ML17164A833
| ML17164A833 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 10/16/1998 |
| From: | Nerses V NRC (Affiliation Not Assigned) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17164A834 | List: |
| References | |
| TAC-M96328, NUDOCS 9810200262 | |
| Download: ML17164A833 (5) | |
Text
Mr. Robert G. Byram Senior Vice President-Ge~ation and Chief Nuclear Officer Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101 October 16,
SUBJECT:
CORRECTION TO AMENDMENTNO. 151 TO FACILITYOPERATING LICENSE NO. NPF-22, SUSQUEHANNA STEAM ELECTRIC STATION (SSES),
UNIT2 (TAC NO. M96328)
Dear Mr. Byram:
On July 30, 1998, the Nuclear Regulatory Commission issued Amendment No. 151 to Facility Operating License No. NPF-22 for the SSES, Unit 2. This amendment replaced the then current Technical Specifications (TS) for Unit 2 with the improved TS based on NUREG-1433, "Improved BWR-4 Technical Specifications," dated April 1995.
Your staff has identified ten typographical errors in the improved TS, Table 3.3.5.1-1.5, ADS Trip System B. Each error involves the adoption of Standard Technical Specification (STS) surveillance or allowable value information where it was intended to retain the CTS information.
These changes were not addressed in the conversion to the improved TS.
It should be noted that the similar SSES, Unit 1 improved TS contains the correct current TS information. The errors involve either the omission of current TS surveillance requirements or the inclusion of incorrect STS allowable value numbers.
In the safety evaluation enclosed with the July 30, 1998, letter, the NRC staff addressed the proposed changes to the current TS requirements.
Changing the current TS information in Table 3.3.5.1-1.5 was not addressed in either the Electrical or Instrumentation sections of the safety evaluation because the intent of Amendment No. 151 was not to revise this information.
The typographical errors inadvertently occurred in the typing of the pages for the improved TS.
The typographical errors were not identified by the NRC staff before the improved TS were issued.
Revised TS page 3.3-47, with the correct information, is being issued and is enclosed with this letter.
98i0200262 9810i6 PDR ADCICK 05000388 P
PDR Docket No. 50-388
Enclosure:
TS Page 3.3-47 ccw/o encl: See next page Sincerely,
/s/
Victor Nerses, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation S
U Docket File*
PUBLIC*
PDI-2 Reading*
JZwolinski RCa ra
- WBeckner GMarcus CSchulten GKelly MWeston TJader'Luehman PRay MReardon AChu EFord RGiardina p( Ol y
OPA OC/LFDCB CAnderson, RGN-I OFFICE PDI-2/Pal PDI-2/LA.
TSB/BC OGC PDI-2/D NAME DATE N rses. 8 0 II//98 MO'Brie 0 I/ /98 WBeckner tV l0/ /
98 lOIl 98 RCa ra ~~
to/ 5/98 OFFICIAL RECORD COPY DOCUMENT NAME: SU96327A.COR
)
~
'is4 I
gAS REOii 4,
P~
Cy J.
Cl
'C O
Ilh O~
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 2055&0001 October 16, 1998 Mr. Robert G. Byram Senior Vice President-Generation and Chief Nuclear Officer Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
CORRECTION TO AMENDMENTNO. 151 TO FACILITYOPERATING LICENSE NO. NPF-22, SUSQUEHANNA STEAM ELECTRIC STATION (SSES),
UNIT2 (TAC NO. M96328)
Dear Mr. Byram:
On July 30, 1998, the Nuclear Regulatory Commission issued Amendment No. 151 to Facility Operating License No. NPF-22 for the SSES, Unit 2. This amendment replaced the then current Technical Specifications (TS) for Unit 2 with the improved TS based on NUREG-1433, "Improved BWR-4 Technical Specifications," dated April 1995.
Your staff has identified ten typographical errors in the improved TS, Table 3.3.5.1-1.5, ADS Trip System B. Each error involves the adoption of Standard Technical Specification (STS) surveillance or allowable value information where it was intended to retain the CTS information.
These changes were not addressed in the conversion to the improved TS.
It should be noted that the similar SSES, Unit 1 improved TS contains the correct current TS information. The errors involve either the omission of current TS surveillance requirements or the inclusion of incorrect STS allowable value numbers.
In the safety evaluation enclosed with the July 30, 1998, letter, the NRC staff addressed the proposed changes to the current TS requirements.
Changing the current TS information in Table 3.3.5.1-1.5 was not addressed in either the Electrical or Instrumentation sections of the safety evaluation because the intent of Amendment No. 151 was not to revise this information.
The typographical errors inadvertently occurred in the typing of the pages for the improved TS.
The typographical errors were not identified by the NRC staff before the improved TS were issued.
Revised TS page 3.3-47, with the correct information, is being issued and is enclosed with this letter.
Sincerely, Victor Nerses, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-388
Enclosure:
TS Page 3.3-47 cc w/o encl: See next page
4)lg
~
V A Mr. Robert G. Byram Pennsylvania Power 8 Light Company Susquehanna Steam Electric Station, Units 1 8 2 CC:
Jay Silberg, Esq.
Shaw, Pittman, Potts 8 Trowbridge 2300 N Street N.W.
Washington, D.C. 20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 I
Licensing Group Supervisor Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania I8I01 Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O. Box 35 Berwick, Pennsylvania 18603-0035 Director-Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 General Manager Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company, Rural Route 1, Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603
C