ML17180A618
| ML17180A618 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle |
| Issue date: | 02/28/1994 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML17180A617 | List: |
| References | |
| NUDOCS 9403090013 | |
| Download: ML17180A618 (2) | |
Text
. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 C~D LB-1994 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:
Name of Facility,:
Docket Numbers:
Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
Commonwealth Edison Company All Commonwealth Edison Nuclear Plants 50-456, 50-457; 50-454, 50-455;.5o-m.J 50-249 50-373, 50-374; 50-254, 50-265; 50-295, 50-304 Thursday, March 17, 1994 2:00 p.m. (CST)
U. S. Nuclear Regulatory Commission Region III Office 801 Warrenville Road Lisle, IL 60532 A licensee presentation on Thermo-lag replacement and repair at CECo nuclear power plants, G. Grant, Director, Division of Reactor Safety, RIII G. Wright, Chief, Engineering Branch, Division of Reactor Safety, Rill B. Clayton, Chief, Branch 1, Division of Reactor Projects, RIII Others as Designated Licensee Attendees:
E. Zeduds, Engineering Superintendent D. Taylor, Mechanical and Structural Superintendent J. Javidan, Thermo-Lag Team Leader J. Behn, Fire Protection Engineer P. Dietz, Mechanical and Structural Leader Others as Designated NOTE:
Attendance by NRC personnel at the Region III 1 icensee meeting should be made known by Thursday, March 10, 1994, via telephone call to D. Schrum! Region III (708) 829-9741.
See Attached Distribution 9403090013 940228 PDR ADOCK 05000237 P
PDR Approved By:
Brent Clayton, Chief Reactor Projects Branch 1 I
Notice of Significant Licensee Meeting 2
Distribution:
- J. L. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research, EDO W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR C. E. Rossi, Director, Division of Reactor Ihspection and Licensee Performance, NRR L. A. Reyes, Ac~ing Associate Director for Projects, NRR J. W. Roe, Director, Division of Reactor Projects III/IV/V, NRR J. A. Zwolinski, Assistant Director for Region III Reactors, NRR Chief, RPEB, NRR Region III Coordinator, OEDO Director, Project Directorate, NRR Project Manager, Project Directorate, NRR W. L. Axelson, Director, Division of Radiation Safety and Safeguards, RIII G. E. Grant, Director, Division of Reactor Safety, RIII T. 0. Martin, Deputy Director, Division of Reactor Projects, RIII M. A. Ring, Chief, Operations Branch, DRS) RIII G. C. Wright, Chief, Engineering Branch, DRS, RIII C. D. Pederson, Chief, Reactor Support Programs Branch, DRSS, RIII R. A. Hasse, Chief, Technical Support Staff, DRP, RIII R. M. Lickus, Regional State Liaison Officer~ RIII