C 25:TEGORY 2y I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9705220351 DOC.DATE: 97/05/14 NOTARIZED:

NO FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva AUTH.NAME AUTHOR AFFILIATION KEIMIG,R.R.

Region 1 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION BYRAM,R.G.

Pennsylvania Power

& Light Co.

SUBJECT:

Advises of planned insp effort resulting from 970327 PPR at plant for period, of Oct 1996 thru Mar 1997.Detailed insp plan for next 6 months encl.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:

DOCKET 05000387 05000388 05000387 E

RECIPIENT ID CODE/NAME

'PD1-2 PD INTERNAL: ACRS FILE CEN E

HHFB NRR/DRPM/PERB OE DZR RGN1 FILE 01 EXTERNAL LITCO BRYCE E J H

NRC PDR NOTES:

COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME POSLUSNY9C AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 NOMIC NUDOCS FULLTEXT COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 R,

D N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OP. YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 21

May 14, 1997 Mr. Robert G. Byram Senior Vice President

- Nuclear Pennsylvania Power 5. Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - SUSQUEHANNA STEAM

~ ELECTRIC STATION

Dear Mr. Byram:

On March 27, 1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of the Susquehanna Steam Electric Station.

The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.

The results are used by NRC management to facilitate planning and allocation of inspection resources.

The PPR for Susquehanna involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997.

PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Susquehanna PPR review.

It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.

The enclosure details our inspection plan for the next 6 months.

Resident inspections are not listed due to their ongoing and continuous nature.

We will inform you of any changes to the inspection plan.

If you have any questions, please contact Richard R. Keimig, at 610-337-5255.

Sincerely, Original Signed By:

Richard R. Keimig, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-387;50-388

Enclosure:

Inspection Plan 220na~

9705220351 97051.4 PDR ADOCK 05000387 8

PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

Mr. R. Byram cc w/encl:

G. T. Jones, Vice President

- Nuclear Operations G. Kuczynski, Plant Manager J. M. Kenny, Supervisor, Nuclear Licensing G. D. Miller, Manager - Nuclear Engineering R. R. Wehry, Nuclear Licensing M. M. Urioste, Nuclear Services Manager, General Electric C. D. Lopes, Manager - Nuclear Security W. Burchill, Manager, Nuclear Safety Assessment H. D. Woodeshick, Special Office of the President J. C. Tilton,'III,Allegheny Electric Cooperative, Inc.

Commonwealth of Pennsylvania

Mr. R. Byram 3

Distribution w/encl:

Region I Docket Room (with concurrences)

,Nuclear Safety Information Center (NSIC)

K. Gallagher, DRP D. Screnci, PAO NRC Resident Inspector PUBLIC H. Oprendek, DRP Distribution w/encl: (Via E-Mail)'.

Dean, OEDO "C. Poslusny,'Project

Manager, NRR J. Stolz, PDI-2, NRR Inspection Program Branch, NRR (IPAS)

R. Correia, NRR F. Talbot, NRR DOCDESK DOCUMENT NAME: g:ibranch4ipprltr97.sus To receive e copy of this document, indicete in the box:

C

~ Copy without ettechment/enclosure E" ~ Copy with ettechment/enciosure N

~ No copy OFFICE Rl:DRP NAME PBonnett DATE 5/

97 RI:DRP RKeimig 5//f97 OFFICI RECORD COPY

IP NUMBER IP 40500 - CO IP 93802-RI SUSQUEHANNA INSPECTION PLAN TITLE Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems Operational Safety Team (incorporated with IP 40500)

DATE 7/28-8/8/97 IP 37001

- CO IP 84750 - CO IP 82302 - CO IP 81700 - CO IP 82301

- CO IP 64704 - CO IP Pending 10 CFR 50.59 Evaluations Radioactive Waste Treatm'ent and Effluent and Envii inmental Monitoring (Effluents)

Review Emergency Preparedness Exercise Objectives Physical Security Emergency Preparedness Exercise Fire Protection Fire Protection Functional 6/1 5/97 7/21/97 8/14/97 10/06/97 10/27/97 1 1/1 6/97 10/20-1 1/3/97 IP 92902 - RI IP 92903 - Rl Maintenance Training Review Old Engineering Open Items 7/28-8/8/97 7/28-8/8/97 IP - NRC Inspection Procedure CO - Core Inspection (NRC Program. Requirement)

Rl - Regional Initiative Inspection

I