Forwards Mgt Meeting Insp Repts 50-237/93-28 & 50-249/93-28 on 930924 & Notice of Violation.Violation Being Cited Because of Longstanding Problem W/Controlling Placement of Matl & Equipment on Contaminated Area Boundaries
ML17179B138
Person / Time
Site: Dresden  
Issue date: 10/07/1993
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML17179B139 List:
References
NUDOCS 9310200063
Download: ML17179B138 (2)


See also: IR 05000237/1993028

Text

Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. L. 0. DelGeorge

OCT

7 1993

Vice President, Nuclear Oversight

and Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300

Downers Grove, IL

60515

Dear Mr. DelGeorge:

,

SUBJECT:

MANAGEMENT MEETING AND RADIATION PROTECTION INSPECTION AT DRESDEN

This refers to the Management Meeting between me and other members of the NRC

staff and Mr. M. Lyster and other members of his staff on September 24, 1993,

at the Dresden Nuclear Power Station to discuss concerns identified in

Inspection Reports No. 50-237/93022(DRSS); 50-249/93022(DRSS) regarding outage

emergent work exposure control and outage contamination control.

Findings

from a plant inspection prior to the Meeting are also discussed in the

enclosed report.

Discussion by your staff at the Meeting indicated adequate corrective actions

had been taken for the previously identified concerns.

Additional effort,

however, appeared necessary to reduce non-outage dose received by workers

under general radiation work permits.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

The violation is being cited because of the longstanding

problem with controlling the placement of material and equipment on

contaminated area boundaries and controlling contaminated equipment.

This

problem and the problem of inadequate control of equipment discussed in

Inspection Reports No. 50-237/93020(DRP); 50-249/93020(DRP) represent a need

for workers to understand and implement management expectations and for

management to spend time in the plant to ensure that the expectations are

being met.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

. Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

Commonwealth Edison Company

  • 2 OCT

7 1993

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosures:

l, Notice of Violation

2. *Inspection Reports

No. 50-237/93028(DRSS);

No. 50-249/93028(DRSS)

cc w/enclosures:

M. D, Lyster, Site Vice President

Gary F. Spedl, Station Manager

J. Shields, Regulatory Assurance

Supervisor

D, Farrar, Nuclear Regulatory

Services Manager

OC/LFDCB

.

Resident Inspectors LaSalle,

Dresden, Quad Cities

Richard Hubbard

J. W, Mccaffrey, Chief, Public

Utilities Division

Robert Newmann, Office of Public.

Counsel

Licensing Project Manager, NRR

State Liaison Officer

Chairman, Illinois Commerce

Commission

H. J. Miller, RIII

T. 0. Martin, RIII

J, E, Dyer, NRR

M. L, Jordan, RIII

C. D. Pederson, Riii

S. Stasek, SRI, Davis-Besse

bee:

PUBLIIC

RJJitJ 0 ~ ~~1.

~g6Jf(;~~,/

101(p1.93

VO -

Sincerely,

W. L.~, D *rector

Division of Radiation Safety and

Safeguards

RII I

~~

10/r,/p

RI~~ I fJ1

Ax~