Mr. J. S. Perry Site Vice President Dresden Nuclear Power Station Commonwealth Edison Company 6500 North Dresden Road Morris, IL 60450
Dear Mr. Perry:
December 20, 1996 Jn a telephone conversati.on oo December 20, 1996, between Mr. Hironori Peterson and Mr. Ron Thurow; arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station.
The written a.nd operating examinations. are scheduled for the week of March 24, 1997.
Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the* week of March 10, 1997.
To prepare the examinations and meet the above schedule, it will be necessary for your
- staff to furnish' the reference materials identified in Attachment 2 o,f ES-201 by January 1, 1997. Any delay in receiving approved and indexed reference material or' the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.
The NRC will prepare and administer the written examinations* in accordance with ES-401 and ES~402 of NUREG-102*1. In order to conduct the requested examinations, it will be necessary' for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and administer the operating tests in accordance with ES-301 and
- ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted* above.
Your staff should retain the original simulator performance data (e.g.. system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are. final.
9bi2300018 961220 PDR ADOCK 05000237 V
J. s. Perry December 20, 1996 ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating*tests are being administered.
Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying
.that all training has been completed should be submitted at least 14 days before the first examination date.
- This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30, 1997. The ~stimated average burden is 7. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this colfection of information, including suggestions for reducing this burden, to the.Information and. Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D:c. 20555; and to the Paperwork Reduction Project (3150-0101 ), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Wash.ington, D.C. 20503.
Thank you for your consideration in this matter. Mr. Ro.n Thurow has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements, please contact Mr. Hironori Peterson at (630) 829-9707, or me at (630) 829-9705.
Docket No. 50-237 Docket No. 50-249 See Attached Distribution Sincerely, Original S1gned R. M. Bailey (for)
MeJvyn N. Leach, Chief Operator Licensing Branch DOCUMENT NAME:G:\\DRS\\DRE122t6.0L To receive a copy of this document. indicate in the box *c*
- Copy without attach/encl "E"
- Copy with attach/encl "N"
- No co
/"
OFFICE i:z,,.
RI I I NAME Mleach.
DATE 12/ A.0 /96 12/ lo /96 OFFICIAL RECORD COPY
t..,*
/
J. S. Perry cc:
T. J. Maiman, Senior Vice President Nuclear Operations Division A. Sager, Vice President, Generation Support H. W. Keiser, Chief Nuclear Operating Officer T. Nauman, Station Manager, Unit 1 M. Heffley, Station Manager, Units 2 and 3 F. Spangenberg, Regulatory Assurance Supervisor I. Johnson, Acting Nuclear Regulatory Services Manager Document Contra 1 Des.k - Lie.ens i ng Richard Hubbard Nathan Schloss, Economist, Office of the Attorney General State Liaison Offic0r Chairman, Illinois Commerce Commission R. S. Holbrook, Training Manager Di stri but ion:
Docket File
/
PUBLIC IE-42../.