ML17173A097
| ML17173A097 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 06/29/2017 |
| From: | Robert Schaaf Plant Licensing Branch II |
| To: | Tennessee Valley Authority |
| Schaaf R, NRR/DORL/LPL2-2 | |
| References | |
| CAC MF8694 | |
| Download: ML17173A097 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 29, 2017 APPLICANT: Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Plant, Unit 2
SUBJECT:
SUMMARY
OF NOVEMBER 9, 2016, PRESUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING WATTS BAR NUCLEAR PLANT, UNIT 2, ICE WEIGHT TECHNICAL SPECIFICATIONS CHANGE On November 9, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Tennessee Valley Authority (TVA or the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was for TVA staff to present information regarding a planned license amendment request to modify the technical specification (TS) requirements related to the required ice mass in the Watts Bar Nuclear Plant, Unit 2, ice condenser containment. The meeting notice and agenda, dated October 28, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16302A385. A list of attendees for the meeting is enclosed.
The licensee provided a presentation on the background, intent, technical basis, and schedule for the request. The presentation is available at ADAMS Accession No. ML16313A466. TVA staff provided background information on the basis for the TS requirements, including the basis for differences in the required ice mass for the Unit 1 and Unit 2 ice condenser containments.
They stated that the intent of the proposed TS change was to align the Unit 2 TS requirements with the current Unit 1 requirements. TVA staff described the technical basis for the proposed change, noting that the Unit 1 analysis of record for loss-of-coolant accident mass and energy releases to containment is bounding for Unit 2. They stated that the licensee intended to submit its license amendment request by mid-December 2016 and would request approval by October 2017 to permit use of the revised TS ice mass values during the Unit 2 first refueling outage. TVA subsequently submitted its license amendment request by letter dated December 21, 2016 (ADAMS Accession No. ML16356A673).
No regulatory decisions were made at the meeting.
One member of the public observed the meeting by telephone. No Public Meeting Feedback Forms were received.
Please direct any inquiries to me at 301-415-6020 or Robert.Schaaf@nrc.gov.
Docket No. 50-391
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv Robert G. Schaaf, Senior Project Manager Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
LIST OF ATTENDEES Applicant: Tennessee Valley Authority
Subject:
Information Meeting - Ice Weight Technical Specifications Change Location: U.S. Nuclear Regulatory Commission Headquarters, One White Flint North Room 0-1 O-B04 NAME TITLE Robert Schaaf Senior Project Manager Eric Oesterle Branch Chief Ahsan Sallman Senior Reactor Systems Engineer Peter Snyder Reactor Systems Engineer Gordon Arent Manager, Licensing, Watts Bar Nuclear Plant Russ Wells Senior Licensing Project Manager David Lafever Senior Project Manager Kasey Decker Mechanical Design Engineer Chris Logan Engineer Plant: Watts Bar Nuclear Plant, Unit 2 Date: September 19, 2016 Time: 2:00 p.m. - 4:00 p.m.
ORGANIZATION NRC/NRR/DORULPLll-2 (Plant Licensing Branch 11-2)
NRC/NRR/DSS/SRXB (Reactor Systems Branch)
NRC/NRR/DSS/SRXB N RC/N RR/DSS/STSB (Technical Specifications Branch)
Tennessee Valley Authority (TVA)
TVA TVA TVA Westinghouse Enclosure NAME TITLE ORGANIZATION Rich Lukas Engineer Westinghouse Jim Smith*
Westinghouse Kent Bonadio*
Westinghouse William Freebairn*
S&P Global - Platts
- by teleconference
ML17173A097 OFFICE DORL/LP2-2/PM DORL/LP2-2/LA DORL/LP2-2/BC BClayton US hoop NAME RSchaaf (LRonewicz for)
(FSabe for)
DATE 06/28/2017 06/28/2017 06/29/2017