Mr, Robert G. Byram
. Senior Vice President-Gen8%ion and Chief Nuclear Officer Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101 August 17 98
SUBJECT:
REVISION 1 TO RELIEF REQUEST RR-3 FOR THE SECOND 10-YEAR INSERVICE INSPECTION PROGRAM FOR SUSQUEHANNA STEAM ELECTRIC STATION (SSES), UNITS 1 AND2 (TAC NOS. MA0983 AND MA0984)
Dear Mr. Byram:
By letter dated February 9, 1998, as revised by letter dated June 10, 1998, you submitted a request for review and approval of Revision 1 to Relief Request RR-3. The existing Relief Request RR-3, Revision 0, which was previously approved by the NRC, is proposed to be revised to add a reference to the relocation of the requirements for snubber inspections from the SSES, Units 1 and 2, plant Technical Specifications to the SSES Technical Requirements Manual.
The NRC staff has reviewed the information concerning the revision to Relief Request RR-3.
The additional information addresses a documentation aspect with regard to the relocation of the snubber inspection requirements, but does not involve any change in previously approved technical requirements or the existing acceptable level of quality and safety.
The additional information provided is not considered a request for relief, and therefore, the staffs approval of the revision to Relief Request RR-3 is not required.
Changing the reference of the location of the snubber inspection requirements is acceptable.
The Improved Technical Specifications no longer include these inspection requirements.
Ifyou have any questions, please contact Mr. Victor Nerses at (301) 415-1484.
Sincerely,
/s/
Robert A. Capra, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-387/50-388 cc: See next page BU O
Docket File PUBLIC PDI-2 Reading RCa ra VNerses MO'Brien OGC ACRS SMalur
,FGrubelich CAnderson, RGN-I BMcCabe OFFICE NAME DATE PDI-2/
M SMal r:
Y/ 3/98 PDI-2/P VNers s
/ 3/98 P
/
/ 8 PDI-2/D RCa ra~~
~ / I'I/98 OFFICIALRECORD COPY DOCUMENT NAME: SU0983.GEN 9808i90239 9808i7 PDR ADQGK 05000387 P
- ,oY
/
i l'
~
~
gP,R R500
~c~
0 Cy C
L 0O cA O
+n qO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 17,'1998 Mr. Robert G. Byram Senior Vice President-Generation and Chief Nuclear Officer Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
REVISION 1 TO RELIEF REQUEST RR-3 FOR THE SECOND 10-YEAR INSERVICE INSPECTION PROGRAM FOR SUSQUEHANNA STEAM ELECTRIC STATION (SSES), UNITS 1 AND2 (TAC NOS. MA0983 AND MA0984)
Dear Mr. Byram:
By letter dated February 9, 1998, as revised by letter dated June 10, 1998, you submitted a request for review and approval of Revision 1 to Relief Request RR-3. The existing Relief Request RR-3, Revision 0, which was previously approved by the NRC, is proposed to be revised to add a reference to the relocation of the requirements for snubber inspections from the SSES, Units 1 and 2, plant Technical Specifications to the SSES Technical Requirements Manual.
The NRC staff has reviewed the information concerning the revision to Relief Request RR-3.
The additional information addresses a documentation aspect with regard to the relocation of the snubber inspection requirements, but does not involve any change in previously approved technical requirements or the existing acceptable level of quality and safety.
The additional information provided is not considered a request for relief, and therefore, the staff's approval of the revision to Relief Request RR-3 is not required.
Changing the reference of the location of the snubber inspection requirements is acceptable.
The Improved Technical Specifications no longer include these inspection requirements.
Ifyou have any questions, please contact Mr. Victor Nerses at (301) 415-1484.
Sincerely,
~~ O..~
Robert A. Capra, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-387/50-388 cc: See next page
J
U lp Mr. Robert G. Byram Pennsylvania Power 8 Light Company Susquehanna Steam Electric Station, Units1 &2 CC:
Jay Silberg, Esq.
Shaw, Pittman, Potts 8 Trowbridge 2300 N Street N.W.
Washington, D.C. 20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Licensing Group Supervisor Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18I01 Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O. Box 35
'erwick, Pennsylvania 18603-0035 Director-Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. O. Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 General Manager Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1, Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603