Forwards Insp Repts 50-237/98-26 & 50-249/98-26 on 981007- 1124.No Violations Noted
ML17191B181
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/18/1998
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML17191B182 List:
References
50-237-98-26, 50-249-98-26, NUDOCS 9812300068
Download: ML17191B181 (3)


See also: IR 05000237/1998026

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION 111

Mr. Oliver D. Kingsley

President, NuClear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West Ill

1400 Opus Place, Suite 500

Downers Grove, IL 60515.

801 WARRENVILLE ROAD

LISLE. ILLINOIS 60532-4351

December 18, 1998

SUBJECT:

DRESDEN INSPECTION REPORT 50-237/98026 (DRP); 50-249/98026 (DRP)

Dear Mr. Kingsley:

On October 7 through November 24, 1998, the NRC performed an inspection at your Dresden

Nuclear Power Station. The enclosed report presents the results of this inspection.

During the inspection period, a safety-conscious approach characterized the overall conduct of.

activities at the Dresden station. No cited violations of NRC requirements were identified.

However, several issues demonstrated that challenges to smooth unit operations remain at the

station. These challenges arose from both material condition failures and personnel errors.

For example, the high pressure coolant injection system again was declared inoperable due to

failures associated with the gland seal leakoff condenser. Additionally, unit derates were

required to resolve reactor recirculation system issues (Unit 2) and in response to a failed open

circulating water pump discharge valve (Unit 3).

During the inspection period, high level activitieswere performed well. Examples included the

increase in thermal reactor power due to removing some steam flow limits, the single loop

operation evolution to address reactor recirculating system issues, and the operator response

to a stuck open circulating water discharge valve. While high level activities were performed

well, personnel performance during the conduct of routine, day-to-day activities was not always

as good and presented challenges to the operators and unit operation. Examples included an

inadvertent reactor protection system half-scram conditior:i generated during surveillance

testing, an automatic initiation of the safety-related standby gas treatment system caused by

personnel error, and maintenance errors associated with the repair of the 3C circulating water

pump discharge valve. The failure of the circulating water discharge valve required the

operators to respond immediately to the decrease. in main condenser vacuum; this error was

especially significant since the Unit 3 high pressure coolant injection system was inoperable

during the time when the circulating water valve failed and would have been unavailable had the

operators needed to manually scram the reactor on an impending loss of main condenser

vacuum. Also of concern to the NRC was the fact that these errors were generally identified

through self-revealing events, and not as a result of problem identification activities by the plant

staff.

~BA2aooo60 901210

(J .

ADOCK 05000237

PDR

0. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will by placed in the NRC Public Document Room.

Sincerely,

/s/Hark A. Ring

Mark A. Ring, Ctiief

Reactor Projects Branch 1

Docket Nos.: 50-237; 50-249

License Nos.: DPR-19; DPR-25

Enclosure:

Inspection Report 50-237/98026(DRP);

cc w/encl:

50-249/98026(DRP)

D. Helwig, Senior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Regulatory Services Manager

D. Greene, Licensing Director

DCD - Licensing

M. Heffley, Site Vice President

P. Swafford, Station Manager.

F. Spangenberg, Regulatory

Assurance Manager

R. Hubbard

M. Aguilar, Assistant Attorney General

State Liaison Offieer

.

Chairman, Illinois Commerce Commission

DOCUMENT NAME: G:\\DRES\\DRE98026.DRP

To receive a copy of this document, indicate in the box "C" =Copy w/o attach/encl "E" =

Co

w/attach/encl "N" = No co

NAME

Lerch/ml

DA TE

12// <J /98

12/ 15)(98

OFFICIAL RECORD COPY

.*

0. Kingsley

Distribution:

SAR (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/encl

J. Caldwell, Riii w/encl

C. Pederson, Riii w/encl

B. Clayton, Riii w/encl

SRI Dresden w/encl

DRPw/encl

TSS (P. Pelke) w/encl

DRS (2) w/encl

Rill PRR w/encl

PUBLIC IE-01 w/encl

Docket File w/encl

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

290009