May 23, 1997 M~. lrene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
RETRACTION OF REQUEST FOR AN EXTENSION OF THE 18.5 MONTH OPERATING PERIOD STIPULATED FOR DRESDEN, UNIT 3, DUE TO THE CORE SHROUD CRACKING ISSUE (TAC NO. M96567)
Dear Ms. Johnson:
By Tetter dated September 12, 1996, Commonwealth Edison Company (ComEd) reque~ted an extension of the 18.5 month operating period stipulated for Dresden, Unit 3, due to the core shroud cracking issue.
ComEd had requested that the 18.5 month hot operating tycle be extended to 20.5 months t~
accommodate unplanned events that impacted the operating cycle.
By letter dated February 14, 1997, ComEd retracted the request.
As* a resul't of the combination of the revised refueling-outage-start date and a forced outage, ComEd no longer needs the additional time in the operating cycle prior to installation of the core shroud repair.
Dresden~ Unit J, shut down on March 28, 1997, for the current refueling outage (D3Rl4).
The core shfoud
.repair is *scheduled to take place during refueling outage D3Rl.4.
Accordingly-,
the request for an extension is b~ing treated as withdrawn.
Docket No. 50-249 cc:
see next page Sincerely, ORIGINAL SIGNED BY: *
.John S~ang, Senior.Projett Manager Project Directorate'iII-2 _
Division of Reactor Projects - III/IV
~;Office of Nuclear Reactor Regulation
- ',-- -* ~,,-.,
Dr;; o l 1
~
- J
~
.. '{*
- . ~
. J. Roe, JWR J. Stang W. Kropp, R II I DOCUMENT NAME:
0
~:~!:~:1:~:ate in the box:
'. ' NBC FIE CENTER' COPY osures ~e* = Copy ith e closures "N" =*No copy
- OFFICE e
D: POI 11-2 F
NAME RCAPRA,.,_......,
DATE 05/23 /97
May 23,.. 1997 Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III.
1400 *Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
RETRACTION OF REQUEST FOR AN EXTENSION OF.THE 18.5 MONTH *OPERATING PERIOD STIPULATED FOR DRESDEN, UNIT 3, DUE TO THE.CORE SHROUD CRACKING ISSUE (TAC NO. M96567)
Dear Ms. Johnson:
By lett.er dated September*12, 1996, Convnonwealth Edison Company (ComEd) requested an extension of the 18.5 month operating period stiptilated for Dresden, Unit 3, due to the core shrqud cracking_ issue.
ComEd had requested..
that the 18.5 month hot operating cycle be extended to 20.. 5 months to acco~~odate unpl~nned events that i~pacted the operating cycle.
By letter dated February 14, 1997, ComEd retracted the requ~st. As a result
-of the.-c*ombination of the revised refueling-outage-start date and *a forced.
outage, ComEd _no longer needs the additional time in the operating cycl~ prio~
to installation of *the core shroud repair. Dresden, Unit 3, shut down on *
. March 28, 1997, for the curre~t refueling riutage (D3Rl4).
The core shroud repair is scheduled to t~ke place :during refuel in~ outage -03Rl4.
Accordingly, the. request 'for *an extension i's being treated. as withdr_a_wn~
. Sincerely, Docket.No. 50-249 cc: see next*. page Distribution:
Docket File, T5C3 E. Adens am,.EGA!
.s.>Bailey C.~. Carpenter PUBLIC R. Capra OGC, 015Bl8 DOCUMENT NAME:.* DR96567. L TR ORIGINAL SIGNED BY:
John Stang, Senior Project Manager Project Directorate Ill-2 Divisian of Reactor Pt6je~t~ - lII/IV
- offtce of Nuclea~ ~~a~to~ Regulation *
- PD II I -2 r If
- c. *Moore
.ACRS, T2E26 J~ Roe, JWR J.. Stang
.W. Kropp, Riii
- document. Indicate In the box:
osures *E* = Copy ith e cle>sures *N* = No copy OFFICE
~ *. D:PDIIl-2.
F-
, NAME RCAPRA ~
DATE 05 2.J /97
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001
. May 23, 1997 Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
RETRACTION OF. REQUEST FOR AN EXTENSION OF THE 18.S MONTH OPERATING PERIOD STIPULATED FOR DRESDEN, UNIT 3, DUE TO THE CORE SHROUD.
CRACKING ISSUE (TAC NO. M96567}
Dear Ms. Johnson:
By letter dated September 12, 1996, Commonwealth Edison Company (ComEd) requested an extension* of the 18.5 month operating period stipulated for Dresden, Unit 3, due to the core shroud cracking issue.
ComEd had requested that the 18.5 month hot operating cycle be extended to 20.5 months to acco~modate unplanned events that impacted the operating cycle.
By letter dated February 14, 1997, ComEd retracted the request.
As a result of the combination of the revised refueling-outage-start date and a forced*
outage, ComEd no longer needs the additional time in. the operating cycle prior
.to installation of the core shroud repair. Dresden, Unit 3, shut down on March 28, 1997, for the current refueling outage (D3Rl4).
The core shroud repai~ i~ scheduled to take place d~ring refueling outage D3R14.
Acc~rdingly~
the request for an extension is being treated as withdrawn..
Docket No. 50-249 cc:
see next page Sincerely, n ~Senior Project MOnager P oject Directorate IIl-2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation
I: John-son Commonwealth Edison Company cc:
Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago~ *11*1inois 60603 Site Vice President Dresden Nuclear Power Station 6500 North Dresden Road Morris, I 11 i noi s. 60450-9765
_ Stati~n Manager Dresden Nuclear Power Station
~500 North Dr~sden Road.
Morris, Illinois 60450-9765 U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station
.6500 North Dresden Road Morris, Illinois *60450~9766 Regional Administrator U.. S. NRC, Region III 801 Warrenville Road*
Lisle, Illinois 60532-4351 Illinois.Departm~nt of Nuclear Safety Office of Nuclear facility Safety 1035.0uter Park Drive
'Springfield~ Illi~ois. 62704 Chairman Grundy County Board Administration Building 1320 Union Street
- Morris, Illinbis 60450 Document Control D~sk-(icensing Commonwealth Edison Company 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 Dresden Nuclear Power Station Unit Nos. 2 and 3 Warren Bilanin, EPRI Task Manager 3412 Hillvi~w Ave..
. Palo Alto, CA 94303 Robin Dyle, Technical Chairman BWRVIP Assessment Task Southern Nuclear Operating *company Post Office Box 236 40 Inverness Center. Parkway Birmingham, AL 35201