Forwards Insp Repts 50-237/92-10 & 50-249/92-10 on 920411- 0528.Noncited Violation Noted
ML17177A475
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/08/1992
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17177A476 List:
References
NUDOCS 9206170102
Download: ML17177A475 (2)


See also: IR 05000237/1992010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

Docket No.

50-237

Docket No.

50-249

Commonwealth Edison Company

ATIN:

Mr. -Cordel 1 Reed -

Senior Vice President

Opus West-III

1400 Opus Place

Downers Grove,

IL 60515

Dear Mr. Reed:

REGION Ill

799 AOOSEVEL T ROAD

GLEN ELLYN, tLLINOIS 60137

JUN

8 1992

. **1

_*.

This refers to the inspection conducted by V. Rogers~ M. Peck, R. Landsman,

M. Miller, K. Shembarger, A. Markley and D. Liao of this office, and by

R. Zuffa of the Illinois Department of Nuclear S.afety, on April 11 through

May 28, 1992. The inspection included a review of activities authorized for.

your Dresden Nuclear Station, Units 2 and 3, facility. At the conclusion of

the inspection, the findings were discussed with those members of your* staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. w;thin -

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

-

During this inspection, certain of your activities appeared to be tn v;olation .

of NRC requirements. However, as described in the enclosed inspection report,

the violation was categorized at Severity Level V and is not being cited

because the cr;teria specified in Section VIII.B.l of the *General Statement_

of Policy and Procedures for NRC Enforcement Actions,* (Enforcement Policy,

10 CFR Part 2, Appendix- C (1992), were satisfi~d.

- -

In accordance with 10 CFR 2.790 of the Co11111ission's regulations, a copy of

this letter and enclosed inspection report will be placed in the NRC Public

Document Room.

-

~5~6170102 920608

-

G

ADOCK 05000237

-

PDR

-.

Co11111onwealth Edison Company

"

2

JUN -8 1992

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/ --...

-_ -

,(iCIJ~- --

R. C. Knop, thier:f'

Reactor Projects Section 18 _

Enclosures:

1. _Inspection Reports

No.

50-237/92010(DRP);

No.

50-249/92010(DR~)

cc w/enclosures:

D. Galle, Vice President, BWR

Operations

T. Kovach, Nuclear Licensing

Manager

C. Schroeder, StationManager

R. Radtke, Regulatory Assurance

Supervisor

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspectors, Dresden, .

-. LaSalle, Quad Cities

R. Hubbard

J. Mccaffrey, Chief, Public

Utilities Division

R. Newmann, Office of Public

Counsel, State of Illinois Center

Licensing Project Manager, NRR

C. J. Paperiello, Riii