ML17181A217

From kanterella
Jump to navigation Jump to search
ISFSI - Exelon Emergency Plan Addendum Revision
ML17181A217
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/22/2017
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML17181A213 List:
References
EP-AA-1011, Addendum 3, Rev. 3
Download: ML17181A217 (2)


Text

Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)

June 22, 2017 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRG Docket Nos. 50-317 and 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation Materials License No. SNM-2505 NRG Docket No. 72-8

Subject:

Exelon Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting the Emergency Plan Addendum revision .

identified in the table below for Calvert Cliffs Nuclear Power Plant (CCNPP).

Procedure No. Revision Title Calvert Cliffs Nuclear Power Plant Emergency EP-AA-1011, Addendum 3 3 Action Levels The changes to the Emergency Plan Addendum were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for CCNPP. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1).

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Management.

U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revision June 22, 2017 Page2 A copy of the Emergency Plan Addendum revision and supporting change summary analysis are included in the attachments to this letter.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

ResP.ectfully, j iJ~:Jy ~r----

David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2) EP-AA-1011, Addendum 3, Revision 3, "Calvert Cliffs Nuclear Power Plant Emergency Action Levels "

cc: w/ Attachment 1 only Regional Administrator - NRC Region I Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector - Calvert Cliffs Nuclear Power Station NRC Project Manager, NRR - Calvert Cliffs Nuclear Power Station S.T. Gray, State of Maryland