ML17188A102

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-237/98-03 & 50-249/98-03 on 980112- 0220 & Notice of Violation.Violations All Involved Inadequate Procedures or Failure to Follow Procedures & Represented Continuing Trend of Instruction Problems
ML17188A102
Person / Time
Site: Dresden  
Issue date: 03/21/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML17188A103 List:
References
50-237-98-03, 50-237-98-3, 50-249-98-03, 50-249-98-3, NUDOCS 9803270168
Download: ML17188A102 (4)


See also: IR 05000237/1998003

Text

~-*--***-*-*-*-**

--

--*

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

  • '**".
  • Mt. Oliver D. Kingsley

Commonwealth Edison Company

President, Nuclear ~eneration Group

An.: Regulatory Services

Executive Towers West Ill

1400 Opus Place, Suite 500

Downers Grove, IL 60515

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351

  • . March il, . 1998

"

SUBJECT:

NOTICE OF VIOLATION AND INSPECTION REPORT NO. 50-237/98003(DRP);

50-249/98003(DRP)

Dear Mr. Kingsley:

The NRC performed an inspection at the Dresden Nuclear Power Station from January 12

through .February 20, 1998, The purpose of .the inspection was to assess routine performance.

The enclosed report presents the results of that !nspection. * *

During this inspection period, a safety-conscious approach characterized the overall conduct of

activities at the Dresden Station. However, plant material condition and some maintenance

activities continued to challenge the operators. Inadequate written work instructions and

procedures impacted plant operations and maintenance. For example, an automatic reactor trip

occurred during a sur\\teillance test, and equipment was damaged due to installation of incorrect

parts during maintenance of an emergency diesel generator.

Some events caused by the material condition issues, such as the otcurrence of premature

hydrogen recombination in the off-ga.s *system, were repeat items, similar to those documented in

prior NRC inspection reports. The unavailability of the high pressure coolant injection (HPCI)

system has been a continuing prol:>lem at Dresden~ During this inspection period, both the

Unit 2 and 3 HPCI systems were again.rendered inoperable due to equipment.failures.

Based on the results of this inspection, the NRC determined that violations of NRC requirements

occurred. The violations are cited in the enclosed Notice of Violation (Notice), and the

circumstances surrounding the violations are described in detail in the subjec~ inspection report.

T_he violations all involved inadequate procedures or failure to follow procedures and represented

abontinuing trend of procedural and work instruction problems. In your response to the

violations for inadequate work instructions, you are requested to address the overall issue of

. preparing high-quality work instructions.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether. further enforcement action is necessary to ensure compliance with regulator)\\

. requirements.

.

  • .
  • *
  • .
  • *)7onoG

9803270168 980321 .

PDR

ADOCK 05000237

a

PDR

  • ...

,_

. *:-.5

t::.

1/

    • ---,.--,,:;;.__

,_

_..;.._.

      • -=-----..... -. ..,...

..,

0. Kingsley -

..2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of-Practice,. a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

J

-

  • _/,

... **

,,

..

Sincerely,

Gtti11.D~r

'Division of Reactor Projects

Docket Nos.: 50-237; 50-249 .

License Nos.: DPR-19; DPR-25

Enclosures:

1.

Notice of Violation

Inspection Report

cc w/encls:

2.

No, 50-237/98003(DRP);

.50-249/98003(DRP)

M. Wallace, Senior Vice President

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President .

J. Perry, BWR Vice President

D. Farrar, Regulatory Services Manager

I. Johnson, Licensing Director

DCD - Licensing

M. Heffley, Site Vice President

C. Howland, Station Manager Unit 1

P. Stafford, Station Manager Units 2 and 3

F. Spangenberg, Regulatory Assurance

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

_

......._.._....,...._.. *-----

,.,. _

,~~~-*-::..~..:..

- .. -_ -*~-

-- ---:-

0. Kingsley

. *-2-

. In accor.dance with.10 CF.R 2.790 of the NRC's "Rules of Practice,"~ copy of this letter, its

. enclosures,, ~nd your response will be placed in the NRC Public Document Room.

,-

1 * - --* --

- * -*

. \\

.

.-

) :

. ;: . .. ~.:

.!.*

Sincerely,

/sf G. E. Grant

. **1

.

.

    • Geoffrey E. Grant, Director
  • Division of Reactor Projects

I

.I

  • ..

Docket No,s.: 50-237,; 50-249

License Nos.: DPR-19; DPR-25

Enclosures:

1.

Notice of Violation

Inspection Report

2.

. No. 50-237/98003(DRP); !.,'. * .* * , .

50-249/98003(DRP) ..

-*

cc w/encls:

M. Wallace.Senior Vice Presiden*t

D. Helwig;-senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

.

9. Farrar, Regulatory Ser.iices Manager

. I. Johnson, Licensing Director

.* DCD - Licensing

M. Heffley, Site Vice President

C. Howland, Station Manager Unit 1

P. Stafford, Station Manager Units 2 and 3

  • i=. Spangenberg, Regulatory As.surance

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison.Officer

Chairman, Illinois Commerce

~-

Commission

,.

DOCUMENT NAME: G:\\DRES\\DRE98003.DRP

To receive a co

OFFICE

tJ

R 111 fl.. /,.PM

NAME

Rlerch:nmo

MRin

{nt

DATE

03/J.0/98

  • -* *.

0. Kingsley

. Distribution:

Docket File ~/~ncls , . .

PUBLIC IE~01. w/encl~ .. _,.,.,,,,

A. Beach w/encls *

  • * * * * *

Deputy RA w/encls

Rlil Enf. Coord. w/encls

SRI Dresden w/encls

Project Mgr. NRR w/encls

DRP w/encls

~ .

' -3-

TSS w/encls

DRS (2) w/encls

Rill PRR W/encls

RAC1 (E-Mail)

IEO (E-Mail)

.OOCDESK(E-Mail) .

Project Mgr., Unit 1, NRR w/encls

GREENS