Submits List of Current Qualification Programs for EPRI Util Equipment Qualification Owners Group Resulting from 800917 Meeting.Requests Info Re Which Program Best Fits NRC Schedule
ML17193A110
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 09/24/1980
From: Lamken D
COMMONWEALTH EDISON CO.
To: Rosztoczy Z
Office of Nuclear Reactor Regulation
References
TASK-03-12, TASK-3-12, TASK-RR NUDOCS 8010100361
Download: ML17193A110 (2)


Text

  • - e..

c&onwealth Edis~n...

One First National Plaza. Chicago; Illinois

.Address Reply to: Post Office Box.767.

Chicago, Jllinois 60690 Mr. Zolton Ro~ztoczy..

Nuclear Regulatory Commission

  • 7920 N~rfolk Avenue Bethesda Md 20014 Room 440

Subject:

l.11

~urrent Qu~lification Progr~ms Se pt ember 2 4*, 1980 (2). *. Util.ity Coordinator of EPRI Utility Equipment Qu~lification Owners Group

Dear M~~*Ro~ztoczy:

Reference is made. to our phone conversation of September 19, 1980 at which time we discussed subject matters in followup to the EPRI/NRC information exchan~e meeting held in Washington on September 17, 1980 *..

Cur~ent Qualific~tion Programs Based on your presentation at the meeting, it is my

. understanding that the NRC will soon issue requests to utilities, vendors and test labs for listings of ongoing and proposed equipment qualification programs to allow the NRC to implement its program of indepth,inspection *and witnessing of selected 1 icensee'/vendo.r qualification test.s.

In response to your verbal request of September 19, listed below is basic information on qualification.programs that

    • . Co mm o n we a 1 t h Ed i s o n
  • i s en g aged i n to g et h e r w i th o t h er ut i 1 i t i e s an d vendors *. Please revi~w this listing and let me know which progr~m fits
  • .your schedule~* Up~n notification from you~ I wfll take the initiative to contact th~ other participating utilities, vendors and test lab to gain their permission to release additional informatirin relative to the program.

It is Commonwealth Edfson's position that the proposed NRC program will be to our motual benefit but you must appreciate the fact that I cannot speak for the other participants in this regard.

The-generit equipment name and present schedule of these programs are as follows:*

A~

Pressu~~ Transmitters

. Sthedule* - Phase l testing completed by.12/80 and phase 2 by 9/81 (WEPCo is the lead utility of this program).*.

B~

Terminal Blocks Schedule: - Qualification plan being prepared.

Testing completed by 3/81 C ~ : SR V Mon it or i n g *system.*

Schedule - Qualification plan being finalized

~\\f D.

  • Valve Mon'itoring system Sch~dule - Qualification plan being finalized.

Testing c.ompleted by 3rd quarter, 1981 E.

Diesel Generator and Dies~l.Drives~.***

Schedule - Qu'al-ification plan approved by 11/80.

Testing 801010 0

... com~e,e; by 9/81 p.

  • \\'-....
  • F. *Diesel Generator.. <

Schedule, - Qualification plan being prepared.*. Testing

~omp 1 eted by 9/81

  • As we di s cussed ~ the. over a 1 l object i ve of qua li f y i n g es sent i a 1
  • *e.quipment.will be greatly enhanced if the NRC, as part of its proposed

. program, tssu~s specific ~ritten ~omfuents on those qualification plans.

. revi~wed by them~ If the qu~lification plan is acceptable to the NRC a w r i t ten s tat e In e n t to t h at e ff e ct s h o u 1 d b e is s u e d *. I f, t h e N R C h as

  • concerns. about portions of the* pla*n, timely verb.al notification.followed up *by ~rit~en comments lhould be issued.

Only with such feedback

~ari this program result in.me~ningful benefits to us all.

, Uiility Coordin~~or of EPRI/Utility Equipment Q~alification Owners Group G *

  • S *l i t er of E PR I, represent i n g the u t i 1 i t y members, ask e d me to serve*as utility coordinator of.the EPRI/UtilityEquipment Qualification Owners G~oup.

I have accepted the invitation to serve in this capacity*

and as such will be available to you and member~ of your staff to f a c il i t at e t h e f low of i n f o rm a: t i o n bet wee n t h e i n d u s t r y a n d. th e N R C i n the specific area of.equipment qualification.

G. Sliter will continue to coordinate the research aspects of EPRI funded wort.

    • The Owners Gr.oup meets twice a year, usually during the months of :May and November,

~ith an average.repre$entation of.approxfmately thirty utilities.

In the past,* many utilities have optioned to send different people to ~uccesive meetings with the result that overall continuity has not been mai.ntained.

At the information exchange meetings held with the NRC in June and September of this year, the industry was rep~es~nted by an informal.ad hoc committees made up of individuals who

.are. both* active _in 'the field arid who have attended most, if not al 1, of the EPRI sponsored equipment qualification meetings.

Approximately ten utilities are repres~nted on this committee giving it a good cross

. section of operating experience and providing it with a good ba~e of

. technical experience.

If information ~xchange ~eeting are required in the futur~ it is my intention to invite the members of the ad.hoc committee to represen~ the industrj together with G. Sliter of EPRI.

Any ~orrespondence sh~uld be sent to my attenti6n at:

DCL/sb/6917A Co~mohw~alth Edison Co~

St at io n ' Nu c le a r En g i n e er i n g De p art me n t P

  • 0
  • B ox 76 7 Ch.icago., Illinois_*. 60690.
  • Room (35 FNW) * * *
  • Phone:

(312) 294-2841. * *

).

-~~&k D.C. Lamken.

Senior Engineer*

s t at i o n N u c.1 e a r

  • Enginee~ing Department