OPERATING DATA REPORT DOC KET NO......;0...;.5...;.0-_0_l_O ___ _
DATE November 1, 1980 COMPLETED BYS. Cieszkiewicz TELEPHONE (815) 942-2920
. OPERATING STATUS NOTES
- 1.
Unit Name:
Dresden I
- 2.
Reporting Period: October, 1980
- 3.
Licensed Thermal -P-ow_e __
r__,,.(M~W-t-)..---:--70_0 ____________________ _
- 4.
Nameplate Rating (Gross MWe) :_.2.. 0.... 2....
- 5.
Design Electrical Rating (Net M\\~e):
200
- 6.
Maximum Dependable Capacity (Gros;s
-M-\\~--e...
)_:_2_0_5 ________ __
- 7.
Maximum Dependable Capacity (Net MWe):
197
- 8.
If Changes Occur in Capacity Ratings....,.(_l.... te
.... m_s_*_3 __ T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to \\~hi ch Restricted, If Any (Net MWe):
NA
- 10.
Reasons For Restrictions, If Any; NA
__......... ________________________________________________ ~
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours This Month Yr-to-Date CuruuJ.at i'le.
-~~7 Gross Thermal Energy Generated. (MWH)
-< ~
~7:~~- '\\NQ)\\*
Gross E 1 ect r i ca 1 Energy Generate,d (M\\~H)~
-.J.
. \\
Net E 1 ect r i ca 1 Energy Generated '(MWH)
<-, 1) ~x \\ G. -r -,~- _// _. -----
Unit Servlce Factor
~
\\
~~-
Unit Avai labi 1 i ty Factor o~
~ "-.'
~v O~---_. ___ P..--_..,. -
Unit Capacity Factor (Using MDCANet)
Unit Capacity Factor (Using DER:Net)
Un i t Forced Outage Rate
~;:;,,.-----------=--
Shut downs Scheduled Over Next 6 :Months (Type, Date, and Duration of Each):
If Shut Down At End Of Report Period, Estimated Date of Startup: Extended Modification Outage - Shutdown Until June, 1986.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
OPERATING DATA REPORT OPERATING STATUS Unit Name:
Dresden II Reporting Period: October, 1980 Licensed Thermal -P-ow __
e_r_*~(M_W_t_)....-:_2_5_2_7 __________________ __
Nameplate Rating (Gross M\\.Je): 828 Design Electrical Rat*ing (Net M\\.J~) :__..z_9.,..~--------
Maximum Dependable Capacity (Gro~s MWef:.......:.8.... 1=2 _____ _
Maximum Dependable Capacity (Net"MWe): 772 DOC KET NO. _,0....,5""'0,_-.... 2...
37 ____ _
DATE November 1, 1980 COMPLETED BYS. Cieszkiewi~z TELEPHONE (815) 942-2920 NOTES If Changes Occur in Capacity Ratings ~(-1-te_m_s_3_T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to \\.Jhich Restricted, If Any (Net MWe): NA
- 10.
Reasons For Restrictions, If Any:
NA
--..:.='------------------------------------------------
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generat~d (MWH)
Net Electrical Energy Generated' (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC. Net)
Unit Capacity Factor (Using DER. Net)
This Month ZMt:
2ZZ. lZ 652.22 9231773
~Z§,638
~,28,885 88 aa l5 M:t:
Yr-to-Date Z.Jl9 Z.Q~2,02 61895.7 1410651886 4.386.328 4,1391232.4 24 2~
ZJ Cumulat i.~e.
91 775 71 I Z85,45 68,158.23 135, 707, 718 43.392,947 41,027,343.617 74 Z4 58 56 13 Unit Forced Outage Rate 3.0 Shutdowns Scheduled Over Next 6. Months (Type, Date, and Duration of Each):
Refueling 1 December 31, 19801 17 Weeks If Shut Down At End Of Report P:eriod, Estimated Date of Startup: NA ---------
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
].
- 8.
OPERATl.NG DATA REPORT OPERATING STATUS Unit Name:
Dresden III Reporting Period:
October, 1980 Licensed Thermal
-P~o-w_e_r.......,.(M~W-.......t~)~:............ 2-5-2-7-------------------
Nameplate Rating (Gross MWe):
828
__...;;..;;~----------------~
Design Electrical Rating (Net MWe:) :_...1_9.,..!z._* -----------
Maximum Dependable Capacity (Gros~ MWef:812 DOCKET NO. Q50-249
~---------
DATE November 1, 1980 COMPLETED BYS. Cieszkiewicz TELEPHONE (815) 942-2920 NOTES Maxi mum Dependable Capacity (Net 'MWe):
773 If Changes Occur in Capacity Rat:ings...,.(.... 1-te"""m-s __ 3 __
T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:.
NA
- 9.
Power Level to \\.Jhich Restricted, ;If Any (Net MWe): NA
-=----------------------------------
- 10.
Reasons For Restrictions, If Any: NA
~=------------------------------------------------
This Month Yr-to-Date Cumulati.'le.
l I.
Hours in Reporting Period 744 7 319 81,360
- 12.
Number bf Hours Reactor Was Crit~cal 735.28 5.081.73 60,847.05
- 13.
Reactor Reserve Shutdown Hours o
O O
- 14.
Hours Generator On-Line 729~22 4,984.52 58,309.05
- 15.
Unit Reserve Shutdown Hours o
O O
- 16.
Gross Thermal Energy Generated (MWH) 1,720,128 11.160.381 ll3.432,048
- 17.
Gross Electrical Energy Generated (MWH) 559,450 3,571,895 37,001,569.25
- 18.
Net Electrical Energy Generated.'(MWH) 533.139 3.381.039.6 35.074.330.56
- 19.
Unit Service Factor 98 68 72
- 20.
Unit Availability Factor 98 68 72
- 21.
Unit Capacity Factor (Using MDC Net) 93 60 56
- 22.
Unit Capacity Factor (Using DER Net) 90 58 54
- 23.
Unit Forced Outage Rate 2 O
- 3. O 16
- 24.
Shutdowns Scheduled Over Next 6'.Months (Type, Date, and Duration of Each):
TM! Modifications, December :8, 1980, 4 or 5 Days Tentative.
- 25.
If Shut Down At End Of Report P.~riod, Estimated Date of Startup:_N_A _________ _
AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER, 1980 DAY 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 AVERAGE DAILY POWER (MWe-Net) 0 0
0 0
0 0
0 0
0 0
0 0
0 LEVEL DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOC KET NO......:0:<.::5....,0-..-...;.0.:o.l O;::....... __ _
Ull IT Dresden I DATE November 1., 1980 COMPLETED BYS. Cieszkiewicz TELEPHONE (815) 942~2920 AVERAGE DA I LY PO\\~ER LEVEL (M\\~e-Net) 0 0
0 0
0 0
0 0
0 0
0 0
AVERAGE DAILY UNIT POWER LEVEL MONTH*
OCTOBER, 1980 DOCKET NO.
050-237 Ull.1 T Dresden II DATE November 1, 1980 COMPLETED BY S. Cieszkiewicz TELEPHONE (815) 942-2920 DAY AVERAGE DAILY POWER LEVEL (M\\.Je-Net) 3 399 4
388 16
AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER, 1980.
DAY AVERAGE DAI LY POWER LEVEL DAY (MWe-Net) 762 17 2
18 3
33
" 19 4
601 20 5
724 21 6
718 22 7
777 23.
8 779 24 9
767 25 1.0 779 26 11 492 27 12 620 28 13 726 29 14 776 30 15 774 31 16.
778 DOCKET NO. 050-249.
Ull IT Dresden III DATE November 1, 1980 COMPLETED BYS. Cieszkiewicz TELEPHONE (815) 942-2920 AVERAGE DAILY POWER LEVEL (M\\.Je-Net) 770 745 777 775 775 782 543 302 614 720 774 783 784 780
No.
Date
- 8.
. 781031
\\..
/:~::;~)*
- '~..
.. i'
_:.*1.
1*
I
- (
Fl Forced St
- Scheduled
. I j:.
~
.c*~
QI a.
t-s 2
Ulll.l':l I 1111. 050-010
~~~~~~~~
UNIT SllUTDO\\mS /\\ND POWER REDUCTIOllS" UUIT tl/\\llE Dresden I DATE November 1, 1980 REPORT MONTH OCTOBER,* 1980 COMPLETED OV S. Cieszkiewicz TELEPHOtlE (815) 942-2920 i:........
0 Iii L
.., :J IO 0 L
- C Q
744 N c 0
VI 111 QI ICC c
"" L 0
0 OH-*
c u
-0 *-. IQ 0....
Q)
..C u ICC
.... :J QI..c: e x: V) 6 0
- 1.
\\
Licensee Event Report I Reason a A-Equipment Falluro (Expinln)'
B-Halntenonce of Test C-Refuellng 1
l>-Rcuul~tory Rcsttl~llon
~QI
.... -0 Ill 0
>-U VJ.
~-Operator training 6 llc~ns$ Examine l
F*Adml n Is tr at Ive
{)
~.
c:
OJI\\
. c:
Q) 0 -0
- a. 0 eu 0
u Cause & Corrective Action to Prevent Recurrence Major work schec;luled to be performed* this outage; i
.. ~.
- 3)
- M~jor '.1nservice Inspection
- 4)
Chemical Cleaning 5 >.
Refuel G-Operatlonal F.rror H-Other (Explaln) 3 Hcthod:
- 1.,
I i
~-other (Explain)
Exhibit G*lnstrudlons. for Preparation of Data E~try Sheet9 f~~ llcens~o
~
Event Report (_
- _)Flle(N.UREG*~
0161>
C.. 1
- i
No.
bate e:
801005 8010,09 i". i
. :, :~.'.. '.
Ft F'otced St* ~theduleJ
- "l
.=.
..'. i I
di
- 0.
~
F F
U I 11. l:l I 1111.
Q,,..5....,0._-_..2._..3'""'7 _____ _
UNIT SllUTOO\\.IHS /\\NO PO\\~ER REOUtTIOllS**
Ulll T tll\\11[ Dresden II 01\\TE November 1 1 1980 COftPl EH 0 IJY s, Cieszkiewicz HlEPllOtlE (815) 942-2920 nEPORT HONTll OCTOBER~ 1980 M
L 0
t:.......
N 0
01 ~
0 Ill c
t: u Llcehsee L,
0
"'O *-
~
&J
- J In 0..,
Event 0
IQ
.r::
&J 0::
'- :c Cl) u
- J Report
- J._.
a::
cu.c
~
0
- I: "'
0 8.27 H
. NA 8~.52 A
\\
\\
t h
f\\eosoni A-Equipment ralluto (Exptnin) I b-Hrilntend"ce of Test C-Retu~lfng I
b-ncuulotorv Rcstrlcllon I
G.:t.
GJ GJ Ill 0
>-U t-Opcrator trdlnlnu ~ Llcshs~ t~emlna F~Ad~lttl~ltativd
{ )
l c. °'"
t: Cl) 0 1:J o, 0 eu 0
- u Cause t Corrective
/\\ct Ion to Prevent Recurrence Reactor remained critical tripped.turbine to place offgas system back in service.
Reactor scranuned on turbine stop va'ive closure -
EHC pump electrical malfupction
,I caused scram.
G-Operotlonal ~tror
~-Other (Explaln)
~-other (Explain)
Hcthods l-f1ahua I 2-Uonual ~crnm j~~uio~nt1t ~ct~m Ex111blt G-lnstructlons. for Pteparntion ot OatA Ehtty Sheets fr* llcens~c Event Repott (
)Fllc(HUAEG*
01~1)
L 1
Uo.
bate 801024*
. ~ ;.'..
~ ; : ; ***.>
... ;. ~
- .*1.
~ :.
Ft Forced St
- Scheduled I
f.*.**
4j
- 0.
~
F 2
UN It SllUTOOWHS /\\NO POWER REOUtTIOflS*
U CJ 1. l:l I 1111 *O
...,5"0._-.....
2~4~9 *----
llll I T fl/\\11[ Dresden I II I
llF.PORT HONTll OCTOBER,' 1980 0/\\ lE November 1, 1980 COllPLETEO llV s. Cjeszkiewicz TEUPtlOtlE (815) 942-2920
~
L 0
t,....
N 0
OI t-1 0
111 c
t: u licensee 0
"O *-
~
µ
- J VI 0.....
Event
"' 0 IO
.c.., oc.
... :c
~
u
- I Report I
- I.._...
GJ.c ~
0
- c "'
(:)
- 14. 78 A
NA l
\\
\\
f\\eosonl A-Equipment tal lutt! (Explnin) '*
b-Hrilntenunce of Test t~Refu~llng 1
b-n~yulotorv ncstrlelton W° GJ
.... "O
.,,.0
>-U VJ
~~op~tator tralnlnd & llc~n9~ ~~eml~a 1
F*Admlttl~ttatlve
( )
~
c GJn
. t: Q) 0 -0
§*3 u
Cause & Corrective l\\ctfon to Prevent Recurrence Reactor scrammed -. essent.ial servic~ *M.G.
set trippecl & APRM's upscale.
G-Operotlonal f.rror H-Other (Explaln)
)
Hcthod1
. I -11a11Ua I 2-Uonmil ~crom
- j-i\\utoinnt le Sctarn I
~-other (Explaln)
Exhibit G-lnstructlons. for Preparation or O~tn thtty She~t~ fr~ llcen~~o
£vent h~potl (
)Fl~6(HUREO*.
0161)
(
DRESDEN* UNIT 2 SAFETY RELATED MAINTENANCE.
NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MA I llTENANCE NUMBER CAUSE RESULT CORRECTIV~~ACTION LPRM 48-17B Preventive WR 419228 Outage 412-7
. NA NA Cleaned amplifier con..:. e APRM 3 tacts & tested okay.
2B LPCI Heat Preventive WR #6106 Outage 412-6 NA NA Plugged 46 tubes &
Exchanger tested okay.
SRM-24 Preventive WR #7602 Outage 412-9 NA NA Re.placed relay 2D &
~.
checked for response.
I DW Pressure Preventive WR 419298 outage *1f2-8 NA NA Replaced micro-switch Switch (ECCS)
&. caiibratea *.
LPRM.48-49-B Preventive WR 119228 Outage 112-8 NA NA
.Repaired per DIS 700-27.
RPS Relays Preventive WR 418549 Outage 112-6 NA NA Tested relays.
2A Recirc. Pipe Preventive WR.119455 Outage 112-9 NA NA Replaced meter.
Discharge Valve e
HPCI 2-2301:...4 Corrective WR #9491 Outage 112-9 Valve Won't Open/ Replaced SMB-1 Contact Stuck Open torque MO Valve LER #80-39/03L-O Close from Contro switch.
Switch Containment Vent Preventive WR #9648 Outage 412-9 NA NA Replaced solenoid valve.
Valve 2-1601-22
DRESDEN UN IT 3 SAFETY RELATED MAINTENANCE.
DRESDEN UNIT 2/3 SAFETY RELATED MAINTENANCE.
NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAlllTENAHCE NUMBER CAUSE RESULT CORRECTIV~'ACTION Diese 1 Generato1 Preventive WR #9209 NA NA Installed new 120VDC Interlock striker.
e Station Bat-:-.
Preventive WR #9053
teries 2/3 "B" SBGT Preventive WR 1f9448 NA NA C.leaned flow switch &
calibrated.
- 213 DG Air I
Corrective WR 1f9284 CutoutSwitch Set PG Cuts Out At Readjusted & calibrated Compressor 5 PSI to Low 250 lb.
switch.
I
SUMMARY
OF OPERATING EXPERIENCE UNIT ONE OCTOBER, 1980 10-1 to 10-31 Unit One was shutdown for the entire month, awaiting license approval for the chemical cleaning.
Major work scheduled to be completed following chemical cleaning is as follows:
HPCI installation for ECCS upgrading, equip-ment upgrade to IEEE 279, major in-service inspection, and refuel.
SUMMARY
OF OPERATING EXPERIENCE UNIT TWO 10-1 to 10-5 10-5 to 10-9 OCTOBER, 1980 Unit Tw~ started the month operating at a power level of 420 MWe.
On October, 5, at 0106, the Unit was tripped off system to place the offgas system.
back i~ service.
The Unl.t was placed back on the system at 092'2, reaching a power level of 427 MWe.
'On October 9, at 0705, an EHC pump electrical malfunction caused a turbine stop valve closure, resulting in a sub-sequent scram.
10-9 to 10-12 The reactor was brought critical at 1305 on October 9, but the subsequent inopera-bility of the HPCI system required the reac.tor to be shutdown at 1420 on October
- 11.
- The reactor was again brought criti-cal.at 0510 on October 12.
10-12 to 10-31 The Unit was placed back on the system at 1836 on October 12 and continued oper-ati,ng through the remainder of the month, r~aching a power levrl of 382 MWe, with a capacity {actor ~nd availability of 44%
and 88%, respectively.
SUMMARY
OF OPERATIN~ EXPERIENCE UNIT THREE OCTOBER, 1980 10-1 to 10-24 Unit Three started the month operating at a power level of 762 MWe.
On October 24, at 1647, the Unit scrammed on high flux due to the essential service M.G. set tripping and APRM's going upscale.
10-25 to 10-31 The 1reactor was brought critical at 0130 on October 25 and placed back on the*system at 0734.
The Unit operated thrqugh the remainder of the month, reaching a power level of 780 MWe, with a capacity factor and availability of 90%.and 98%, respectively.