February 21, 95 NOTE TO:
<<Docket File FROM:
Joseph W. Shea, Project Manager
/S/
Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
SUBJECT:
BACKGROUND DOCUMENTS REGARDING POSTULATED LOSS OF SPENT FUEL POOL COOLING EVENTS, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 The attached documents were provided by Hr. David Lochbaum to the NRC staff.
The documents are related to the staff's ongoing review of spent fuel pool cooling design issues at Susquehanna Steam Electric Station.
Attachment 1 is a facsimile from Hr.
Lochbaum to Joe Shea of the NRC staff, dated February 2,
1995, that discusses NRC correspondence concerning qualification of equipment for accident environments.
Attachment 2 is a facsimile from Hr.
Lochbaum to Joe Shea of the NRC staff, dated February 10, 1994, which discusses a Licensee Event Report made by the licensee of the Cooper Nuclear Station concerning a
design defect in the standby gas treatment system.
Please place the attached documents in the Susquehanna Steam Electric Station Docket File.
Attachments:
As stated DISTRIBUTION:
PUBLIC PDI-2 Reading JShea HO'Brien JStolz OFFICE NAME DATE w/attachments HVirgilio SJones
- RMatakas, RI LPrividy, RI PDI-2 L
MO'se
/95
-2 PH 4/95 PDI-2 PD FQStol z Z /Z) 95 9502270ih2 95022i PDR ADOCK 05000387 PDR
~gR RED "o
Cy I
0O IVl Cp
~o
++*++
", UNITED STATES NUCLEAR REGULATORY COMMISSION
'ASHINGTON, D.C. 20555-0001 February 21, 1995 NOTE TO:
Docket File FROM:,
Joseph W. Shea, Project Manager
'roject Directorate I-2
'Division of Reactor Projects I/ I
, Office of Nuclear Reactor Regulation E
SUBJECT'ACKGROUND DOCUMENTS REGARDING POSTULATED LOSS OF SPENT FUEL POOL COOLING EVENTS, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1
AND 2 The attached documents were provided by Hr. David Lochbaum to the NRC staff.
The documents are related to the staff's ongoing review of spent fuel pool cooling design issues at Susquehanna Steam Electric Station.
Attachment 1 is a facsimile from Hr.
Lochbaum to Joe Shea of the NRC staff, dated February 2,
1995, that discusses NRC correspondence concerning qualification of equipment for accident environments.
Attachment 2 is a facsimile from Hr.
Lochbaum to Joe Shea of the NRC staff, dated February 10,
- 1994, which discusses a Licensee Event Report made by the licensee of the Cooper Nuclear Station concerning a
design defect in the standby gas treatment system.
Please place the attached documents in the Susquehanna Steam Electric Station Docket File.
Attachments:
As stated