Notice of Violation from Insp on 961021-1206.Violation Noted:Licensee Discovered Original Design Mod Test & Subsequent Surveillance Tests of Control Room Heating, Ventilation & Air Conditioning Sys Failed Requirements
ML17187A984
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/21/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17187A981 List:
References
50-237-96-14-01, 50-237-96-14-1, 50-249-96-14, EA-96-532, NUDOCS 9705290195
Download: ML17187A984 (1)


Text

Commonwealth Edison Company Dresden Station NOTICE OF VIOLATION Docket Nos.

50-237: 50-249

  • License Nos. DPR-19: DPR-25 EA 96-532 During an NRC inspection conducted from October 21 through December 6. 1996. a violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions." NUREG-1600.

the violation is listed below:

10 CFR 50. Appendix B. Criterion XI. "Test tontrol." states that a test program shall be established to assure that all testing required to _

demonstrate that structures. systems. and componerits will perform*

satisfactorily in service is identified and performed in accordance with writte~ test procedures which incorporate th~ requirements and acceptance limits contained in applicable design documents:

'.Updated Final Safety Analysis Report (UFSAR) section 6.4.2.4.

"Interactions with Other Zones and Press.ure Canta i ni ng Equipment.".

states. in.part. that potential adverse interactions between the cpntrol

  • room emergency zone and aqjacent. zones that may allow transfer of toxic or radioactive *gases into the control room ara minimized by maintaining the control room at a positive pressure of 1/8-inch water-gauge *during emergency pressurized modes. with respect to adjacent areas.

Contrary to the above. the. licensee* discovered that the original. des.ign modification test and ~uosequent survei 11 ance tests of the contr*o l, roqm Heating. Ventilation. and Air Conditioning system failed to ensure that the requirements and acceptance limits ~pecified in the UFSAR: an applicable design document~ section 6.4.2.4 were met, Specifically. the licensee discovered that on September 26. 1996: the control room.

  • ventilation system ~as not able to maintain the control *room at 1/8-inch:

water-gauge positive pressure with respect to adjacent areas during emergency pressurized ~ode~ (01013).

This is~ Severity Level III Violation (Supplement I).

The NRC has concluded.that information regarding th~ reason for the violation.

the corrective actions taken and planned to correct the violation and_prevent

  • recurrence and the date when. full compliance was achieved.is already adetjuately addressed on the docket in LER 96-017. as supplemented. and the information you provided at the predecisional enforcement conference which is attached to our letter to you dated March 26. 1997,.

However. you are required to sumbit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or*

your position.. In that case. or if you choose to respond. clearly mark. your response as a "Reply to a Notice of Violation." and send it to the U.S.

Nuclear Regulatory Commission. ATTN:

Document Control Desk. Washington. D.C.

20555 with a copy to the Regional Admipistrator. Region III and a copy to the NRC Resident I~spector at the facility that is the subject of the Notice, within 30 days of the date of the letter transmitting this Notice of Violation

  • (Nati ce).

Dated at Lisle. IL this 21st.day of May, 1997 9705290195 970521 PDR ADOCK 05000237 G