Forwards Insp Repts 50-237/97-23 & 50-249/97-23 on 971027-30.No Violations Noted.Insp Consisted of Selective Examination of Procedures & Representative Records,Interview W/Personnel & Observation of Activites in Progress
ML17187B229
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/18/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML17187B230 List:
References
50-237-97-23, 50-249-97-23, NUDOCS 9712300447
Download: ML17187B229 (3)


See also: IR 05000237/1997023

Text

Mr. J. S. Perry

Site Vice President

Dresden Nuclear Power Station

Commonwealth Edison Company

6500 North Dresden Road

Morris, IL 60450

December 18, 1997

SUBJECT:

NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS

50-237 /97023(DRS); 50-249/97023(DRS)

Dear Mr. Perry:

On October 30, 1997, the NRC completed an inspection of your emergency preparedness

program at the Dresden Nuclear Power Station, Units 2 and 3. The enclosed report presents

the results of that inspection.

Areas examined within your emergency preparedness program are identified in the report.

Within those areas, the inspection consisted of a selective examination of procedures and

representative records, interviews with personnel, and observation of activities in progress. The

objective of the inspection effort was to determine whether activities authorized by the license

were conducted safely and in accordance with NRC requirements .

During this inspection our observation of your activities showed the emergency preparedness

program to be effectively implemented. In particular, the emergency response facilities,

equipment, and supplies had been well maintained, management support to the program was

currently strong, and key emergency response personnel demonstrated competent knowledge

of responsibilities and emergency procedures. You effectively addressed and corrected a

number of issues identified during a program audit and self assessment.

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and

enclosure will be placed in the NRC Public Document Room (PDR).

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

  • Sincerely,

Original Signed by John M. Jacobson (for)

John A. Grobe, Director

Division of Reactor Safety

I llllll 111111111111111111111111111111111

I

I

3

I

A

7

Enclosure:

Inspection Reports 50-237/97023(DRS); 50-249/97023(DRS)

See Attached Distribution

DOCUMENT NAME: G:DRS\\DRE97023.DRS (SEE PREVIOUS CONCURRENCE) .

To receive a co

of this document. Indicate In the box *c* =

w/o attach/encl "E" =

w/attach/encl "N" =No

OFFICE

Riii

NAME

RJickling

DATE

12/

/97

9712300447 971218

PDR

ADOCK 05000237

G

PDR

Riii

Riii

Riii

JCreed

MRing

12/

/97

12/

/97

OFFICIAL RECORD COPY

Mr. J. S. Perry

Site Vice President

Dresden Nuclear Power Station

Commonwealth Ediso.n Company

6500 North Dresden Road

Morris, IL 60450

SUBJECT:

NRC EMERGENCY PREPAREDNESS INSPECTION REPORTS

50-237/97023(DRS); 50-249/97023(DRS)

Dear Mr. Perry:

On October 30, 1997, the NRC completed an inspection of your emergency preparedness

program at the Dresden Nuclear Power Station, Units 2 and 3. The enclosed report presents

the results of that inspection.

Areas examined within your emergency preparedness program are identified in the report.

Within those areas, the inspection consisted of a selective examination of procedures and

representative records, interviews with personnel, and observation of activities in progress. The

objective of the inspection effort was to determine whether activities authorized by the license

were conducted safely and in accordance with NRC requirements .

During this inspection our observation of your activities showed the emergency preparedness

program to be effectively implemented. In particular, the emergency response facilities,

equipment, and supplies had been well maintained, management support to the program was

currently strong, and interviewed key emergency response personnel demonstrated competent

knowledge of responsibilities and emergency procedures. You effectively addressed and

corrected a number of issues identified during a program audit and self assessment.

In accordance with 1 O CFR 2. 790 of the NRC's "Rules of Practice," a copy of thi~ letter and

enclosure will be placed in the NRC Public Document Room (PDR).

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Sincerely,

John A. Grobe, Director

Division of Reactor Safety

Enclosure:

Inspection Reports 50-237/97023(DRS); 50-249/97023(DRS)

See Attached Distribution

DOCUMENT NAME: G:DRS\\DRE97023.DRS

w/attach/end "N" = No

µ

Riii

NAME

JG robe

DATE

12/

/97

OFFICIAL RECORD COPY

J. S. Perry

cc w/encl:

Distribution

2

0. Kingsley, Nuclear Generation Group

President & Chief Nuclear Officer

M. Wallace, Senior Vice President,

Corporate Services

E. Kraft, Vice President, BWR Operations

Liaison Officer, NOC-BOD

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

I. Johnson, Licensing Operations*Manager

Document Control Desk - Licensing

T. Nauman, Station Manager, Unit 1

M. Heffley, Station Manager, Units 2 and 3

F. Spangenberg, Regulatory Assurance

Manager

Richard Hubbard

Nathan Schloss, Economist,

Office of the*Attomey General

State Liaison Officer

Chairman, Illinois Commerce Commission

Docket File w/encl

PUBLIC IE-35 w/encl

LPM, NRR w/encl

DRP w/encl

Riii PRR w/encl

SRI, Dresden w/encl

J. L. Caldwell, Riii w/encl

A. B. Beach, Riii w/en.cl

CAA1 w/encl

DRS w/encl

December 18, 1997

Riii Enf. Coordinator w/encl

TSS w/encl

R. A. Capra, NRR w/encl

DOCDESK w/encl