ML17159A263
| ML17159A263 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/13/1998 |
| From: | Conte R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| NUDOCS 9804170356 | |
| Download: ML17159A263 (5) | |
Text
April 13, 1998 Mr. Robert G. Byram Senior Vice Piesident - Nuclear Pennsylvania Power 5 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
SUBJECT:
MAINTENANCERULE,BASELINE INSPECTION FOR SUSQUEHANNA
Dear Mr. Byram:
In a telephone conversation on April 13, 1998, between Mr. J
~
Kenny and Mr. J. Williams, arrangements were made for the NRC to conduct a baseline inspection of your maintenance rule program at Susquehanna.
The inspection is planned for the week of June 1-5, 1998.
The inspection objective is to evaluate your performance to support compliance with the requirements of 10 CFR 50.65, "Requirements for monitoring the effectiveness of maintenance at nuclear power plants."
The inspection will be conducted using Inspection Procedure 62706, "Maintenance Rule" and will involve a team of at least 4 inspectors.
The team willrequire information about your program for our in-office preparation for the inspection.
This information is identified in the enclosure to this letter.
Please provide this information to Mr. J. Williams by May 18, 1998.
Mr. Kenny has been advised of this request.
Thank you for your cooperation in this matter.
If you have any questions regarding this inspection, please contact me at (610) 337-5183 or E-mail address RJC@NRC.GOV.
Sincerely, Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-387; 50-388
Enclosure:
Reference material needed for maintenance rule inspection 9804i70356 9804i3 PDR ADOCK 05000387 6
+g)i
Mr. Robert G. Byram cc w/encl:
G. T. Jones, Vice President - Site Operations G. Kuczynski, General Manager J. M. Kenny, Supervisor, Nuclear Licensing G. D. Miller, General Manager - Nuclear Engineering R. R. Wehry, Nuclear Licensing P.
Ray, Nuclear Services Manager, General Electric C. D. Lopes, Manager - Nuclear Security A. Male, Manager, Nuclear Assessment Services H. D. Woodeshick, Special Assistant to the President J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
Commonwealth of Pennsylvania
Mr. Robert G. Byram 3
Distribution w/encl:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
H. Miller, RA/W. Axelson, DRA (IRs)
C. Anderson, DRP P.
Bonnett, DRP A. Linde, DRP NRC Resident Inspector PUBLIC D~/)
F//
DOCUMENT NAME: A:MRI.SUS To receive a copy ot this document. Indicate In the box:
"C
~ Copy without attachment/enclosure E"
Copy with attachment/enclosure N
~ No copy OFFICE Rl/DRS E
Rl/DRS E
NAME JWilliams RConte DATE 04/13/98
~
04
/9 04/
/98 OFFICIAL RECORD COPY 04/
/98 04/
/98
REFERENCE MATERIALFOR MAINTENANCERULE INSPECTION "1.
Copy of Maintenance Rule Program and all related procedures (covering all modes of operations) including those relating to expert panels, PRA, risk assessments and ranking, and scoping.
Also, procedures used for assessing risk when taking equipment out of service.
If not included in the procedures, please provide the definition of availability and reliability used at the site.
"2.
List of all Systems, Structures, and Components (SSCs) and those within the scope of the maintenance rule.
"3.
List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.
"4.
List of maintenance preventable functional failures (MPFFs) for the current operating
. cycle with any repetitive failures identified.
"5.
List of high risk and low risk significant SSCs.
In this list also include: (1) low risk significant standby SSCs; (2) the top 20 low risk significant SSCs which missed the cut off; (3) the SSCs with risk significance different from that determined by PRA.
"6.
Assessments of risk significant and risk rankings.
Risk reduction worth, risk achievement worth, and core damage frequency results, if applicable.
"7.
Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.
8.
Background explanations
( i.e. copies of "conditions adverse to quality reports" etc.)
for SSCs currently assigned to the (a)(1) category.
9.
Copy of any internal or external maintenance rule assessments.
10.
Current maintenance rule trending data.
"11.
Current performance criteria and goals for SSCs.
Include a list of SSCs classified as "inherently reliable" and/or "run to failure". If PRA used, provide PRA information such as reliability and availability basic events in the PRA used for risk ranking compared to performance criteria established for these SSCs.
12.
Qualifications and backgrounds for Expert Panel Members.
Criteria used by the expert panel to determine risk significance for all modes of operation.
Minutes from the last five expert panel meetings.
"13.
Summary of significant changes made to the PRA model since the IPE.
14.
Copies of equipment status documents (LCO logs, Equipment tagging logs, RO and SRO logs) for the last month of power operation.
Items identified with asterisk (") are needed for in-office review prior to the inspection onsite.