ML17164A829

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-387/98-07 & 50-388/98-07 on 980721-0831 & Nov.Reactivity Controls During Unit 2 Startups on 980626 & 0702 Were Not Adequate
ML17164A829
Person / Time
Site: Susquehanna  
Issue date: 10/15/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17164A830 List:
References
50-387-98-07, 50-387-98-7, 50-388-98-07, 50-388-98-7, NUDOCS 9810200178
Download: ML17164A829 (7)


See also: IR 05000387/1998007

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

/.

ACCESSION NBR:9810200178

DOC.DATE: 98/10/15

NOTARIZED: NO

DOCKET

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME 'UTHOR AFFILIATION

ANDERSON,C.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

5: Light Co.

SUBJECT:

Forwards insp repts 50-387/98-07

S 50-388/98-07

on

980721-0831

Ec NOV.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

05000387

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEO

FILE CENTER

NRR DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

ERNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

NERSES,V

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1.

1

1

1

1

1

1

1

1

1

1

1

1

'NOTES:

g QPQQQ PRON

@MCl%0omc Ru

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST

OR REDUCE THE NUMBER,OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION

CONTACT THE DOCUMENT CONTRC

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

October 15, 1998

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

\\

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-387/98-07, 50-388/98-07

AND NOTICE OF VIOLATION

Dear Mr. Byram:

On August 31, 1998, the NRC completed an inspection at your Susquehanna

Steam

Electric Station (SSES) Unit 15. 2 reactor facilities. The inspections covered routine

activities by the resident inspectors,

and announced inspections by Region

I Operator

Licensing Specialists,

Region

I Radiation Specialists,

and a Region

I Emergency

Preparedness

Specialist.

The enclosed report presents the results of these inspections.

The inspectors discussed the findings of these inspections with Mr. R. Saunders,

Vice

President Nuclear Operations, at an exit meeting at the completion of the inspection period.

During the 6-week period of inspection, your conduct of activities was characterized

by

safe operation and generally conservative decision making.

However, we concluded that

reactivity controls during the Susquehanna

Unit-2 plant startups on June 26, 1998 and

July 2, 1998 were not adequate.

Based on the results of this inspection, the NRC has determined that a violation of NRC

requirements occurred.

The violation is cited in the enclosed Notice of Violation (Notice)

and the circumstances

surrounding it are described in detail in the subject inspection

report.

This violation is of concern since the July 2, 1998 reactivity control event on Unit-.

2 was preventable if your operating staff had correctly used your condition reporting

system following a similar reactivity control event on June 26, 1998. This Severity Level

IV violation could meet the criteria of Section VII.B.1 of the Enforcement Policy and be

considered

a Non-Cited Violation. However, because of the importance of reactivity

management

and the importance of an effective corrective action system, the NRC has

determined that the violation of NRC requirement 10 CFR.50 Appendix B Criterion XVI

"Corrective Action" should be cited.

The NRC has concluded that information regarding the reason for the violation, the

corrective actions taken and planned to correct the violation and prevent recurrence

is

already adequately addressed

in this inspection report.

Therefore, you are not required to

respond to this letter, unless the description therein does not accurately reflect your

corrective actions or your position.

In that case, or if you choose to provide additional

information, you should follow the instructions specified in the enclosed'Notice.

9810200i78 98iOi5

PDR

'ADOCK 05000387

6

PDR

Robert G. Byram

The inspectors performed an inspection of your solid radioactive waste management

and

radioactive material transportation programs.

Performance

in these areas was concluded

to be effective.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Sincerely,

ORIGINALSIGNED BY:

Clifford J. Anderson, Chief

Projects Branch 4

Division of Reactor Projects

Docket Nos.:

50-387;50-388

License Nos:

NPF-14, NPF-22

Enclosures:

1. Notice of Violation

2. Inspection Report 50-387/98-07, 50-388/98-07

cc w/encls:

R. F. Saunders,

Vice President

- Site Operations

G. T. Jones, Vice President - Engineering and Support

G. Kuczynski, General Manager - SSES

J. M. Kenny, Supervisor, Nuclear Licensing

G. D. Miller, General Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

F. P. Arcury, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

A. Male, Manager, Nuclear Assessment

Services

H. D. Woodeshick, Special Assistant to the President

J. C. Tilton, III, Allegheny Electric Cooperative, Inc.

Commonwealth of Pennsylvania

Robert G. Byram

Distribution w/encls:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

H. Miller, RA/W. Axelson, DRA (1) (IRs)

C. Anderson, DRP

D. Florek, DRP

R. Junod, DRP

NRC Resident Inspector

PUBLIC

Distribution w/encls: (Via E-Mail)

B. McCabe, OEDO

R. Capra, PD 1-2, NRR

V. Nerses, Project Manager, NRR

D. Brinkman, NRR

Inspection Program Branch, NRR (IPAS)

R, Correia, NRR

F. Talbot, NRR

M. Campion, ORA

DOCDESK

DOCUMENT NAME: G:iBRANCH4iSUSiSUS9807.INS

To receive a copy of this document, indicate in the box: "C" Copy without

attachment/enclo