metal Clad Switch Gear Has Been Completed Per 751210 Schedule
ML17193B027
Person / Time
Site: Dresden, Quad Cities, LaSalle  
Issue date: 06/04/1976
From: Abrell G
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-74-09, IEB-74-9, NUDOCS 8103100020
Download: ML17193B027 (1)


Text

Coinmon,allh Edison C2~First N<

)I Plnrn. Chic<J~_?_._~noi~

Address Re lo: Posl Office Box 767 Chicago, Illinois 60690 June 4, 1976 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement -

Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Dresden Station Unit 2 Quad-Cities Station Unit 1 AEC DRO Bulletin No. 74-09 Regardirig Deficiencies in General Electric Type M26 and MC4.76 Metal Clad Switch Gear NRC Docket Nos. 50-237 and 50~254 Reference (a):

G. A. Abrell Letter to J. G. Keppler dated December 10, 1.975, NRC Dkts.

50-10, 50-237, 50-249, 50-254, 50-265, 50-373 and 50-374

Dear Mr. Keppler:

The action required by the subject bulletin has been completed for Dresden Unit 2 and Quad-Cities Unit 1 in accordance with the schedule indicated in reference (a).

Very truly yours,

&~:~

~/c;(?f?/.

G. A. Abrell Nuclear Licensing Administrator Boiling Water Reactors