May 29, 1997 LICENSEE:

Pennsylvania Power and Light Company FACILITY:

Susquehanna Steam Electric Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING WITH PENNSYLVANIA POWER AND LIGHT COMPANY (PP8L)

ON THE IMPROVED TECHNICAL SPECIFICATIONS (ITS) SUBMITTAL FOR SUSQUEHANNA STEAN ELECTRIC STATION, UNITS 1 AND 2 For all of the technical specification (TS) conversions, there are numerous deviations from the Standard Technical Specifications (STS) in the NUREG documents due to the specific design of the plant.

For BWR-4s, the NUREG document was based on Hatch Units 1 and 2, which was the pilot conversion.

While there are many similarities between the BWR-4s, there are also many plant specific differences, particularly in the design of the electrical systems.

~Face-to-face meetings have been the best means of describing the specific design of plant systems and the bases for the TSs proposed by the licensee.

For Susquehanna, meetings were held with the licensee on April 2, April 22, May 7, and May 8, 1997, to discuss the staff's comments on PP&L's ITS submittal, to let PP8L describe the design features of their facility and to identify any "out-of-scope" TSs that will have to be reviewed by the appropriate technical branch in NRR and/or modified by the licensee.

A list of attendees at one or more of the meetings is enclosed.

(Or iginal signed by)

Richard J

~ Clark, Project Manager Division of Reactor Projects

- I/II Office of Nuclear'eactor Regulation Docket Nos.

50-387 and 50-388

Enclosure:

As stated IImRtt'I:I,rCSIOIltg It;mpp cc w/encl:

See next page Distribution HARD COPY LDocket Fi1 PUBLIC PDI-2 RF OGC ACRS E-HAIL l

e'Col 1 ins/FMi ragl i a TTjader NGi 1 1 es RZimmerman ETomlinson MReardon SVarga RGiardina WDean JStolz MWeston HModes

~

RGN-I CPoslusny/RClark CSchulten DRoss (E-Mail SAM) 0 4 00 > 'O'Brien CGrimes On August 1,

1996, PP8L submitted an amendment application to revise the Susquehanna 1 and 2 current technical specifications (CTS) to be consistent with the ITS in NUREG-1433.

Revision 1, "Standard Technical Specifications f'r General Electric Plants.

BWR 4."

The submittal has been reviewed both by an NRC contractor and the NRR staff.

The staff's extensive comments on the 15 volume submittal were transmitted to PP&L by letters dated March 24, and April 1, 1997.

PP8L expects to, respond to the comments in early June 1997.

OFFICE NAME DATE PDI-2/

RCla:

w

~9/Zf/97 PD - /

CP usny f8/97 V

g>'

en 97 J

z 97 PDI-2/L ~j, P I-L DOCUMENT NAME'.

ITS.SUM 9706040188 970529 PDR ADQCK 05000387 P

PDR

gyes RK00

~o Cy 0O I

cO C

0 Yg qO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 Nay 29,, 1997 LICENSEE:

Pennsylvania Power and Light Company FACILITY:

Susquehanna Steam Electric Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING WITH PENNSYLVANIA POWER AND LIGHT COMPANY (PP8L)

ON THE IMPROVED TECHNICAL SPECIFICATIONS (ITS) SUBMITTAL FOR SUSQUEHANNA STEAM ELECTRIC STATION. UNITS 1 AND 2 On August 1,

1996, PP&L submitted an amendment application to revise the Susquehanna 1 and 2 current technical specifications (CTS) to be consistent with the ITS in NUREG-1433, Revision 1, "Standard Technical Specifications f'r General Electric Plants, BWR 4."

The submittal has been reviewed both by an NRC contractor and the NRR staff.

The staff's extensive comments on the 15 volume submittal were transmitted to PP&L by letters dated March 24, and April 1, 1997.

PP8L expects to respond to the comments in early June 1997.

For all of the technical specification (TS) conversions, there are numerous deviations from the Standard Technical Specifications (STS) in the NUREG documents due to the specific design of the plant.

For BWR-4s, the NUREG document was based on Hatch Units l,and 2, which was the pilot conversion.

While there are many similarities between the BWR-4s, there are also. many plant specific differences, particularly in the design of the electrical systems.

Face-to-face meetings have been the best means of describing the specific design of plant systems and the bases for the,,TSs proposed by the licensee.

For Susquehanna, meetings were held with the licensee on April 2, April 22, May 7, and May 8, 1997, to discuss the staff's comments on PP&L's ITS submittal, to let PP&L describe the design features of their facility and to identify any "out-of-scope" TSs that will have to be reviewed-by the appropriate technical branch in NRR and/or modified by the licensee.

A list of attendees at one or more of'he meetings is enclosed.

Docket Nos.

50-387 and 50-388

Enclosure:

As stated cc w/encl:

See next page c

ark, Proje Manager ivision f Reactor Projects

- I/II Office of Nuclear Reactor Regulation

+ ~

~

J'I'1 Pl 1

II t

Hr. Robert G.

Byram Pennsylvania Power

& Light Company Susquehanna Steam Electric Station, Units 1 & 2 CC:

Jay Si lberg, Esq.

Shaw, Pittman, Potts

& Trowbridge 2300 N Street N.W.

Washington, D.C.

20037 Bryan A. Snapp, Esq.

Assistant Corporate Counsel Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsyl vani a 18101 Hr. 'J.

H. Kenny Licensing Group Supervisor.

Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. K. Jenison Senior Resident Inspector U. S.

Nuclear Regulatory Commission P.O.

Box 35 Berwick, Pennsylvania 18603-0035 Hr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P.

0.

Box 8469 Harrisburg, Pennsylvania 17105-8469 Hr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.

212 Locust Street P.O.

Box 1266 Harrisburg, Pennsylvania 17108-1266 Mr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hr. George Kuczynski Plant Manager Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Hr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Company Rural Route 1, Box 1797 Berwick, Pennsylvania 18603 George T. Jones Vice President-Nuclear Operations Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Chairman Board of Supervisors 738 East Third Street

Berwick, PA 18603

SUSQUEHANNA UNITS 1 AND 2 LIST OF ATTENDEES AT ONE OR MORE MEETINGS Name R. Clark T. Tjader E..Tomlinson R. Giardina N. Weston C. Schulten C. Grimes N. Gilles N. Reardon A. Maron A. Winter B. Palmer P.

Brady R. Rossiter