Informs That Staff Has Completed Review of Requesting Approval of Proposed Mod to BWR Emergency Procedure Guidelines to Address Reactor Core Instabilities
ML17161A002
Person / Time
Site: Perry, River Bend  
Issue date: 06/06/1996
From: Matthews D
NRC (Affiliation Not Assigned)
To: Donovan K
CENTERIOR ENERGY
Shared Package
ML17161A003 List:
References
PROJECT-691 TAC-M89489, TAC-M89629, NUDOCS 9606180123
Download: ML17161A002 (4)


Text

gP,R REC0(

0 as cs L

~O

<<+*is+

UNITED STATES NUCLEAR'EGULATORYCOMMISSlON WASHINGTON, D.C. 2Q555-000I June 6,

1996 Kevin P.

Oonovan Centerior

Energy, Perry Power Plant MC A210 P. 0.

Box 97

Perry, OH 44081

SUBJECT:

ACCEPTANCE OF PROPOSED MODIFICATIONS TO THE BOILING WATER REACTOR (BWR)

EMERGENCY PROCEDURE GUIDELINES (TAC NOS.

M89489 AND M89629)

Dear Mr. Oonovan:

The staff has completed its review of: (1) your submittal transmitted by letter (BWROG-94038) dated March 21,

1994, requesting our approval of proposed modifications to the BWR Emergency Procedur'e Guidelines (EPGs)

(NEOO-31331) to address reactor core instabilities; and (2) the Operations Engineering, Inc.,

(OEI) Document 9402-3, "The Management of ATWS by Boron Injection and Water Level Control," submitted by letter (BWROG-94111) dated September 16, 1994.

OEI Document 9402-3 gives the analyses used by BWROG to justify its ATWS control strategy.

The staff has also reviewed the BWROG submittal transmitted by letter (BWROG-95078) dated September 15,

1995, responding to the staff's request for comments on a draft safety evaluation report (SER).

The draft SER was placed in the Federal

~Re ister for comment and copies were transmitted with an invitation for comment to other interested parties.

The final

SER, enclosed, reflects modifications made in response to BWROG and ACRS comments (no other comments were received) and defines the basis for the staff's acceptance of the proposed EPG modifications.

Both the staff and the ACRS agree that, for BWRs injecting standby liquid control through a standpipe below the core, maintenance of level above top-of-active fuel (TAF) is the superior water level control strategy in an anticipated transient without scram (ATWS) event.

The staff recommends a

level around TAF +5 feet

( 1,52 m), or as high as possible, while still maintaining--the level at least 2 feet (0.61 m) below the feedwater sparger.

Although control at any level between the minimum steam cooling water level and 2 feet below the feedwater sparger

-was found to be acceptable, both the staff and ACRS urge that a high-water-level control strategy be adopted.

Additional details are contained in the enclosed SER.

The staff is sending a copy of this letter and the enclosed SER to. all BWR licensees and understands that all BWR licensees will revise their emergency operating procedures consistent with the approved modifications.

The suggested implementation program contained in Enclosure 1 to the staff's-September 12, 1988, letter to the BWROG transmitting the SER on NED0-31331.,

Revision 4 remains applicable.

The staff requests that the BWROG monitor the progress of implementation and inform the NRC of the number of plants completing implementation and the number selecting each water level option.

4

K. Donovan June 6,

1996 The staff does not intend to repeat its review of the matters found acceptable, as described. in the enclosed

SER, on the proposed modifications for NED0-31331, except to ensure that the material presented is applicable to the specific plant involved.

In accordance with procedures established in NUREG-0390, "Topical Report Review Status,"

the staff requests that the BWROG publish an accepted revision of this report within three months of receipt of this letter.

The accepted revision should incorporate this letter and the enclosed Safety Evaluation, including the attached technical evaluation report.

The accepted revision should include an -A (designating accepted) following the report identification designations Sincerely, Project No.

691

Enclosure:

As stated cc:

see attached list David B. Matthews, Chief Generic Issues and Environmental.

Projects Branch Office of Nuclear Reactor Regulation

Boiling Water Reactor Owners Group CC:

C.

D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point-2 PO Box 63

Lycoming, NY 13093 D.

B. Fetters PECO Energy Nuclear Group Headquarters MC 62C-3 965 Chesterbrook Blvd.

Wayne, PA 19087 R. A, Pinelli GPU Nuclear MCC Building E

One Upper Pond Road Parsippany, NJ 07054 S. J. Stark GE Nuclear Energy 175 Curtner Ave, M/C 165 San Jose, CA 95125 T. J.

Rausch Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place, 4th Floor ETWIII Downers Grove, IL 60515