Monthly Operating Repts for Sept 1980
ML17193A420
Person / Time
Site: Dresden  
Issue date: 10/01/1980
From: Ceiszkiewicz S
COMMONWEALTH EDISON CO.
To:
Shared Package
ML17193A133 List:
References
NUDOCS 8010210441
Download: ML17193A420 (15)


Text

..

e AVERAGE DA I LY UN IT POWER LEVEL

~.

\\

DOCKET N0.050-010 Utl I TDresden I DATE October 1 ! 1980 COMPLETED. BYS. Cieszkiewicz TELEPHONE(815) 942-2920 MONTH SEPTEMBER, 1980 DAY AVERAGE DAILY PO\\.JER LEVEL DAY AVERAGE DA I LY PO\\.JER LEVEL (MWe-Net)

(M\\.Je-Net) 0 17 0

2 0

18 o:

3 0

19 0

4 0

20 0

/

5.

0

  • 21 0

\\

6 0

22 0

7 0

23 0

8 24

.o 9

0 25 0

10 0

26 0

11 0

27 0

12

  • O 28 0

13 0

29 0

14 0

30 0

15 0

31 I.

16 0

so1021 o...,~I

AVERAGE DAI LY UNIT POWER LEVEL DOCKET NO. 050-237

  • Utl IT Dresden II DATE October 1, 1980.

COM.PLETED* BY S ~ Cieszkiewicz TELEPHONE MONTH SEPTEMBER~* 1980 D8Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DA I LY PO\\.JER LEVEL

. (MWe-Net)

(M\\~e-Net) 17 2

464 18 3

422 19 429 4

459 20 423

\\.

5 459 21 422.

6 454 22

. 420..

7 449 23 72 8

447 24 b

9 441 25 0

10 439 26 147 11 437 27 326 12.*

28 333 13 435 29 382 14 439 30 413 15 434 31 16 431

  • .e AVERAGE DAI LY UNIT POWER LEVEL DOCKET NO. 050-249 Ull IT Dresden III DATE October 1, 1980 COMPLETED BY s. Cieszkiewicz
  • TELEPHONE (815) 942-2920 MONTH SEPTEMBER, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA I LY PO\\~ER LEVEL (MWe-Net)

(M\\*Je-Net) 614 17 736 2

726 18 771 3

755 19

. 773 4

767 20 745 5

770 il 767 6

22.

6 7

628 23 768 8

765 24 769 9

766

-25 770 10 767

26.

746 11 743 27 486 12 765.

28 705 13 743.

29 768 768 30 762 14 15 769 31

16.

i \\

OPERATING DATA REPORT DOCKET NO.

050~010.

-=~-----------

DATE Oct. 1, 1980.

COMPLETED BY S. A. Cieszkiewi' fEL~PHONE (815) 942-2920 OPERATING STATUS NOTES J.

Unit Name: Dresden I

2.

Reporting Period:~se~p~t~e~m~b~e~r~*r,.-..;;1~9~8~0 ____________ _

3.

Licensed Thermal Power (MWt): 700

4.

Namep 1 ate Rating (Gross H\\.Je) :_2;....;0""'9...__ _______ '"-__ _

5.

Design Electrical Rating (Net M\\./e):

200

6.

Maximum Dependable Capacity (Gross.-M\\_.J_e.... )_:_2_0_5 __...._ ___

].

Maximum Dependable Capacity (Net MWe):

197

8.

If Changes Occur in Capacity Ratings..,.(_l_t-em_s_3_T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:

NA

9.

Power Level to \\*Jhich Restricted~.ff Any (Net MWe): NA

~----------------------

10.

Reasons.For Restrictions, If Any:. NA*

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

2 3.

24.

Hours in Repbrting Period*

Number of Hours Reactor Was Crit)cal Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hburs Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generate*d (M\\m)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capatity Facto~ (Using MOC 'Net)

Unit tapacity Factor (Using. DE~ Net)

Unit For~ed Outage Rate Th i.s Month Yr-to-Date.

Shutdowns Sche.duled Over Next 6 Months (Type, Date, and OuratTon of Each..

NA CurouJatiY~

.~***

25.

If Shut Down At End Of Report Period, Estimated Date of Start~pi Extended Modification k

Outage - Shutdown Until Jtiner 1986.

i

_OP~RATING DATA.REPORT

  • .* DO c ~ET NO. _o.::..:5::....:0:.....;..:;.24.:.:9:...-__ _

DATE Oct. 1, 1980 COMPLETED &Y S. Cieszkiewicz TELEPHONE (815) 942-2920 OPERATING STATUS NOTES

1.

Unit Name:. Dresdeti III

'--"'...... ~==-=--=-------------------------------

2.

Report in g Period : __

S_e.._p_t..,.em_b_e_r......... _1_9_8_0 __ ' -----------------

3.

Licensed Thermal Power (MWt):

2527

4.

Nameplate Rating (Gross M\\.Je):

828

s.

Design E 1 ect r i ca 1 Rating (Net-M-\\.J_e..,..)_:_7_9_4__,.---------------

6.

Maximum Dependable Capacity (Gross MWe): 812

7.

Maxi mum Dependab 1 e Capacity (Net MWe) :

7.....;7"""3~-----

8..

If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:

NA

9.

Power Level to \\*Jhich Restricted, If Any (Net MWe):. NA

~---

1 0.

Rea sons For Res er i ct ions, I f Any : _.....;N;.;;;A""-----------------------------------------------

11.
12.
13.
14.
15.
16.

17..

18.

19~

20..

21.
22.
23.
24.

Hou~s in Reportin~ Period Numb~r of Ho~rs Reactor.Was Crit~tal Reactor Reserve Shutdown Hours Hou~s. Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Grtiss Electrical Energy Generat~d (MWH)

Net E 1 ect r i ca 1 Energy Generated (MWH)

Unit Service Factor*

Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Us.ing DER:.Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6.Months NA This Month Yr-co-Date Curnulati'lC.

Z2Q 2.222 6Q,§l2 720 4,346.45 60, 111,7Z.

0 0

0 720 41255.30 5.7 1579.83 0

0 0

117441487 914401253

-111 1711 1920 5591047 310121445 36 1442 1119. 25 5301740 218471900.6 3415411191.569 lQQ 62 Zl 100 65 71 95 56 55 93 55 54 3

(Type, Da~e, and Du~ation of Each):

16 2.5.

If Shut Down At End Of Report Period, Estimated Date of Startup:_NA_. _____ _

/,

  • OPERATING DATA REPORT

. DO c KET. Nb.---'0'-"'5..-0-_,2.,..3.... 7 _____ _

DATE Oct. l~ 1980

  • COMPLETED BY S. Cieszkiewicz *

. TELEPHONE. (815) 942-2920 OPERATING STATUS NOTES.

1.. Un rt Name: Dresden tr

....;;.."'"""'~~-'---------------------------------

2.

Report i n g Per i ad : _. -'S;;...e;..op_t;...;e"'"m'-b..;.e_r.._, -'"-19'-8~0._._, ________________ _

3.

Licensed*Thermal Power (MWt):

2527


...---------------~

4.

Nameplate Rating (Gross M\\.Je):

  • 828

"..------------------~

5.

Design Electrical Rating (Net M\\.Je):

794

6.
  • Maximum Dependable Capacity (Gross -M-\\.J-e.... )_: __

8_12 ______ _

17.

Maximum Dependable Capacity (Net M\\.J~):

772

8.

If Cl:ianges Occur in Capacity Rat'ings _(_1-.t--em=s-3 __ T_h_r_o_u_g_h 7) Since.Last Report, Give Reasons:

NA

9.

Power Level to \\.Jh_ich Restricted., If Any (Net MWe): NA.


~

10.

Reasons For Restrictions, If Any: N

11.
12.
13.
14.
15.

16;

17.
18.
19.

20..

21.
22.

2 3.

. 24.

  • This Month

'(r-to-,Date Hou~s ~n R~porting Period 120 6 575 Number of Hours Reactor Was Critical 704.47 6.371.85.

Reactor Reserve Shutdown Hours O

O Hours Generator On-Line 641.95 6.243.48 U~it Reserve Shutd6wn Hours 0

0 Gross The.rmal *Energy Generated _(MWH) 978,210 13,142,113

.Gross Electrical Energy Generated (MWH) 291,740 4,107,690 Net. Electrical Energy Generated. (MWH) 270,200 3,880,347.4

_Unit Service Factor 89 95 Unit Availability Factor

89.

95 Unit Capacity Factor {Using MDC Net) 49 76 Unit Capacity Fact6r (Using DER Net)*

47

  • 74 Curuulati'le.

91,031 71.108. 28 O*

67.506.02 0

134,783,945 43,114, 309 40,768,458.617 74 74 58 56 14 Unit Forced Outa~e Rate 11 2

Shutdowns.Scheduled Over Next 6'Months (Type, Date, and Duration of Each):

NA 25..

If Shut Down At End Of Report Period, Estimated Date of Startup: NA I.

\\

No.

Date 8

781031 L *~*.::1*:

f' I'.*

~.

.i_.~*:>~***_i.

,~',:;*,*;?*

. (.

.a*t.

. I

~... **

.. *. \\

,.,... _;r:.

  • ./

~, **

Fl Forced St

  • Schedu,ed
0.

~

s 2

UNIT SllUTOO\\IHS ANO POWER REOUCTIOUS' uuu:l I 111 L _.:::0,::.5~0~...:o:!..:1::..:0~---

uu IT tll\\llE Dresden I 01\\ TE

  • October 1, 1980 COH~lETEO OV s. A. Cieszkiewicz.

REPORT HONTlf SEPTEMBER*,*. 1980 TElEPHOUE. (815) 942-2920 i:-

0 Cit

  • - *.L,

..., :J.

0

... :c

J-C>.

720 f

_I,.:.*:*.

N c 0

VI

~

I..

0 0 i;riµ c u

. "O *-

IQ 0.., ti

.t: u a:.

&J.:J ti.c

~

'J: ti) 0

. I*

neosoni licensee Event Report I

.. ':~

A-Equipment F'a I luro (E><plnin) '

b-H~lntenonco of Te~t C-Refuellng

... /.

D-nagu1otory n~strlcllon G.::t CIJ. ti u -0 VI 0

>-U

.en.

~-Opa~ato~ lr~lnlng g llc~nse ~xomln~

i F~Admlhl~tratlve 1 ~-\\

u c:

.~nG)

O"O

§'8 u

Cause & Co~rectlve l\\c t.1 on to Prev~nt Recu~rence Major work scheduled to be perfbrme~ this *

  • outage: '.
1)

HPCI installation for ECCS upgrading r

2)

Equipment upgrade. to IEEE 279.

'.~.

3)

M~jo~ Inser~ic~ Inspectton

4)
  • Chemicaf Cl~ahing

. 5)

Ref~e1

.~-Operotlonal ~rror H-Other* (Explain)

~-other (Explain)

Exhibit G*lnstructlons. for l

Met hod:

  • Pre~arntlon of Oat~ *
  • 1-Hanua I 2-fhinua 1 Ser om J-Auio~ntlc Scrnm

£nt~y Sheetg fr-licensee

£vent Rcporr (

)Flfc(NUREG~

0161)

(

~-...

No~

Date

7.

801023

~.

  • 1* :'" -~

.. ~

  • . ~. :~.:. '

l Ft Forced St

  • Scheduled

(~**;,.;.,

GJ D.

F u111..1*:Lr 1111; 050-231*

__:=.;:;.....:=~-.,--~~~-

UN IT SllUTDO\\.ll~S /\\NO POWER REDUCT I Olis** *

' UUI T W\\llE: Dresden II 0/\\ T£ October 1, 1980 REPORT MONTH **.SEPTEMBER a 1980

  • COMPLETED IJV s. A. Cieszkiewicz TElEPHotlE (815) 942-2920
  • i:-

0 In

... ~

. "' 0

\\. ::x:

~-

D 78.05 I

~ :

N c 0

VI

~

A

"" \\.

~.. 0 0

t1I µ c u "O *-

IQ 0.., G)

.c "' a::..

u

~-

".c: i:

_2:tn i 0

3

. I.*

\\

\\

ne~sont Licensee Event Report I

  • A-Equipment Fal luro (E><plnin) '

8-Httlntenanco of Test t-Refuellng 1.

D-ncgulotory Rcstrlcllon

~-Operator Training g llc~nse Examlna i

F-AdmlnlslrAtlve

(~

u.

c GJn

. t: ti 0"0 0- 0 su u

Cause t Corrective l\\ctlon to Prev~nt Recurrence Reactor scrammed on low vacuum - excessive*

. air in-: leakage.into* condenser froni *"c" turbii\\e hood; also, "B'~ air ejectqr';main steam supply lifted and exhausted t~...

condenser~.*

~

G-Operotlona1 F.rror

. H-Other (Exp1Bln)

~-other (Explafn)

~- Exhibit ~-Instructions. for 3 Hcthod:

Preparation of Data

..

  • 1-Manua I 2-1,anua I Ser om J-/\\utointtt le Scram.

Entry Sheet9 fr-llcens~c Event R~port (

)Fllc(ttUREG~

0161)

(

'i*

    • i_'

No.

Date

.... -~..

. {.}'*:\\*.*_.

~. ' \\

    • .*1....

.'."1;'*

i:*.* **

Ft Forced St

  • Scheduled UN It SllUTOO\\./l~S /\\ND POWE.R REDUCT I Otis"...

REPORT MONTH SEPTEMBER, 1980 0

u.

c-N 0

C1'4J c

-41 0 "'

c c "

licensee

-~...

. GJ1'.

0 "O* *-

'c ti

0.
J VI 0 u ~-

Event 4-'"0 0"0

"' 0 fU

.c "' CC:,

0

o. 0 t:-

"' :c GI

&.I :J t:

Report I

>-U eu

J-0

' i:.. * '

i,.......

tt:

ti..c

~"' ~

0

-\\.

  • I

\\

neasont A~Equlpmcnt Fa I lute (Ex1>lnln) '

8-H~lnteridnce of Test

. C-Refuellng 1.

  • b-Rcgulotory Rcsfrlellon t-Opcrat~r Jralnlng g Llc~nse F-Adml.hl sttnt Ive Examine i

r~*\\'

0 u I

G-Operotlonal F.rror H-Other (Explain) 3 Method:*

  • I -11anua 1 2-llonual Scrnm j-1\\utonmt le Scram UIJ tr: l I 111 I. _;0.;:.5.;;:.0_;-2~4.:..::9:...-=-=-=---

. UU IT tl/\\11[ Dresden III 01\\ TE October 1, 1980 COHPLETEO BY S. A. Cieizkiewicz TELEPHotlE (815) 942-2920 C~~se t Correctl~e

/\\ctlon to P~event Recuirence r

1:

~ -

I i

~-other (Exp 1 a j n)

Exhibit G*lnstructlo~s.fo~

Pteparntlon of Oatn

~ntry Sheet9 fr-llcens~c F.vent Repotr (

)Ff lc(UUREG*

0'161)

{

l j t

(

NATURE OF EQUIPMENT HAIUTENANCE. *

,40-49D 1PRM Preventive WR :/17459 (CH :/16)

Diesei Generato Preventive WR :/17314.

Cooler*

-tlsel* Generato Preventive WR ://8091 1PRM 16-41B Preventive WR :/I 745 7 (l\\PRM 5) 1PRM.16-17C Preventive WR #7458

  • (Group*l)

As*co Solenoid

  • - Preventive. WR :/11510 -

Valves-in Dry-well Rx Bldg. 125VDC Preventive. WR ://8860 Circuit :/17 2"A" 1PCI Pump Preventive WR :/18465 e

DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - SEPTEMBER, 1980 LER OR OUTAGE NUMBER Outage :/12-6 Outage :/12-6 1ER 80-27/031-0 Outage :/li-6 Outage*:/t2-6 Outage :/12-~

  • I Outage. _:/12:...6

. I

  • Outage f2-6
  • 1ER 80-30/031-0
  • Out_age :/12-6 MAL FUN CTI ON
  • CAUSE NA NA
  • NA NA-NA NA NA
  • .NA RESULT NA NA NA NA NA NA NA

.. NA i

CORRECTIVE ACTION Replaced ~able connector~

Plugged leaking tubes, installed 1new ~~skets.

Installed.plugs & gaskets.

J Replaced cable: connector.

Replaced cable connector.

Replaced valves & dia-phragms..

  • Repaired ~y O,A.D.

Changed s~al,* flushed lines, changed flow switch.

DRESDEN UN IT 3 SAFETY RELATED MAINTENANCE.,.. SEPTEMBER, 1980 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT

  • M.A IUTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Cleanup Valve Preventive WR 418118 Outage 413-11 NA NA Cancelled.'

3:-1201.:4 CRD Accumulator Pre:ven ti ve

  • WR #8S47 Outage #3-11 NA NA Replace "7~1-Ve bonnet and 38-31 (K-8) stem;

.I Turbine

  • j Preventive WR 4/8011

. Outage 4{3-10 NA NA Replaced solenoid.

Inlet Drain Pot Drywell Equip-Preventive WR 411855 Ou tag~ #3-13 NA NA**

Cancelled.

ment Hatch:

I Diesel Genera to Preventive WR 417315 Outage 4!3-i 13 NA NA Removed heads for tube Cooler-cleaning.

Diesel Genera to Preventive WR 418605 Outage #3-13 NA.

NA Performed quarterly inspection.

i HCU 38-31 Star Preventive WR #903i Outage 413-13 NA NA_

Replaced pacI<tng.

Valve Packing e

EQUIPMENT.

NATURE OF MAHITENANCE Diesel Generato Preventive WR #8088 DRESDEN UNIT 2/3 SAFETY RELATED -MAINTENANCE:- SEPTEMBER, 1980 MALFUNCTION*

LER OR OUTAGE NUMBER CAUSE RESULJ I *t NA NA

. I CORRECTIVE ACTION*

Performed semi-annual

  • ins-,,ection.
  • e-;
  • ~

SUMMARY

.. OF OP~RATING EXPERIENCE UNIT ONE 9-1 to 9-30 SEPTE~ER, 1980.

Unit One was shutdown for the entire month, ~waiting. license approval for the chemical cleaning.

Major work scheduled to be compieted following chemical cleaning is as follows:

HPCI installation for ECCS upgrading, equip-ment upgrade to IEEE 279, major in-service inspettion~ and r~fuel.

I.

. i

SUMMARY

OF OPERATING EXPERIENCE 9-1 to g.;..23 9-23 to 9-26 UNIT TWO SEPTEMBER, 1980 Unit Two started thi mortth operating at a power level of. 465 MWe.

On September 23, at 0529, the Unit scrammed on low vacuum, due to the "B" air ejector main' steam supply re~ief valve lifting and exhausting to the

. condenser.

In addition, a second source of air in-leakag~was discovered on "C" turbine hood and promptly repaired.

The reactor was brought critical at 2101. on September 23, but the Unit re-mained off system until all major sources of in-leakage were found and repaired.

9-26.to 9-30 The Unit was placed back on the system at 1132 onSeptember 26 and continued operating through the remainder of the I.

month,reachinga power level of 413 MWe, with a capacity factor and availability of47% and 89%, respectively *

  • e I

SUMMARY

OF OPERATING EXPERIENCE UNIT THREE SEPTEMBER, 1980 9-1 to 9-30 Unit Three operated continuously during the month of September, with a capacity factor and availability of 93% and 100%, respectively, with no significant problems, at an average load of 742.MWe.

'*