ML17159A063
| ML17159A063 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/26/1997 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Byram R PENNSYLVANIA POWER & LIGHT CO. |
| References | |
| NUDOCS 9712020020 | |
| Download: ML17159A063 (3) | |
Text
November 26, 1997 Mr. Robert G. Byram Senior Vice President - Nuclear Pennsylvania Power'5. Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
SUBJECT:
REQUALIFICATIONPROGRAM INSPECTION
Dear Mr. Byram:
In a telephone conversation on November 25, 1997, Mr. J. Caruso and Mr. A. Fitch made arrangements for the NRC to inspect the licensed operator requalification program at Susquehanna Units 152.
The inspection is planned for the week of January 12, 1998, which coincides with your regularly-scheduled requalification examination cycle.
The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs.
In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by January 5, 1998.
Mr. Fitch has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
The request for requalification examination material is covered by the Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires on April 30, 2000.
The estimated average burden is 4.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> per response, including gathering, copying, and mailing the required material.
Send commends regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6, F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Washington, D.C.
20503.
97i2020020 97ii2b PDR ADGCK 05000387 V
PDR llilbilillbiiiilll
Mr. Robert G. Byram Thank you for your cooperation in this matter.
If you have any questions regarding this inspection, please contact me at (610) 337-5211 or Internet address GWM@NRC.GOV.
Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos.
50-387; 50-388 cc w/encl:
G. T. Jones, Vice President - Nuclear Operations G. Kuczynski, General Manager J. M. Kenny, Supervisor, Nuclear Licensing G. D. Miller, General Manager - Nuclear Engineering R. R. Wehry, Nuclear Licensing M. M, Urioste, Nuclear Services Manager, General Electric C. D. Lopes, Manager - Nuclear Security A. Male, Manager, Nuclear Assessment Services H. D. Woodeshick, Special Assistant to the President J. C. Tilton, III, Allegheny Electric Cooperative, Inc.
R. A. Calvan, Regional Director, FEMA, Region III (EP Exercise/IRs Only)
Commonwealth of Pennsylvania
Mr. Robert G. Byram Distribution w/encl:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
C. Anderson, DRP A. Linde, DRP NRC Resident Inspector PUBLIC W, Dean, OEDO C. Poslusny, Project Manager, NRR J. Stolz, PDI-2, NRR Inspection Program Branch, NRR (IPAS)
R. Correia, NRR F. Talbot, NRR V. Curley, DRS DRS Facility File DOCDESK DOCUMENT NAME: A: REQUAL.SUS To receive a copy of this document, indicate In the box:
C" ~ Copy without attachment/enclosure "K ~ Copy with attachment/enclosure N ~ No copy OFFICE NAME DATE RI/DRS JCaruso 1 1/25/97 RI/DRS GMeyer 11/
/97 RI/
1 1/
/97 RI/
11/
/97 RI/
1 1/
/97 OFFICIAL RECORD COPY