Requests That Util Furnish Ref Materials in Order to Prepare for Written & Operating Exams Scheduled for 950631
ML17180B156
Person / Time
Site: Dresden, 05000349  Constellation icon.png
Issue date: 04/04/1995
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Joyce T
COMMONWEALTH EDISON CO.
References
NUDOCS 9504110211
Download: ML17180B156 (3)


Text

. \\

Commonwealth Edison Company ATTN:

Mr. T. Joyce Site Vice President Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450

Dear Mr. Joyce:

April 4, 1995 In a telephone conversation between Mr. J. Kluch, Operations Training Supervisor, and Mr. E. Plettner, Operator Licensing Examiner, arrangements were made for the administration of licensing examinations at the Dresden Nuclear Power Station.

The written and operating examinations are scheduled for the week of June 31, 1995.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards," (ES-201, Attachment 4) during July 17, 1995.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by April 24, 1995, to Region III.

We will notify you under a separate cover letter of the contractor to whom you will need to send the materials identified in Attached 2 of ES-201.

Any delay in receiving approved and indexed reference material or the submittal of inadequate or' incomplete reference material may result in the exa.mi nations being rescheduled.

The NRC will prep~re and administer the written exami~ations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

95041!~~~ 6~&6&4237 PDR f'UI~

PDR v

T. Joyce 2

April 4, 1995 Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material.* Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C.

20503.

Thank you for your cooperation in this matter.

Mr. Kluch has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelin~s, please contact E. Plettner at (708) 829-9730.

\\

Docket No. 50-237 Docket No. 50-249 Distribution:

See Attached List DOCUMENT NAME:

G:Dresden.OL Sincerely, original signed by M. A. Ring Mark A. Ring, Chief Operations Branch To receive a copy of this document, indicate in the box "C' = Copy w/o attach/encl "E" = Copy w/attach/encl "N" = No copy OFFICE DRS:Rlllfqt' I c.

DRS: RI I I t) I )/ DRS:RIII &.hnlAJ I

NAME Pl ettner /l c TBurdick MRinq II DATE 4/ 1 /95 4/'-'f /95 4/'-f/95 OFFICIAL RECORD COPY

Distribution:

Letter to T. Joyce, Dated:

cc:

J. C. Brons, Vice President Nuclear Support J. S. Perry, Vice President BWR Operations J. Nauman, Station Manager Unit I E. D. Eenigenburg, Station Manager, Unit 2

  • R. Bax, Station Manager Unit 3 P. Holland, Regulatory Assurance Supervisor D. Farrar, Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss, Economist Office of the Attorney General State Liaison Officer Chairman, Illinois Commerce Commission R. C. Weidner, Plant Training Manager Distribution:

Docket File PUBLIC IE-42 OC/LFDCB Riii PRR SRls, Dresden, Lasalle, Quad Cities April 4, 1995 P. L. Hiland, DRP DRS J. F. Stang, Jr;, LPM, NRR IPAS S. A. Richards, OLB