Forwards Insp Repts 50-387/95-01 & 50-388/95-01 on 950109- 13.No Violations Noted.Appropriate Controls for Design Change Process in Place & Products Technically Sound & Well Engineered
ML17164A647
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/12/1995
From: Eugene Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17164A648 List:
References
NUDOCS 9503210358
Download: ML17164A647 (3)


See also: IR 05000387/1995001

Text

March 12,

1995

Hr. Robert

G.

Byram

Senior Vice President - Nuclear

Pennsylvania

Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

SUSQUEHANNA ENGINEERING INSPECTION 95-01

Dear Hr. Byram:

This letter refers to the inspection of your engineering activities conducted

by Hessrs.

B. HcDermott and D. Dempsey of this office from January 9-13,

1995,

at the Susquehanna

Steam Electric Station.

The inspection

was focused

on

issues

important to public health

and safety specifically, the identification

and resolution of engineering-related

deficiencies,

and the technical

adequacy

of design

changes.

The preliminary inspection findings were discussed

with

Hr.

G. Jones

and other members of your staff on January

13,

1995.

We found that appropriate controls for your design

change

process

are in place

and that the products

are technically sound

and well engineered.

System

engineering efforts associated

with safety-related

direct current

(DC)

electrical

systems

were effective in identifying arid resolving design

deficiencies

and technical

issues.

We acknowledge your continued efforts to

resolve subtle

and complex engineering deficiencies that affect the risk

significant performance of the high pressure

coolant injection system suction

transfer

and the leak-tightness

of check valves

between

the control rod drive

system

and the scram discharge

volume.

No reply to this letter is required,

and your cooperation with us during this

inspection is appreciated.

Sincerely,

Docket Nos.

50-387;

50-388

Eugene

H. Kelly, Chief

Systems

Section

Division of Reactor Safety

Enclosure:

Inspection

Report Nos.

50-387/95-01

and 50-388/95-01

cp", pnn

<-Li V3

<

9503210358

9503i2

PDR

ADOCK 05000387

6

PDR

0

Mr. Robert

G.

Byram

cc w/encl:

H.

G. Stanley,

Vice President

Nuclear Operations

J.

M. Kenny, Nuc'lear Licensing

G. T. Jones,

Vi'ce 'President - Nuclear Engineering

H. H. Urioste, Nuclear Services

Manager,

General Electric

C.

D. Lopes,

Manager - Nuclear Security

W. Burchill, Manager,

Nuclear equality Assurance

J.

H. Finnegan,

Supervisor,

Nuclear Compliance

H. D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

PUBLIC

Nuclear Safety Information Center

(NSIC)

D. Screnci,

PAO (2)

NRC Res'ident

Inspector

Commonwealth of Pennsylvania

Distribution w/encl:

Region I Docket

Room (with concurrences)

J. Wiggins,

DRS

E. Kelly, DRS

Stephen

Shuman,

NRC Consultant

K. Gallagher,

DRP

DRS Files (2)

Distribution w/encl: (Via E-Mail)

W. Dean,

OEDO

C. Poslusny,

Project Manager,

NRR

J. Stolz,

PDI-2,

NRR

Inspection

Program Branch,

NRR (IPAS)

March 12,

1995

DOCUMENT NAME:

A:SU950101. INS

To receive a copy of

document, indicate in the box: C ~ Copy without attachment/enctosure

'E'

Copy with attachmen%nctosure

'N'

No

copy

OFF IC

NAME

DATE

R /

BMcDermott dm

03/09/95

RI

EKelly

03/

/95

03/

/95

OFFICIAL RECORD

COPY

03/

/95

03/

/95