Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regulatory Services
Executive Towe rs West Ill
1400 Opus Place, Suite 500
Downers Grove, IL 60515
January 4, 1999
SUBJECT:
NRC INSPECTION REPORTS 50-237/98022(DRS); 50-249/98022(DRS) AND
Dear Mr. Kingsley:
On August 28, 1998, the NRC completed an inspection at your Dresden Generati.ng Station,
Units 2 and 3. The enclosed report summarizes the results of this inspection.
The purpose of the inspection was to review corrective actions for previously identified issues.
The inspector concluded that your staff was effective in implementing corrective actions to
notices of Violation; unresolved items and inspection followup items: In addition, the
engineering staff was knowledgeable, involved in the corrective action process and effective in
the resolution of technical issues. *
Based on the results of this inspection, your activities associated with the control of draining
1and sampling the reactor building fire suppression system during testing appeared to be in
violation of NRC requirements as specified in the enclosed Notice of Violation (Notice). The
circumstances surrounding the violation are described in detail in the subject inspection report.
The violation is of concern because management's interpretation and direction for the sampling
method did not agree with the staff's interpretation, which demonstrated weaknesses in
communication of management expectations and procedure adherence related to Dresden
Administrative Procedure 7-52, "Control of Equipment Draining,* Revision 0.
The NRC has concluded that information regarding the reason for the violation, the corrective
I/./
actions taken and planned to correct the violation and prevent recurrence, are already*
/
/
adequately addressed in the subject inspection report. Therefore, you are not required to
respond to the violation unless the description therein does not accurately reflect your
corrective actions or your position. In that case, or if you choose to provide additional
information, you should follow the instructions specified in the enclosed Notice.
9901140016 990104
ADOCK 05000237
Cl
..
0. Kingsley
-2-
In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
original signed by R. N. Gardner
Ronald N. Gardner, Chief
Engineering Specialist Branch 2
Docket Nos.: 50-237; 50-249
Enclosure:
- ccw/encl:
Inspection Reports 50-237/98022(DRS); 50-249/98022(DRS)
D. Helwig, Senior Vice President
H. Stanley, PWR Vice President
C. Crane, BWR Vice President
R. Krich, Vice President, Regulatory Services
OCD - Licensing
M. Heffley, Site Vice President
P. Swafford, Station Manager
F. Spangenberg, Regulatory
Assurance Manager
R. Hubbard
M. Aguilar, Assistant Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
DOCUMENT NAME: G:DRS\\DRE98022.DRS
with attactvnent/endosure "N" = No
OFFICE
[
Riii
NAME
DATE
121'.}'S/98
12/>.J /98
OFFICIAL RECORD COPY
0. Kingsley
Distribution:
SAR (E-Mail)
RPC (E':'Mail)
Project Mgr., NRR w/encl
J. Caldwell, Riii w/encl
C. Pederson, Riii w/encl *
B. Clayton, Riii w/encl
SRI Dresden w/encl
DRP w/encl *
TSS w/encl
DRS (2) w/encl
Riii PRR w/encl
>:,~~-~u_c 1E~Pt~/~nc1.
- "Docket File w/encl
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)
-3-