Forwards Rev 64 to Topical Rept CE-1-A, Comm Ed QA Manual
ML17179B036
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 08/20/1993
From: Bauer J
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17179B037 List:
References
NUDOCS 9308230113
Download: ML17179B036 (2)


Text

Commonwea)t.'=\\ Edison 1400 Opus Pia(

Downers Grove, 1llinois 60515

(

August 20, 1993 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

  • Document Control Desk

Subject:

Commonwealth Edison Company Quality Assurance Topical Report CE-1-A, Revision 64

  • Byron Units 1 and 2,
  • NRC Docket Numbers 50-454 and 50-455 Braidwood Units 1 and 2, NRC Docket Numbers 50-456 and 50-457 Zion Units 1 and 2, NRC Docket Numbers 50-295 and 50-304 Dresden Units 1, 2 and 3, NRC Docket Numbers 50-10, 50-237 and 50-249 Quad Cities Units 1 and 2,
  • NRC Docket Numbers 50-254 and 50~265 LaSalle Units 1 and 2, NRC Docket Numbers 50-373 and 50-37 4

Dear Dr.* Mu.rley:

Attached, please find one copy of Revision 64. of the Commonwealth Edison (CECo)

Topical Report CE-1-A dated August 17, 1993. This report reflects the following organizational changes:

1.

Changed title of Senio*r Vice President (Energy Production) CNO to Senior Vice President (Energy Facilities).*

2 Changed title of Vice President and Chief Nuclear Operating Officer to ViCe President and Chief Nuclear Officer.

3.
  • Changed title of ViCe President, Nuclear Oversight and Regulatory Services to Vice President of ~uclear Operations Support.
4.

Changed title of Manager of Fuel to Vice President, Fuels.

5.

Changed title of Engineering and Construction Manager, to Nuclear

  • Engineering and Technology Services Manager.

ADOCK 05000010 P903Ros230113 93os20 v.I::*.*

P PDR

(

\\

- (

Dr. T.E; Murley August 20, 1993

6.

Changed Department nanie from Engineering and Construction to Nuclear Engineering and Technology Services

7.

Transferred the responsibility of the Nuclear Business Unit from Senior Vice President (Energy Facilities) to Vice President and Chief

  • Nuclear Officer.
8.

The Vice President of Nuclear Operations Support has assumed the responsibility for the following Departments: Nuclear Support, and Performance Monitoring and Improvement.

Please direct *any comments or questions to this office.

JAB/gp Sincerely,

. o~r~.

~oseph A. ~~r V

Nuclear Licensing Administrator

Attachment:

CECo Topical Report CE:-1-A, Revision 64 cc: J.B. Martin, Regional Administrator-RIII, (2 copies)