ML17158C054
| ML17158C054 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/07/1997 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Pennsylvania Power & Light Co, Allegheny Electric Cooperative |
| Shared Package | |
| ML17158C055 | List: |
| References | |
| NPF-14-A-164, NPF-22-A-135 NUDOCS 9704090259 | |
| Download: ML17158C054 (13) | |
Text
pe RE0Ij (4
~p Cy A.pO Vi
/g R'
'L4~
i qO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 2055&4001 PENNSYLVANIA POWER
& LIGHT COMPANY LLEGHENY ELECTRIC COOPERATIVE INC.
DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1
MENDMENT TO FACILITY OPERATING LICENSE Amendment No. 164 License No.
NPF-14 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power Light Company, dated November 18,
- 1996, complies with the standards and requirements of the Atomic Energy Act of 1954,.as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
'7704090259 970407 PDR ADQCK 05000387 P
2.
Accordingly, the license is amended by changes to.the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:
(2) ch cal S eci ications and nv'ronmental otection P an The Technical Specifications contained in Appendix A, as revised through Amendment No.
1 64 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PP&L shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:.April 7,
1997 Jo F. Stolz, Directo PAQect Directorate I'-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
TTACHMENT TO LICENSE AMENDMENT NO.
ACILITY OPERATING LICENSE NO. NPF-14 OCKET
- 0. 50-387 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
REMOVE INSERT 3/4 6-19 3/4 6-21 3/4 6-19 3/4 6-21
f I
TABLE 3.6.3-1 PRIMARY CONTAINMENTISOLATIONVALVES VALVEFUNCTION AND NUMBER a.
Automatic Isolation Valves MAXIMUM ISOLATIONTIME (Seconds)
ISOLATION SIGNALIs)
HV-141F022 A,B,C,D HV-141F028 A,B,C,D EUHJ2am HV-141F016 HV-141F019 10 10 X,C,D,E,P,UA X,C,D,E,P,UA X,C,D,E,P,UA X,C,D,E,P,UA HV-149F007 HV-149F008 HV-149F088 20 20 12 K,KB K,KB K,KB HV-1 55F002'V-1 55 F003 HV-1 5 5 F1 00 50 50 6
L,LB L,LB L,L'B HV-1 51F008 HV-1 51F009 HV-144F001 HV-144F004 (b) 52 52 30 30 A,M,UB A,M,UB B,J,W I,B,J,W HV-151F022 HV-1 51 F023 30 20 A,M,UB,Z A,M,UB,Z The HPCI HV-155F002 valve may be considered OPERABLE with its current minimum torque switch setting for the period beginning May 23, 1987 until an outage of sufficient duration to revise the setting occurs but no later than the next refueling outage scheduled on or about September 12, 1987.
SUSQUEHANNA - UNIT 1 3/4 6-19 Amendment No. 65, 164
0 TABLE3.6.3-1 (Continued)
PRIMARY CONTAINMENTISOLATION VALVES Valve Function and Number 1
Automatic Isolation Valves (Continued)
Maximum Isolation Time (Seconds)
Isolation Signal(s)"'V-1 5734 A,B
",",:.,SV-",,1 5736 SV-1 5736 B
'",SV-;-1 6740 A,'B SV-1 5742 A,B
- .' 'SV-16750A,B SV-1 5752 A,B SV-1 6774 A;B SV-1 5776 A
. SV-15776 B SV-1 5780 A,B
"- SV-16782A,B N/A
- .. "-g,
- ,':-.N/A N/A
- .,'
- ,.:I',",,N/A N/A
"'N/A N/A
"...-.: N/A,;.;:::.:,-':,:
N/A
, ';.- N/A N/A
'. N/A B,Y
- -..';,".';,.;-...B,Y B,Y
',::,;;-~:..:.;:;,'B,Y B,Y
B,Y B,Y B,Y B,Y
" B,Y B,Y B,'Y SV-15737 SV-15738 SV-15767 SV-16789 N/A
,.'N/A N/A
...N/A -
B,Y,R B,Y,R B,Y,R B,Y,R HV-143F01 9
-HV-.143F020 9
,. -"2 B,C B,C HV-16108 A1,A2
, " HV-16116 A1,A'2 15
.".15 B,Z B,Z Ic)
HV-151F028 A,B
~~II)(c)
HV-'I52F01 5 A,B I))(c)
HV-1 55F042 90 60 90 X,Z X,Z L,LB SUSQUEHANNA - UNIT 1 3/4 6-21 Amendment No. 9 0 -, - 4 4 9, 1 6 4
gA'4 R<GIj~
~o Cy O
0 v
+~
~O
+*i++
t UNITED STATES NUCLEAR REGULATORY COMIVIISSION WASHINGTON, D.C. 205554001 ENNSYLVANIA POWER
& LIGHT COMPANY L
GH N
LECTR C
COOP RATIVE INC.
DOCKET NO. 50-388 SUS UEHANNA STEAM ELECTRIC STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
1 35 License No. NPF-22 1.
The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for the amendment filed by the Pennsylvania Power 8.
Light Company, dated November 18,
- 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:
(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. i 35 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
PPEL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This'icense amendment is effective as of its date of issuance and is to be implemented within 30 days after its date of issuance.
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 7, i997 Jo/
F. Stolz, Directorg Prj 't Directorate I-Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
ATTACHHENT TO LICENSE AMENDMENT NO.
ACILITY OPERATING LICENSE NO.
NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
~REMDV 3/4 6-19 3/4 6-21 INSERT 3/4 6-19 3/4 6-21
TABLE 3.6.3-1 PRIMARY CONTAINMENTISOLATIONVALVES VALVEFUNCTION AND NUMBER a.
Automatic Isolation Valves NIAXIMUM ISOLATIONTIME (Seconds)
ISOLATION SIGNAL(s)
'V-241F022 A,B,C,D HV-241F028 A,B,C,D bdSLJ2am HV-241 F01 6 HV-241F019 10 10 X,C,D,E,P,UA X,C,D,E,P,UA X,C,D,E,P,UA X,C,D,E,P,UA HV-249F007 HV-249F008 HV-249F088 20 20 12 K,KB K,KB K,KB HV-255F002 HV-255F003 HV-255F100 50 50 6
L,LB L,LB L,LB HV-251 F008 HV-251F009 52 52 A,M,UB A,M,UB HV-244F001 "
HV-244F004 Ib) 30 30 B,J,W I,B,J,W HV-251F022 HV-251 F023 30 20 A,M,UB,Z A,M,UB,Z For the RWCU HV-244 F001 valve, the ACTION statement 3.6,3.a need not be followed for the period beginning October 30, 1990 until an outage of sufficient duration to revise the current torque switch setting occurs.
SUSQUEHANNA - UNIT 2 3/4 6-19 Amendment No. 7Q, 135
n
~
I
TABLE 3.6.3-1 (Continued)
PRIMARY CONTAINMENTISOLATION VALVES Valve Function and Number Automatic Isolation Valves (Continued)
Maximum Isolation Isolation Signal(s)"'ime (Seconds)
SV-25734 A,B SV-25736 B
.-"SV-25740 A,B SV-25742 A,B
-, SV-25750 A,B SV-25752 A,B
"SV-25774 A,B
,SV-25776 A
. SV-25776 B
SV-25780 A,B SV-25782 A,B N/A N/A
..'.N/A,.
N/A
'N/A N/A
'.':',;,,', N/A,':: '. "
N/A
':"'::,"N/A N/A N/A B,Y
,',:;".'.;: B,Y '.,
B,Y B,Y
- ," ".;;,'-"B,Y B,Y B,Y B,Y
'B,Y SV-25737
- SV-25738 SV-25767
-SV-25789 N/A N/A N/A N/A, B,Y,R
.-,;..',",.'-'B,Y,R B,Y,R
."B,Y,R HV-243F01 9 HV-243F020 9
.2 B,C
.B,C HV-26108 A1,A2 HV-26116 A1,A2 15
.',, 15 B,Z
,B,Z (c)
HV-251F028 A,B
~~(pl(c) 90 X,Z HV-252F01 5 HV-255F042
{p)(c)
A,B 90 X,Z L,LB SUSQUEHANNA - UNIT 2 3/4 6-21 Amendment No.
697-409, 135
~ l