ML17179A662
| ML17179A662 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/24/1992 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17179A663 | List: |
| References | |
| EA-92-253, NUDOCS 9301050089 | |
| Download: ML17179A662 (3) | |
See also: IR 05000237/1992035
Text
Docket No.
50-237 jt .. 41£, *
License No. DPR-19 * 'I
.
Commonwealth Edison Coropany
ATTN:
Mr. L. 0. DelGeorge.
Vice President, Nuclear
Oversight and Regulatory
Services
- Executive Towers West Ill
1400 Opus Place Suite. 300
Downers Grove,
IL 60515
- Dear Mr. Del George: *
DEC 2 41992.
..
This refers to the inspection conducted by V. P. Lougheed of this office on
O~tober 19 through December 15, 1992.
Th~ tnspection included a review of
- activities authorized fc;>r your Dresden Nuclear Station, Unit 2 ... At the.*
concl~sioti of the inspection, the findings were d\\stussed with those members
- of your staff~ identified in the e*nclosed report.
-
A~eas &xamined during the i~~pection *re identified in the report. * This
inspection specifically focused on the events surrounditig your identification .
that Technical Sp~cification Figure 3.6.1 w~s inaccur~te~ Within these areas,
the inspection consisted of selective examination of representative records
and interviews with personnel.
Based on the results of this inspection~ one apparent violation was identifi~d *
- and is being cons ictered. for escalated enforcement action in accordance with
.
the "General Statement of Pol fey and Procedure for NRC Enforcement Actions".***
- (Enforcement Policy), 10.CFR Part 2, Appendix C.
The apparent violation
involves the inaccurate information submitted to the Nuclear Regulatory
Commission in support of an amendment request for Figure 3.6.1 of the Uni_t 2
Technical Specifications. This inaccurate information led to the amendment
being_ granted. Once you d_i scovered the inaccurate information and informed
the NRC of it, a new amendment request was sµbmitted because the inaccurate*
inforinatiOn had a significant impact on the validity of the amendme_nt.
Ad:ordingly, no Notice of Violation is presently beirig jssued for this
inspection finding .. Please be ~dvised that the number and characterization of
appa~ent-violations*described iri the enclosed inspection report may change as*
a result of further NRC review.
You will be advised by separate
correspondence of the results of ~ur deliberations-on th)s matter.
No -
re~ponse regarding th~ apparent violation is required at this time ..
/
.
.
9a01050oe9 921224 .
,..,--
ADOCK 05000237
- o
.
- "
I..
Commonwealth Edison
-2- ..
DEC 2 4- 1992
In accordance w_ith 10 CFR.2.790 of the Convnission's regulations, a copy of
this letter and the.enclosed inspection report will be placed i~ the NRC
Public Document Room. *
We will gladly discus~ any questions you have concerning thfs inspection:
Enclosure:
Inspection Report
No. 50-237/92035{DRP)
M. Lyster, Site Vice President
J. Shields, Regulatory Assurance
- supervisor
D. Farrar, Nuclear Regulatory
Services Manager
DCD/OBC {RIDS). *
- . OC/LFDCB
Resident. Inspectors, Dresden,
LaSa.11 e, Quad Cities, Cl in ton
R. Hubbard
J .. McCaffrey, Chief, Public
Sincerely,
Original eigr~::a. by E. G. Gree1::1::.n .
Edward G .. Greenman, Di rector,
. Division _of React~r Projects
Couhsel, State of Illinois Center
- 'B. Siegel; Licensing Project Manager~ NRR .
State liaison Officer *
..
C. Paperiello, Rill
B. Berson, RAO
J. Lieberman, OE *
J; Goldman, OGC
J. Partlow, NRR
T. Mart in, RI II
- J. Oyer, NRR.
C; Pederson, Rill
M. Jordan, Rill
S. Stasek, SRI, Davis Bess~
R.
~a 11 , . NRR .
Rill
Riii
Riii
- Lougheed
.
.
Hiland
Clayton
See Previous
. Rill
. RI I I
DeFayette * * Forney
Concurrences
Commonwealth Edison
-2-
oEC 2 4. i99Z
-
In accordance wit.h 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be-pla~ed* in the NRC
- -Public Document Room.
We will gladly discuss any questions you have concerntng this inspection. -
- Sincerely,
Enclosure:
Inspection Report
No. 50-237/92035(DRP)
M~ Wallace~ Chief Nuclear
Operating Officer
M.,Lyster, Site Vice Presi9ent
T. Kovach, Nuclear Licensing
Manager
.
- .
C. Schroeder, Stat~on Manager
J. Shields, Regulatory Assurance
Supervisor
. . .
D. Farrar, Nuclear Regulatory
Services Manager
DCD/DBC (RIDS)
OC/LFDCB
Resid~nt Inspectors, Dresden,
- LaSalle, Quad Cities, Clinton
R. Hubbard
.
J. Mccaffrey, Chief, Public
.. Coun*el, State of Illinois Center
B. Siegel, Licensin*g Project Manager,
State Liaison Officer
C. Paperiello, Riii
B. Berson, RAO
J. Lieberman, OE *
. J. Goldman, OGC
J. Partlow, NRR
T. Martin, RII I
J. Dyer, NRR
C. Pederson, Riii
M. Jordan, Riii
S.>Stasek, SRI, Davis Besse
- E. Leeds, NRR
Rill t<"' -
-yfl\\~~~1'
Lou9rieed
RIJol
-~~~-
Hiland
Clayton
1yi.s/n ..
Edward G ... Greenman, Di rector,
Division of Reactor Projects
_:: .