Discusses Telcon Between R Holbrook & H Peterson Re Arrangements for Administration of Licensing Exams.Exams Scheduled Wks of 970728 & 0804
ML17187A872
Person / Time
Site: Dresden  
Issue date: 03/17/1997
From: Lennartz J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
References
NUDOCS 9703280024
Download: ML17187A872 (3)


Text

/,

I Mr. J. S. Perry Site Vice President

  • Dresden Nuclear Power Station Commonwe_alth Edison Company 6500 North Dresden Road*

Morris, IL 60450

Dear Mr. Perry:

March 17, 1997 In-a telephone conversation between Mr. Robert Holbrook and Mr. Hironori Peterson, arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station.

The written and operating examinations are scheduled for the weeks of July 28 and August 4, 1997. Your staff will be given an opportunity to review the iicensing examinations in accordance with the guidelines in R~vision 7* of NUREG-1021, "Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of July 14, 1997.

To prepare the examinations and meet the above schedule, it wfll be necessary for your staff to furnish the reference materials -identified in Attachment 2 of ES-201 by May 5, 1997. Any delay in receiving approved and indexed reference material or the submittal-of inadequate or incomplete reference material niay result in the examinations* bei_ng rescheduled.

The NRC will prepare and-administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

, The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original-simulator performance data (e.g.,. system pressures, temperatures, -and levels) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302; Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

1i-

\\ -

-0 9703280024 970317 PDR ADOCK 05000237 V

PDR 11111a am a111arn 11m nm 11111 ma ~m 11111111

~

1 I

t

, 5 3

2

J. March 17, 1997 Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30, 1997. The estimated average burden is 7. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments. *

. regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork.

Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this matter. Mr. Holbrook ha's been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements,.plea~e contact Mr. Hironori Peterson at 630-8'29-9707.

Docket No. 50-237 Docket No. 50-249 See Attached Distribution Sincerely,

/s/ J. A. Lennartz Jay A. Lennartz, Acting Chief Operator Licensing Branch DOCUMENT NAME:G:\\DRS\\DRE03117.0L To receiv* a copy of this doc--.nt. *;nc&i~at* in th. boa *c*

  • Copy witltout attach/eftCl *[* -

Copy.;.,ith attach/*ncl

  • N*
  • No co OFFICE RII I NAl"IE.

Jlennartz DATE 03 97 03 fl 97 OFFICIAL RECORD COPY

J. S. Perry cc:

T. J. Maiman, Senior Vice President, Nuclear Operations Division D. A. Sager, Vice President, Generation Support H. W. Keiser, Chief Nuclear Operating Officer T. Nauman, Stati~n Manager, Unit 1 M. Heffley, Station Manager, Units 2 and 3 F. Spangenberg, Regulatory Assurance Supervisor I. Johnson, Acting Nuclear Regulatory Services Manager*

Document Contr.ol Desk - Licensing Richard Hubbard Nathan Schloss, Economist, Office of the Attorney General State Liaison Officer Chairman, Illinois Commerce Commission R. s. Holbrook, Training Manager Distribution:

RII I PRR SRI, Dresden March 17, 1997 Docket File

  • PUBLIC I E-42 OC/LFDCB P. L. Hiland, DRP DRS.

J. F. Stang, Jr., LPM, NRR S. A. Richards, NRR/HOLB