UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN.: Regulatory Services Executive Towers West Ill 1400 Opus Place, Suite 500 Downers Grove, IL 60515 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 December 16, 1998
SUBJECT:
STATUS MEETING ON THE PERFORMANCE OF COMMONWEALTH EDISON COMPANY'S NUCLEAR GENERATION GROUP
Dear Mr. Kingsley:
This refers to the meeting conducted at the NRC Region Ill Office in Lisle, Illinois, on November 17, 1998. The purpose of this meeting was to discuss Commonwealth Edison Company (ComEd) Nuclear Generation Group's (NGG's) performance as it relates to actions ComEd has taken in response to the NRC's 10 CFR 50.54(f) letter, dated January 27, 1997, regarding safety performance at Com Ed's nuclear facilities. Attendees at the meeting are listed in Enclosure 1. Enclosure 2 is a copy of ComEd's presentation materials.
The ComEd presentation included the status of the Strategic Reform Initiative (SRI) closure packages, a summary of selected SRI action steps, a discussion of configuration control and material condition improvements, an update on Quad Cities Appendix R issues, and a discussion of initial operator. licensing training program corrective actions.
Based*on the ComEd presentation, the following SRI items are considered to be closed in the NRC ComEd Oversight Action Plan:
NGG-1, Performance Indicators, Action Step 4 NGG-1, Management Response, Action Step 1 NGG-5, Assess Organizational Accountability and Revise Structure, Action Steps 1, 2, and 3 NGG-6, Refine Business Management Process, Action Steps 1, 2, 3, 4, 5, and 6 NGG-8, Engineering Improvements, Action Step 2 The next status meeting will be conducted on January 28, 1999, at 1 :00 p.m.
In accordance with Section 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.
9901070367 ~81216
- PDR ADOCK 05000237 p
- 0. Kingsley If you have any questions regarding this meeting or if our understanding of actions ComEd is taking, as discussed above, differs from yours, please contact me at (630) 829-9657.
Sincerely,
/sf James L. Caldwell James L. Caldwell Acting Regional Administrator Docket Nos.: 50-456; 50-457; 50-454;.
50-455; 50-237; 50-249; 50-373; 50-374; 50-254; 50-265
Enclosures:
- 1.
- 2.
Attendance List Licensee Presentation See Attached Distribution DOCUMENT NAME: G:\\COMED\\COM11178.SUM To receive a co of this document, indicate in the box "C" = Co without attach/encl "E" = Co with attach/encl "N" = No co OFFICE Riii NRR NAME PPelk SRichards II DATE 12/l"\\ /98 121*loJ9a 12/ II /98
- 0. Kingsley cc w/o encls: D. Helwig, Senior Vice President H. Stanley, PWR Vice President C. Crane, BWR Vice President R Krich, Vice President, Regulatory Services D. Greene, Licensing Director DCD - Licensing T. Tulon, Braidwood Site Vice President K. Graesser, Byron Site Vice President M. Heffley, Dresden Site Vice President F. Dacimo, LaSalle Site Vice President J. Dimmette, Jr., Quad Cities Site Vice President K. Schwartz, Braidwood Station Manager W. Levis, Byron Station Manager P. Stafford, Dresden Station Manager
. T. O'Connor, LaSalle Station Manager W. Pearce, Quad Cities Station Manager T. Simpkin, Braidwood Regulatory Assurance Supervisor B. Adams, Byron Regulatory Assurance Supervisor F. Spangenberg, Dresden Regulatory Assurance Manager P. Barnes, LaSalle Regulatory Assurance Supervisor C. Peterson, Quad Cities Regulatory Affairs Manager cc w/encls:
Richard Hubbard, MHB Technical Associates M. Aguilar, Assistant Attorney General State Liaison\\Officer State Liaison Officer, Wisconsin Chairman. Illinois Commerce Commission W. Leech, Manager of Nuclear MidAmerican Energy Company
--+.
- 0. Kingsley Distribution:
W. Travers, EDO w/encls H. Thompson, DEDR w/encls T. Hiltz, OEDO w/encls S. Collins, NRR w/encls F. Miraglia, NRR w/encls B. Boger, NRR w/encls T. Martin, NRR w/encls*
E. Adensam, NRR w/encls PM, NRR w/encls G. Dick, NRR w/o encls L. Gerke, OCA w/encls J. Caldwell, Riii w/o encls C. Pederson, RI 11 w/encls J. Grobe, Riii w/o encls M.. Ring, Riii w/o encls M. Jordan, Riii w/o encls B. Clayton, Riii w/encls R. Lanksbury, Riii w/o en~
/
Docket F~*1e w/encls
\\ _ l{ S PUBLIC I 01 w/encls
._Vt TSS, Riii /o encls DRP, Riii w/o encls Riii PRR w/encls SRI LaSalle, Dresden, Quad Cities, Braidwood,.. Byron w/o encls DRS (2) w/o encls Greens w/o encls osooo1 Ii
. I ATTENDANCE AT THE NOVEMBER 17, 1998 MEETING BETWEEN THE NRG AND COMED COM ED ATTENDEES
- 0. Kingsley, Jr.
D. Helwig S. Perry C. Crane H. Stanley J. Benjamin R. Krich W. Bohlke R. Fairbank NRG ATTENDEES J. Caldwell J. Dyer, E. Adensam S. Richards G. Grant S. Reynolds M. Ring P. Pelke M. Jordan G. Dick D. Hills R. Lanksbury President and Chief Nuclear Officer Senior Vice President Vice President BWR Vice President PWR Vice President Vice President, Nuclear Oversight Vice Pres.ident, Regulatory Services Vice President, Engineering Regulatory. Services Acting Regional Administrator, Region Ill Deputy Regional Administrator, Region IV Acting Director, Division of Reactor Projects, Ill/IV, NRR Director, Project Directorate 111-2, NRR Director, Division of Reactor Projects (DRP), Region Ill Deputy Director, Division of Reactor Safe_ty, Region Ill Chief, Projects Branch 1, DRP, Region Ill Reactor Engineer, Projects Branch 5, DRP, Region Ill Chief, Projects Branch 3, DRP, Region Ill Licensing Project Manager, NRR
. Project Engineer, DRP, Region Ill Chief, Projects Branch 5, DRP, Region Ill