ML17164A668
| ML17164A668 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/23/1997 |
| From: | Stolz J NRC (Affiliation Not Assigned) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17164A669 | List: |
| References | |
| TAC-M92528, TAC-M92529, NUDOCS 9707150067 | |
| Download: ML17164A668 (5) | |
Text
June 23, 1997 Hr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
EVALUATION OF THE RECONCILIATION OF THE FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN FOR SUS(UEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 (TAC NOS.
H92528 AND H92529)
Dear Hr. Byram:
The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL) has reviewed and evaluated the information provided by Pennsylvania Power 3 Light Company in its letter dated June 1,
1995, related to the reconciliation of the First 10-Year Interval Inservice Inspection (ISI) Program Plan for the Susquehanna Steam Electric Station, Units 1
and 2.
The staff's evaluation and conclusions are contained in the enclosed safety evaluation.
This action closes the TACs noted above.
If you have any questions concerning the staff's findings, please contact Chester Poslusny at (301) 415-1402.
Sincerely,
/s/
John F. Stolz, Director ProjectDirectorate I-2 Division of Reactor Projects - I/II Office of,Nuclear Reactor Regulation Docket Nos.
50-387/388
Enclosure:
Safety Evaluation cc w/encl:
See next page DISTRIBUTION Docket File PUBLIC PDI-2 Reading SVarga/JZwol inski JStolz CPoslusny JZimmerman HO'Brien OGC GHill(4)
ACRS THcLellan
/Ha+
Woean MPasciak.
RGN-I pYf go~
llllllllllllllllllllllllllllllllJlllllll OFFICE NAME DATE
'en
/93 PDI-2/P JZ'
/94 b
OGC PbJ-2/
CPo I.sny 6y glee
/9 P
2PH JS z
8 /96 OFFICIAL RECORD COPY DOCUMENT NAME:
SU89528.REL 9707i500b7 970623 PDR ADGCK 05000387 P
4 H
pe REGS
~o
+**++
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 June 23, 1997
'Mr. Robert G.
Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Al'Ientown, PA 18101
SUBJECT:
EVALUATION OF THE RECONCILIATION OF THE FIRST 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 (TAC NOS.
M92528 AND M92529)
Dear Mr. Byram:
The staff, with technical assistance from its contractor, the Idaho National Engineering Laboratory (INEL) has reviewed and evaluated the information provided by Pennsylvania Power 5 Light Company in its letter dated June 1,
1995, related to the reconciliation of the First 10-Year Interval Inservice Inspection (ISI) Program Plan for the Susquehanna Steam Electric
- Station, Units 1 and 2.
The staff's evaTuation and conclusions are contained in the enclosed safety evaluation.
This action closes the TACs noted above.
/If you have any questions concerning the staff's findings, please contact Chester Poslusny at (301) 415-1402.
Sincerely, Docket Nos.
50-387/388
Enclosure:
Safety Evaluation cc w/encl:
See next page Jo
. Stolz, Director P
ect Directorate I-Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Mr. Robert G.
Byram Pennsylvania Power 5 Light Company t
Susquehanna Steam Electric Station, Units 1
& 2 CC'ay
- Silberg, Esq.
Shaw, Pittman, Potts 5 Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsyl vani a 18101 Mr. J.
N. Kenny Licensing Group Supervisor Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mrs. Maitri Banerjee Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P. 0.
Box 8469
'arrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton,~III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert'.
Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603
/
George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue,.
State College, PA 16803 Chairman Board of Supervisors 738 East Third Street
- Berwick, PA 18603