Environ Assessment & Finding of No Significant Impact Re Issuance of Amends to Licenses NPF-14 & NPF-22,to Reflect Change in Licensee Name from PP&L Co to Pp&L,Inc
ML17164A804
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/24/1998
From: Nerses V
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17164A805 List:
References
NUDOCS 9809300061
Download: ML17164A804 (6)


Text

7590-01P NNSYLVANIAPOWER AND IG COMPA Y SUS UEHANNASTEAM ELECTRIC STATION UNITS 1 AND2 NVIRONMENTA ASSESSMENT AND FINDING OF The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of amendments to Facility Operating Licenses Nos. NPF-14 and NPF-22, issued to Pennsylvania Power and Light.Company (the licensee), for operation of the Susquehanna Steam Electric Station (SSES), Units 1 and 2, located in Luzeme County, Pennsylvania.

ENVIRONMENTALASSESSMENT ldeniflcation o he P o osed tio

\\

The proposed action would revise Facility Operating Licenses Nos. NPF-14 and NPF-22, to reflect the change in the licensee's name from Pennsylvania Power & Light Company to PP&L, Inc.

The proposed action is in accordance with the licensee's application for amendment dated April23, 1998.

e Ne or e

The proposed action is needed to have the licenses accurately reflect the new legal name of the licensee.

98093000&i 980924 PDR ADDCK 05000387 P

PDR

J The Commission has completed its evaluation of the proposed changes to the licenses.

There willbe no impact on the status of the Operating Licenses (OLs) or the continued operation of the SSES, since the proposed changes are solely administrative in nature.

The proposed changes update the OLs so that references to the licensee's name willbe consistent with the new corporate name, PP&L, Inc., of the licensee.

The proposed changes are administrative in nature and willnot increase the probability or consequences of accidents, no changes are being made in the types or amounts of any eNuents that may be released offsite, and there is no significant increase in the allowable occupational or public radiation exposure.

Accordingly, the Commission concludes that there are no significant radiological environmental impacts associated with the proposed action.

With regard to potential nonradiological impacts, the proposed changes are administrative in nature and do not involve any physical features of the plant. Thus, the proposed changes do not affect nonradiological plant effluents and have no other environmental impact.

Accordingly, the Commission concludes that there are no significant nonradiological environmental impacts associated with the proposed action.

Alternatives othe Pro osedAction Since the Commission has concluded there is no significant environmental impact associated with the proposed action, any alternatives with equal or greater environmental impact need not be evaluated.

As an alternative to the proposed action, the staff considered denial of the proposed action (no-action alternative).

Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.

h

y

~ This action does not involve the use of any resources not previously considered in the Final Environmental Statement for SSES, Units 1 and.2.

In accordance with its stated policy, on August 21, 1998, the staff consulted with the Pennsylvania State official, Mr. M. Maingi of the Pennsylvania Department of Environmental Protection Bureau, Division of Nuclear Safety, regarding the environmental impact of the proposed action. The State official had no comments.

Based upon the environmental assessment, the Commission concludes that the proposed action willnot have a significant effect on the quality of the human environment.

Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed action.

For further details with respect to the proposed action, see the licensee's letter dated April23, 1998, which is available for public inspection at the Commission's Public Document Room, The Gelman Building, 2120 L Street, NW., Washington, DC, and at the local public document room located at the Osterhout Free Library, Reference Department, 71 South Franklin Street, Wilkes-Barre, PA 19464.

Dated at Rockville, Maryland, this 24gh day of gep$ ezbep 1998.

FOR THE NUCLEAR REGULATORYCOMMISSION Victor Nerses, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation