Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9809090193
DOC. DATE: 98/09/02
NOTARIZED: NO
FACIL:50-387 Susquehanna
Steam Electric Station,
Unit 1, Pennsylva
50-388
Susquehanna
Steam Electric Station,
Unit 2, Pennsylva
AUTH.NAME
AUTHOR AFFZLXATXON
ANDERSON,C.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power
& Light Co.
DOCKET ¹
05000387
05000388
SUBJECT:
Forwards insp repts
50-387/98-06
&. 50-388/98-06
on 980609-
0720.No violations notedFbut
several
discrepancies
in
maintenance
of SSES
emergency plan including example of
non-compliance
w/NRC regulations identified.
DTSTRIBUTTON CODE:
TEOZF
COPTES
RECETVED?DTRj ENCD
/
SIZE: 3 + 5~
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEO
LE
NTE
DRPM PECB
NUDOCS-ABSTRACT
OGC/HDS2
XTERNAL: LITCO BRYCE,J
H
NRC
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1,
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
XD CODE/NAME
NERSES,V
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN1
FILE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
05000387
G
0
D
~Aopg FROM
EUEGTRONlG FILE
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US .O REDUCE WASTE. TO HAVE .OUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPZFS
RECEIVED BY YOU CR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
September
2,
1998
Mr. Robert G. Byram
Senior Vice President
- Nuclear
Power 5 Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-387/98-06, 50-388/98-06
Dear Mr. Byram:
On July 20, 1998, the NRC completed an inspection at your Susquehanna
Steam Electric
Station (SSES)
18> 2 reactor facilities. The inspections covered routine activities by the
resident inspectors
and an announced inspection by a Region
I Emergency Planning
Specialist.
The enclosed report presents the results of these inspections.
The inspectors
discussed the findings of these inspections with Mr. R. Saunders,
Vice President Nuclear
Operations and Mr. G. Kuczynski, General Manager SSES at the exit meeting on
July 24, 1998.
During the 6-week period covered by this inspection report, your conduct of activities at
Units
1 and 2 was characterized
as safe operations and safe refueling activities.
During
this period you (1) conducted
a Technical Specification required shutdown of Unit 1
because of the inoperability of the "S" acoustic monitor, (2) conducted
a scheduled
shutdown of Unit 2 to replace
a defective reactor recirculation pump seal, and (3)
conducted an unscheduled
shutdown of Unit 2 due to an unisolatable leak on a condensate
flow element.
In addition to these shutdowns SSES experienced two unexpected
on Unit 2. Overall decision making was conservative.
We also reviewed the implementation of your emergency preparedness
(EP) program.
We
found the program was adequate to respond to a radiological emergency.
We noted
several discrepancies
in your maintenance
of the SSES emergency plan including an
example of non-compliance with NRC regulations.
This example involved an issue of minor
significance which accordingly is not subject to formal enforcement action.
Its existence,
however, indicates that greater care is needed
on your part when evaluating proposed
changes to the plan and to emergency response
equipment subject to the plan.
Details of
the above discrepancies
are contained in the attached inspection report.
9809090193
980902
ADQCK 05000387
0
OFFICIAL RECORD
COPY
I E:01
Mr. Robert G.
Byram
In accordance with 1
.
o
0 CFR 2.790 of the, NRC's "Rules of Practice," a copy of this letter
e t Room (PDR).
and its enclosures will be placed in the NRC Public Document Room
Sincerely,
Original Signed
by:
Clifford Anderson, Chief
Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-387;50-388
License Nos:
Enclosure:
Inspection Report 50-387/98-06, 50-388/98-06
cc w/encl:
R. F. Saunders,
Vice President - Site Operations
G. T. Jones, Vice President - Engineering and Support
G. Kuczynski, General Manager - SSES
J. M. Kenny, Supervisor, Nuclear Licensing
G. D. Miller, General Manager - Nuclear Engineering
R. R. Wehry, Nuclear Licensing
F. P. Arcury, Nuclear Services Manager, General Electric
C. D. Lopes, Manager - Nuclear Security
A. Male, Manager, Nuclear Assessment
Services
H. D. Woodeshick, Special Assistant to the President
J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Commonwealth of Pennsylvania
Mr. Robert G.
Byram
Distribution w/encl:
Region
I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
H. Miller, RA/W. Axelson, DRA (IRs)
C. Anderson, DRP
D. Florek, DRP
R. Junod, DRP
NRC Resident Inspector
PUBLIC
Distribution w/encl: (Via E-Mail)
B. McCabe, OEDO
V. Nerses, Project Manager, NRR
D. Brinkman, NRR
Inspection Program Branch, NRR (IPAS)
R. Correia, NRR
F. Talbot, NRR
M.,Campion, ORA
DOCDESK
DOCUMENT NAME: G:iBRANCH4iSUSiSUS9806.INS
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment/en
lo ure
"E" = Copy with attachment/enclosure
"N" = No copy
OFFICE
NAME
DATE
re
RI/DRP
CAnderson
r'
09/ 4/98
OFFICIAL RECORD COPY