Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West Ill 1400 Opus Place, Suite 500 Downers Grove, IL 60515
Dear Mr. Kingsley:
June 15, 1998 In a telephone conversation on June 4, 1998, between Mr. Doug Lauterbur and Mr. Hironori Peterson, arrangements were made for the administration of licensing examinations at the Dresden Generating Station the week of October 26, 1998. In addition, the NRC will make an examination validation visit to your facility the week of October 12, 1998.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Interim Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 28, 1998. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by September 25, 1998.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number ot.NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Managemerit and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the,first examination date. If the applications are not received at least 30 days before the examination
- date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
- --
- 9866220172 *9eo6fs
- PDR ADOCK 05000237 V
- 0. Kingsley 2
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
- Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
. Thank you for your cooperation in this matter. Mr. l,.auterbur has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. H. Peterson at 630-829-9707, or me at 630-829-9705.
Sincerely, Original Signed by Melvyn Leach Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 See Attached Distribution Melvyn N. Leach, Chief Operator Licensing Branch DOCUMENT NAME: G:DRS\\DRE06&18.DRS wtth attachmenVendosure "N" = No OFFICE Riii NAME Mleach h;vt.,.
DATE 06//l798 OFFICIAL RECORD COPY
- 0. Kingsley
\\.
cc:
M. Wallace, Senior Vice President D. Helwig, Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager I. Johnson, Licensing Director DCD - Licensing M. Heffley, Site Vice President P. Swafford, Station Manager 3
F.. Spangenberg, Regulatory Assurance Manager R. Hubbard N. Schloss, Economist Office of the Attorney General State Liaison Officer Chairman, Illinois Commerce Commission J. S. Almon, Training Department Djstdbutjon:
Docket File PUBLIC IE SRI, Dresden M. A. Ring, DRP M, A. Bies, DRS DRS Riii PRR R. M. Gallo, NRR/HOLB L. W. Rossbach, LPM, NRR