ML17164A879

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Re Quality Assurance Program Description Change
ML17164A879
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/12/1998
From: Nerses V
NRC (Affiliation Not Assigned)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17164A880 List:
References
TAC-MA3420, TAC-MA3421, NUDOCS 9811170250
Download: ML17164A879 (3)


Text

Novembe 12, 1998 Mr. Robert CP. Byram Senior Vice Pr~'sident-Generation and Chief Nuclear Officer PP8L, Inc.

2 North Ninth Street Allentown, PA 18101

SUBJECT:

QUALITYASSURANCE PROGRAM CHANGE, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (TAC NOS. MA3420 AND MA3421)

Dear Mr. Byram:

By letter dated August 18, 1997, as supplemented August 12, 1998, you requested NRC approval of proposed changes to the Susquehanna Steam Electric.Station, Units 1 and 2, Quality Assurance Program Description (QAP) in accordance with 10 CFR 50.54(a)(3).

The proposed changes relate to previously approved provisions regarding the Quality Assurance organizational structure and the qualifications of the Manager-Nuclear Quality Assurance.

We have reviewed your submittal in accordance with 10 CFR 50.54(a), and have determined that the proposed QAP changes, which constituted reductions in commitments, are acceptable as the QAP continues to meet the requirements of Appendix B to 10 CFR Part 50. The NRC staff's safety evaluation of your proposed change is enclosed.

Docket Nos. 50-387 and 50-388

Enclosure:

Safety Evaluation ccw/encl: See next page D

Sincerely, original signed by:

Victor Nerses, Senior Project Manager Project Directorate l-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket File PUBLIC PDI-2 Reading JZwolin ski RCapra VNerses DJaffe MO'Brien OGC ACRS LCampbell RGramm AMendiola CAnderson, RGN-I S Black s~a i~I~ ~p pg fiick"JHOW Cl o~ i OFFICE PDI

/PM P

I HQMB M PDI 2/D NAME DATE I

V¹fses:rb jO /

/98 SBlack~

/ /0/98 RCa ra IIl II n2/98 OFFICIAL RECORD COPY DOCUMENT NAME: SU3420.GEN ctgpg

'8'1.1.17d2S0

~81.~12 PDR ADQCK 05000387 P

PDR

gp,g RE0(

~o Cy O

0 a

Y.

Op gO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 12, 1998 Mr. Robert G. Byram Senior Vice President-Generation and Chief Nuclear Officer PP8L, Inc.

2 North Ninth Street Allentown, PA 18101

SUBJECT:

QUALITYASSURANCE PROGRAM CHANGE, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND2 (TAC NOS. MA3420 AND MA3421)

Dear Mr. Byram:

By letter dated August 18, 1997, as supplemented August 12, 1998, you requested NRC approval of proposed changes to the Susquehanna Steam Electric Station, Units 1 and 2, Quality Assurance Program Description (QAP) in accordance with 10 CFR 50.54(a)(3).

The proposed changes relate to previously approved provisions regarding the Quality Assurance organizational structure and the qualifications of the Manager-Nuclear Quality Assurance.

We have reviewed your submittal in accordance with 10 CFR 50.54(a), and have determined that the proposed QAP changes, which constituted reductions in commitments, are acceptable as the QAP continues to meet the requirements of Appendix B to 10 CFR Part 50. The NRC staff's safety evaluation of your proposed change is enclosed.

Sincerely, Victor Nerses, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

Safety Evaluation cc w/encl: See next page

Mr. Robert G. Byr"m PP8L, Inc.

Susquehanna Steam Electric Station, Units 1 8 2 CC:

Jay Silberg, Esq.

Shaw, Pittman, Potts 8 Trowbridge 2300 N Street N.W.

Washington, D.C. 20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel PP8L, lnc.

2 North Ninth Street Allentown, Pennsylvania 18101 Licensing Group Supervisor PP8L, Inc.

2 North Ninth Street Allentown, Pennsylvania l8I01 Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O. Box 35 Berwick, Pennsylvania 18603-0035 Director-Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 Regional Administrator, Region I

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 General Manager Susquehanna Steam Electric Station PP8L, Inc.

Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President PP8L, lnc.

Rural Route 1, Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Operations PP8L, Inc.

2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, Pennsylvania 17108-1266 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603