Requalification Program Inspection 05000395/2017003
ML17192A274
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/07/2017
From: Gerald Mccoy
Division of Reactor Safety II
To: Lippard G
South Carolina Electric & Gas Co
References
IR 2017003
Download: ML17192A274 (5)


See also: IR 05000395/2017003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

July 7, 2017

Mr. George A. Lippard III, Vice President

Nuclear Operations

South Carolina Electric & Gas Company

Virgil C. Summer Nuclear Station

P.O. Box 88, Mail Code 800

Jenkinsville, SC 29065

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VIRGIL C. SUMMER

NUCLEAR STATION UNIT 1 - 05000395/2017003

Dear Mr. Lippard:

In a telephone conversation on July 5, 2017, Mr. David Lanyi, Senior Operations Engineer, and

Mr. Eric Warden, Supervisor Nuclear Training Requalification Programs, made arrangements

for the NRC to inspect the licensed operator requalification program at the Summer Nuclear

Station Unit 1. The inspection is planned for the week of August 14, 2017, which coincides with

your regularly scheduled requalification examination cycle. The staff at your facility should

prepare and conduct the requalification examinations in accordance with your NRC-approved

requalification program. It is our understanding that you have committed to maintain your plant-

referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for

Nuclear Power Plant Simulators for Use in Operator Training and Examination.

In accordance with 10 CFR 55.59, the NRC has requested that you submit by July 21, 2017, the

material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection

program needs. The NRC has further requested that you have all items as specified in

paragraph B of the Enclosure available for review for the inspectors on the first day they arrive

on site. Mr. Warden has been advised of this request and provided with the name and address

of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018).

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, and completing and reviewing the collection of information. Send comments on any

aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0101), Office of Management and Budget, Washington, DC 20503.

G. Lippard

2

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this

inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),

or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos.: 50-395

License Nos.: NPF-12

Enclosure: Materials Request List

cc: Distribution via Listserv

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

DRL2 VIA

EMAIL

GJM1

NAME

DLANYI

GMcCOY

DATE

7/7/2017

7/7 /2017

7/ /2017

7/ /2017

7/ /2017

7/ /2017

7/ /2017

E-MAIL COPY?

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

YES

NO

Enclosure

Materials Request List

The items listed below are necessary to support the Licensed Operator Requalification Program

inspection (IP-71111.11) in August, 2017 at Summer Nuclear Station Unit 1. Items listed under

In-office inspection material must be received in the NRC Region II office by the due dates

specified below. Items listed under On-site inspection material should be ready for review

upon arrival of the inspectors on August 14, 2017.

A.

In-office inspection material:

1. List of all licensed individuals (active and inactive; RO and SRO) including license

restrictions (July 21, 2017)

2. Organizational Chart for the training department, including the simulator fidelity staff,

with phone number/email contact information (July 21, 2017)

3. Weekly examination schedules for the weeks that the 2017 annual operating exams will

be administered, including a list of personnel scheduled for testing the week of August

14. 2017 (July 21, 2017)

4. All 2017 biennial written examinations, final answer keys, re-take examinations (if any),

and spreadsheets or outlines that show the usage of written examination questions on

the different versions of these written examinations (July 21, 2017)

5. Site procedure(s) governing the conduct (process and content) of license operator

requalification training (classroom and simulator), examination

development/administration, remedial training, and examination security (July 21, 2017)

6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity

testing methods used to fulfill ANSI/ANS 3.5-1985 requirements (July 21, 2017)

7. All JPMs, including spreadsheets or outlines that show the usage of the JPMs in all of

the 2017 annual exam weeks (July 21, 2017, EXAM SECURITY RELATED)

8. All simulator scenarios that will be administered in the 2017 annual exam weeks,

including which scenarios are assigned to a specific week (July 21, 2017, EXAM

SECURITY RELATED)

9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since

August 2015 (last biennial requalification inspection), which document operator errors or

performance problems that occurred in the actual plant/main control room, including the

corrective actions (July 21, 2017)

B.

On-site inspection material (due August 14, 2017):

1. Requalification training attendance records for the current two year biennial training

cycle

2. Examination results since last requalification inspection (weekly operating & written

examinations); copies of examinations with pass/failure rates outside the average

3. Copies of the simulator scenarios for the inspectors to observe the operating crews and

evaluators

4. All remedial training documentation for any licensed operator that failed an examination

since the last requalification inspection

5. List of all operators that reactivated their licenses since the last requalification inspection

6. Records that support verification of time on shift under instruction and complete plant

tours for both the reactivating operator and the supervising active license, including

a. Documentation of time on shift under instruction

b. Any Security system and/or HP/dosimetry records for plant areas toured by

reactivating individual and accompanying licensed operator

7. Records providing documentation of maintenance of active license status (time on shift)

for all licensed operators since last requalification inspection

2

8. Medical records for all licensed (active and inactive) operators.

9. Simulator maintenance and testing records, including:

a. List of all open simulator discrepancies

b. List of all simulator discrepancies closed within the past 12 months

c. List of simulator performance tests

d. Simulator performance testing records and associated documentation