ML17180A624

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-237/94-04 & 50-249/94-04 on 940131-0208.No Violations Noted
ML17180A624
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/08/1994
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Lyster M
COMMONWEALTH EDISON CO.
Shared Package
ML17180A625 List:
References
NUDOCS 9403160058
Download: ML17180A624 (2)


See also: IR 05000237/1994004

Text

Docket No. 50-237 /q4-'> tf

Docket No. 50-249

Commonwealth Edison Company

ATTN:

M. D. Lyster,

Site Vice President

Dresden Station

6500 North*Dresden Road

Morris, IL 60450

Dear Mr. Lyster:

March 8, 1994

The enclosed report refers to the inspection conducted by M. Bielby and

E. Plettner from January 31 through February 8, 1994.

The inspection

evaluated Operation's activities at the Dresden Nuclear Power Station

authorized by NRC Operating License No.'s DPR-19 and DPR-25.

On February 1,

1994, a retake of job performance measures was administered to one of your

operators who was evaluated as unsatisfactory on that portion of the

requalification examination administered on August 8, 1993.

The operator

satisfactorily completed the job performance measures examination.

At the

conclusion of the inspection preliminary findings were discussed with those

members of your staff identified in the enclosed report.

The purpose of the inspection was to assess the licensed operator

requalification program.

The inspection consisted of reviews of training

administrative procedures, representative records, requalification training

materials, and observation of licensed operators during requalification

examination administration.

Interviews were also conducted with members of

the operations and training staffs. Followup inspection was also performed

with regard to your response to Notice of Violation (50-237/93024-0l(DRP)) for

failure to ensure licensed operator medicals were obtained every two years.

Overall, the inspectors concluded that the licensed operator requalification

training program was being implemented in accordance with 10 CFR Part 55

requirements and that operations and training management involvement with the

process was considered a strength. However, the lack of an objective

individual evaluation during dynamic scenario evaluations does not appear to

be in accordance with 10 CFR Part 55 requirements.

Paragraph 59(a)(2) of Part

55 states that operators must pass an annual operating test. The simulator

operating test conducted did not have standard or objective grading criteria

against which each operator was evaluated. Failure to conduct an annual

dynamic simulator operating test evaluation of the individual operators

against an established standard is a concern.

Subsequent to the inspection, NRC Information Notice 94-14 was issued. It

clarified the 10 CFR 55.21 requirement for obtaining licensed operator

medicals every two years.

Based on your most recent response to the Notice Of

Violation, dated December 15, 1993, you do not adequately address corrective

action for preventing licensed operators from exceeding the two year

requirement.

9403160058 940308

PDR

ADOCK 05000237

G

PDR

Commonwealth Edison Company

2

March 8, 1994

You are requested to respond to these two concerns within 30 days of the date

of this letter. Your response should include how each of your operators is

objectively evaluated against a set of standard criteria, and what those

criteria are.

Your response should also include the actions taken by your

. requalification program to ensure licensed operators do not exceed the two

year requirement to obtain a medical examination.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed report will be placed in the NRC Public Document

Room.

The NRC *will gladly discuss any questions you may have concerning this

inspection.

Enclosure: Inspection Report

No. 50-237/94004(DRS)

cc w/enclosure:

L.O. DelGeorge, Vice President,

Nuclear Oversight and Regulatory

Services

Gary F. Spedl, Station Manager

J. Shields, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

OC/LFDCB

Resident Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbard

J. W. Mccaffrey, Chief, Public

Utilities Division

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce

Commission

R. C. Weidner, Training Dept.

R. Gallo, OLB, NRR

R. V. Crlenjak, DRS

bee w/enclosure:

PUBLIC

IE-42

R~Qt?

B'f~~Vft~

03/~ /94

Riii on

Jf//d~y

03/ ~ /94

Sincerely,

original signed by

Mark A. Ring, Chief

Operations Branch

RWl+

Hiland

03/7 /94

Riii

1/ff(

Ring

03/~94