e AVERAGE DA I LY UN IT POWER LEVEL
~.
\\
DOCKET N0.050-010 Utl I TDresden I DATE October 1 ! 1980 COMPLETED. BYS. Cieszkiewicz TELEPHONE(815) 942-2920 MONTH SEPTEMBER, 1980 DAY AVERAGE DAILY PO\\.JER LEVEL DAY AVERAGE DA I LY PO\\.JER LEVEL (MWe-Net)
(M\\.Je-Net) 0 17 0
2 0
18 o:
3 0
19 0
4 0
20 0
/
5.
0
- 21 0
\\
6 0
22 0
7 0
23 0
8 24
.o 9
0 25 0
10 0
26 0
11 0
27 0
12
- O 28 0
13 0
29 0
14 0
30 0
15 0
31 I.
16 0
so1021 o...,~I
AVERAGE DAI LY UNIT POWER LEVEL DOCKET NO. 050-237
- Utl IT Dresden II DATE October 1, 1980.
COM.PLETED* BY S ~ Cieszkiewicz TELEPHONE MONTH SEPTEMBER~* 1980 D8Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DA I LY PO\\.JER LEVEL
. (MWe-Net)
(M\\~e-Net) 17 2
464 18 3
422 19 429 4
459 20 423
\\.
5 459 21 422.
6 454 22
. 420..
7 449 23 72 8
447 24 b
9 441 25 0
10 439 26 147 11 437 27 326 12.*
28 333 13 435 29 382 14 439 30 413 15 434 31 16 431
- .e AVERAGE DAI LY UNIT POWER LEVEL DOCKET NO. 050-249 Ull IT Dresden III DATE October 1, 1980 COMPLETED BY s. Cieszkiewicz
- TELEPHONE (815) 942-2920 MONTH SEPTEMBER, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA I LY PO\\~ER LEVEL (MWe-Net)
(M\\*Je-Net) 614 17 736 2
726 18 771 3
755 19
. 773 4
767 20 745 5
770 il 767 6
22.
6 7
628 23 768 8
765 24 769 9
766
-25 770 10 767
- 26.
746 11 743 27 486 12 765.
28 705 13 743.
29 768 768 30 762 14 15 769 31
- 16.
i \\
OPERATING DATA REPORT DOCKET NO.
050~010.
-=~-----------
DATE Oct. 1, 1980.
COMPLETED BY S. A. Cieszkiewi' fEL~PHONE (815) 942-2920 OPERATING STATUS NOTES J.
Unit Name: Dresden I
- 2.
Reporting Period:~se~p~t~e~m~b~e~r~*r,.-..;;1~9~8~0 ____________ _
- 3.
Licensed Thermal Power (MWt): 700
- 4.
Namep 1 ate Rating (Gross H\\.Je) :_2;....;0""'9...__ _______ '"-__ _
- 5.
Design Electrical Rating (Net M\\./e):
200
- 6.
Maximum Dependable Capacity (Gross.-M\\_.J_e.... )_:_2_0_5 __...._ ___
].
Maximum Dependable Capacity (Net MWe):
197
- 8.
If Changes Occur in Capacity Ratings..,.(_l_t-em_s_3_T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to \\*Jhich Restricted~.ff Any (Net MWe): NA
~----------------------
- 10.
Reasons.For Restrictions, If Any:. NA*
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
2 3.
- 24.
Hours in Repbrting Period*
Number of Hours Reactor Was Crit)cal Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hburs Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generate*d (M\\m)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capatity Facto~ (Using MOC 'Net)
Unit tapacity Factor (Using. DE~ Net)
Unit For~ed Outage Rate Th i.s Month Yr-to-Date.
Shutdowns Sche.duled Over Next 6 Months (Type, Date, and OuratTon of Each..
NA CurouJatiY~
.~***
- 25.
If Shut Down At End Of Report Period, Estimated Date of Start~pi Extended Modification k
Outage - Shutdown Until Jtiner 1986.
i
_OP~RATING DATA.REPORT
- .* DO c ~ET NO. _o.::..:5::....:0:.....;..:;.24.:.:9:...-__ _
DATE Oct. 1, 1980 COMPLETED &Y S. Cieszkiewicz TELEPHONE (815) 942-2920 OPERATING STATUS NOTES
- 1.
Unit Name:. Dresdeti III
'--"'...... ~==-=--=-------------------------------
- 2.
Report in g Period : __
S_e.._p_t..,.em_b_e_r......... _1_9_8_0 __ ' -----------------
- 3.
Licensed Thermal Power (MWt):
2527
- 4.
Nameplate Rating (Gross M\\.Je):
828
- s.
Design E 1 ect r i ca 1 Rating (Net-M-\\.J_e..,..)_:_7_9_4__,.---------------
- 6.
Maximum Dependable Capacity (Gross MWe): 812
- 7.
Maxi mum Dependab 1 e Capacity (Net MWe) :
7.....;7"""3~-----
8..
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to \\*Jhich Restricted, If Any (Net MWe):. NA
~---
1 0.
Rea sons For Res er i ct ions, I f Any : _.....;N;.;;;A""-----------------------------------------------
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
17..
- 18.
19~
20..
- 21.
- 22.
- 23.
- 24.
Hou~s in Reportin~ Period Numb~r of Ho~rs Reactor.Was Crit~tal Reactor Reserve Shutdown Hours Hou~s. Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Grtiss Electrical Energy Generat~d (MWH)
Net E 1 ect r i ca 1 Energy Generated (MWH)
Unit Service Factor*
Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Us.ing DER:.Net)
Unit Forced Outage Rate Shutdowns Scheduled Over Next 6.Months NA This Month Yr-co-Date Curnulati'lC.
Z2Q 2.222 6Q,§l2 720 4,346.45 60, 111,7Z.
0 0
0 720 41255.30 5.7 1579.83 0
0 0
117441487 914401253
-111 1711 1920 5591047 310121445 36 1442 1119. 25 5301740 218471900.6 3415411191.569 lQQ 62 Zl 100 65 71 95 56 55 93 55 54 3
(Type, Da~e, and Du~ation of Each):
16 2.5.
If Shut Down At End Of Report Period, Estimated Date of Startup:_NA_. _____ _
/,
- OPERATING DATA REPORT
. DO c KET. Nb.---'0'-"'5..-0-_,2.,..3.... 7 _____ _
DATE Oct. l~ 1980
- COMPLETED BY S. Cieszkiewicz *
. TELEPHONE. (815) 942-2920 OPERATING STATUS NOTES.
- 1.. Un rt Name: Dresden tr
....;;.."'"""'~~-'---------------------------------
2.
Report i n g Per i ad : _. -'S;;...e;..op_t;...;e"'"m'-b..;.e_r.._, -'"-19'-8~0._._, ________________ _
- 3.
Licensed*Thermal Power (MWt):
2527
...---------------~
- 4.
Nameplate Rating (Gross M\\.Je):
- 828
"..------------------~
- 5.
Design Electrical Rating (Net M\\.Je):
794
- 6.
- Maximum Dependable Capacity (Gross -M-\\.J-e.... )_: __
8_12 ______ _
- 17.
Maximum Dependable Capacity (Net M\\.J~):
772
- 8.
If Cl:ianges Occur in Capacity Rat'ings _(_1-.t--em=s-3 __ T_h_r_o_u_g_h 7) Since.Last Report, Give Reasons:
NA
- 9.
Power Level to \\.Jh_ich Restricted., If Any (Net MWe): NA.
~
- 10.
Reasons For Restrictions, If Any: N
- 11.
- 12.
- 13.
- 14.
- 15.
16;
- 17.
- 18.
- 19.
20..
- 21.
- 22.
2 3.
. 24.
- This Month
'(r-to-,Date Hou~s ~n R~porting Period 120 6 575 Number of Hours Reactor Was Critical 704.47 6.371.85.
Reactor Reserve Shutdown Hours O
O Hours Generator On-Line 641.95 6.243.48 U~it Reserve Shutd6wn Hours 0
0 Gross The.rmal *Energy Generated _(MWH) 978,210 13,142,113
.Gross Electrical Energy Generated (MWH) 291,740 4,107,690 Net. Electrical Energy Generated. (MWH) 270,200 3,880,347.4
_Unit Service Factor 89 95 Unit Availability Factor
- 89.
95 Unit Capacity Factor {Using MDC Net) 49 76 Unit Capacity Fact6r (Using DER Net)*
47
- 74 Curuulati'le.
91,031 71.108. 28 O*
67.506.02 0
134,783,945 43,114, 309 40,768,458.617 74 74 58 56 14 Unit Forced Outa~e Rate 11 2
Shutdowns.Scheduled Over Next 6'Months (Type, Date, and Duration of Each):
NA 25..
If Shut Down At End Of Report Period, Estimated Date of Startup: NA I.
\\
No.
Date 8
781031 L *~*.::1*:
f' I'.*
~.
.i_.~*:>~***_i.
,~',:;*,*;?*
. (.
.a*t.
. I
~... **
.. *. \\
,.,... _;r:.
- ./
~, **
Fl Forced St
- Schedu,ed
- 0.
~
s 2
UNIT SllUTOO\\IHS ANO POWER REOUCTIOUS' uuu:l I 111 L _.:::0,::.5~0~...:o:!..:1::..:0~---
uu IT tll\\llE Dresden I 01\\ TE
- October 1, 1980 COH~lETEO OV s. A. Cieszkiewicz.
REPORT HONTlf SEPTEMBER*,*. 1980 TElEPHOUE. (815) 942-2920 i:-
0 Cit
- - *.L,
..., :J.
0
... :c
- J-C>.
720 f
_I,.:.*:*.
N c 0
VI
~
I..
0 0 i;riµ c u
. "O *-
IQ 0.., ti
.t: u a:.
&J.:J ti.c
~
'J: ti) 0
. I*
neosoni licensee Event Report I
.. ':~
A-Equipment F'a I luro (E><plnin) '
b-H~lntenonco of Te~t C-Refuellng
... /.
D-nagu1otory n~strlcllon G.::t CIJ. ti u -0 VI 0
>-U
.en.
~-Opa~ato~ lr~lnlng g llc~nse ~xomln~
i F~Admlhl~tratlve 1 ~-\\
u c:
.~nG)
O"O
§'8 u
Cause & Co~rectlve l\\c t.1 on to Prev~nt Recu~rence Major work scheduled to be perfbrme~ this *
- outage: '.
- 1)
HPCI installation for ECCS upgrading r
- 2)
Equipment upgrade. to IEEE 279.
'.~.
- 3)
M~jo~ Inser~ic~ Inspectton
- 4)
- Chemicaf Cl~ahing
. 5)
Ref~e1
.~-Operotlonal ~rror H-Other* (Explain)
~-other (Explain)
Exhibit G*lnstructlons. for l
Met hod:
- Pre~arntlon of Oat~ *
- 1-Hanua I 2-fhinua 1 Ser om J-Auio~ntlc Scrnm
£nt~y Sheetg fr-licensee
£vent Rcporr (
)Flfc(NUREG~
0161)
(
~-...
No~
Date
- 7.
801023
~.
- 1* :'" -~
.. ~
- . ~. :~.:. '
l Ft Forced St
- Scheduled
(~**;,.;.,
GJ D.
F u111..1*:Lr 1111; 050-231*
__:=.;:;.....:=~-.,--~~~-
UN IT SllUTDO\\.ll~S /\\NO POWER REDUCT I Olis** *
' UUI T W\\llE: Dresden II 0/\\ T£ October 1, 1980 REPORT MONTH **.SEPTEMBER a 1980
- COMPLETED IJV s. A. Cieszkiewicz TElEPHotlE (815) 942-2920
- i:-
0 In
... ~
. "' 0
\\. ::x:
~-
D 78.05 I
~ :
N c 0
VI
~
A
"" \\.
~.. 0 0
t1I µ c u "O *-
IQ 0.., G)
.c "' a::..
u
~-
".c: i:
_2:tn i 0
3
. I.*
\\
\\
ne~sont Licensee Event Report I
- A-Equipment Fal luro (E><plnin) '
8-Httlntenanco of Test t-Refuellng 1.
D-ncgulotory Rcstrlcllon
~-Operator Training g llc~nse Examlna i
F-AdmlnlslrAtlve
(~
- u.
c GJn
. t: ti 0"0 0- 0 su u
Cause t Corrective l\\ctlon to Prev~nt Recurrence Reactor scrammed on low vacuum - excessive*
. air in-: leakage.into* condenser froni *"c" turbii\\e hood; also, "B'~ air ejectqr';main steam supply lifted and exhausted t~...
condenser~.*
~
G-Operotlona1 F.rror
. H-Other (Exp1Bln)
~-other (Explafn)
~- Exhibit ~-Instructions. for 3 Hcthod:
Preparation of Data
..
- 1-Manua I 2-1,anua I Ser om J-/\\utointtt le Scram.
Entry Sheet9 fr-llcens~c Event R~port (
)Fllc(ttUREG~
0161)
(
'i*
- i_'
No.
Date
.... -~..
. {.}'*:\\*.*_.
~. ' \\
- .*1....
.'."1;'*
i:*.* **
Ft Forced St
- Scheduled UN It SllUTOO\\./l~S /\\ND POWE.R REDUCT I Otis"...
REPORT MONTH SEPTEMBER, 1980 0
- u.
c-N 0
C1'4J c
-41 0 "'
c c "
licensee
-~...
. GJ1'.
0 "O* *-
'c ti
- 0.
- J VI 0 u ~-
Event 4-'"0 0"0
"' 0 fU
.c "' CC:,
0
- o. 0 t:-
"' :c GI
&.I :J t:
Report I
>-U eu
- J-0
' i:.. * '
i,.......
tt:
ti..c
~"' ~
0
-\\.
- I
\\
neasont A~Equlpmcnt Fa I lute (Ex1>lnln) '
8-H~lnteridnce of Test
. C-Refuellng 1.
- b-Rcgulotory Rcsfrlellon t-Opcrat~r Jralnlng g Llc~nse F-Adml.hl sttnt Ive Examine i
r~*\\'
0 u I
G-Operotlonal F.rror H-Other (Explain) 3 Method:*
- I -11anua 1 2-llonual Scrnm j-1\\utonmt le Scram UIJ tr: l I 111 I. _;0.;:.5.;;:.0_;-2~4.:..::9:...-=-=-=---
. UU IT tl/\\11[ Dresden III 01\\ TE October 1, 1980 COHPLETEO BY S. A. Cieizkiewicz TELEPHotlE (815) 942-2920 C~~se t Correctl~e
/\\ctlon to P~event Recuirence r
1:
~ -
I i
~-other (Exp 1 a j n)
Exhibit G*lnstructlo~s.fo~
Pteparntlon of Oatn
~ntry Sheet9 fr-llcens~c F.vent Repotr (
)Ff lc(UUREG*
0'161)
{
l j t
(
NATURE OF EQUIPMENT HAIUTENANCE. *
,40-49D 1PRM Preventive WR :/17459 (CH :/16)
Diesei Generato Preventive WR :/17314.
Cooler*
-tlsel* Generato Preventive WR ://8091 1PRM 16-41B Preventive WR :/I 745 7 (l\\PRM 5) 1PRM.16-17C Preventive WR #7458
- (Group*l)
As*co Solenoid
- - Preventive. WR :/11510 -
Valves-in Dry-well Rx Bldg. 125VDC Preventive. WR ://8860 Circuit :/17 2"A" 1PCI Pump Preventive WR :/18465 e
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - SEPTEMBER, 1980 LER OR OUTAGE NUMBER Outage :/12-6 Outage :/12-6 1ER 80-27/031-0 Outage :/li-6 Outage*:/t2-6 Outage :/12-~
- I Outage. _:/12:...6
. I
- Outage f2-6
- 1ER 80-30/031-0
- Out_age :/12-6 MAL FUN CTI ON
- CAUSE NA NA
- NA NA-NA NA NA
- .NA RESULT NA NA NA NA NA NA NA
.. NA i
CORRECTIVE ACTION Replaced ~able connector~
Plugged leaking tubes, installed 1new ~~skets.
Installed.plugs & gaskets.
J Replaced cable: connector.
Replaced cable connector.
Replaced valves & dia-phragms..
- Repaired ~y O,A.D.
Changed s~al,* flushed lines, changed flow switch.
DRESDEN UN IT 3 SAFETY RELATED MAINTENANCE.,.. SEPTEMBER, 1980 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT
- M.A IUTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Cleanup Valve Preventive WR 418118 Outage 413-11 NA NA Cancelled.'
3:-1201.:4 CRD Accumulator Pre:ven ti ve
.I Turbine
- j Preventive WR 4/8011
. Outage 4{3-10 NA NA Replaced solenoid.
Inlet Drain Pot Drywell Equip-Preventive WR 411855 Ou tag~ #3-13 NA NA**
Cancelled.
ment Hatch:
I Diesel Genera to Preventive WR 417315 Outage 4!3-i 13 NA NA Removed heads for tube Cooler-cleaning.
Diesel Genera to Preventive WR 418605 Outage #3-13 NA.
NA Performed quarterly inspection.
i HCU 38-31 Star Preventive WR #903i Outage 413-13 NA NA_
Replaced pacI<tng.
EQUIPMENT.
NATURE OF MAHITENANCE Diesel Generato Preventive WR #8088 DRESDEN UNIT 2/3 SAFETY RELATED -MAINTENANCE:- SEPTEMBER, 1980 MALFUNCTION*
LER OR OUTAGE NUMBER CAUSE RESULJ I *t NA NA
. I CORRECTIVE ACTION*
Performed semi-annual
- ins-,,ection.
- e-;
- ~
SUMMARY
.. OF OP~RATING EXPERIENCE UNIT ONE 9-1 to 9-30 SEPTE~ER, 1980.
Unit One was shutdown for the entire month, ~waiting. license approval for the chemical cleaning.
Major work scheduled to be compieted following chemical cleaning is as follows:
HPCI installation for ECCS upgrading, equip-ment upgrade to IEEE 279, major in-service inspettion~ and r~fuel.
I.
. i
SUMMARY
OF OPERATING EXPERIENCE 9-1 to g.;..23 9-23 to 9-26 UNIT TWO SEPTEMBER, 1980 Unit Two started thi mortth operating at a power level of. 465 MWe.
On September 23, at 0529, the Unit scrammed on low vacuum, due to the "B" air ejector main' steam supply re~ief valve lifting and exhausting to the
. condenser.
In addition, a second source of air in-leakag~was discovered on "C" turbine hood and promptly repaired.
The reactor was brought critical at 2101. on September 23, but the Unit re-mained off system until all major sources of in-leakage were found and repaired.
9-26.to 9-30 The Unit was placed back on the system at 1132 onSeptember 26 and continued operating through the remainder of the I.
month,reachinga power level of 413 MWe, with a capacity factor and availability of47% and 89%, respectively *
- e I
SUMMARY
OF OPERATING EXPERIENCE UNIT THREE SEPTEMBER, 1980 9-1 to 9-30 Unit Three operated continuously during the month of September, with a capacity factor and availability of 93% and 100%, respectively, with no significant problems, at an average load of 742.MWe.
'*