ML17158B987
| ML17158B987 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/12/1997 |
| From: | Pasciak W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 97-028, 97-28, EA-96-054, EA-96-270, EA-96-347, EA-96-54, NUDOCS 9703180166 | |
| Download: ML17158B987 (2) | |
Text
March 12, 1997 EA Nos.96-270 U. S. NUCLEAR REGULATORY COMMISSION 96-347 REGION I
. 97.-054 NOTICE OF SIGNIFICANT LICENSEE MEETING No. 97-28 Licensee:
Facility:
Docket Nos:
~ Date and Time:
Pennsylvania Power 5 Light Company Susquehanna Steam Generating Station 50-387; 50-388 Friday, March 21, 1997; 10:00 a.m.
Location:
NRC Region I
Public Meeting Room King of Prussia, PA
Purpose:
Predecisional Enforcement conference to address the inoperability of the "E" emergency diesel generator for 20 days, a containment isolation valve that was blocked open during operation, a failure to control the equipment status for the standby liquid control system, and multiple discrepancies'in the performance of licensed and non-licensed operator rounds identified by your staff during your investigations following these events.
NRC Attendees:
H. Miller, Regional Administrator, Region I
C. Hehl, Director, Division of Reactor Projects (DRP)
W. Pasciak, Chief, Projects Branch No. 4, DRP G. Meyer, Chief, Operator Licensing, Division of Reactor Safety (DRS)
B. McDermott, Resident Inspector, Susquehanna
'. Stolz, Director, Project Directorate 1-2, NRR C. Poslusny, Project. Manager, NRR Licensee Attendees:
R. Byram, Senior Vice President - Nuclear G. Jones,.Vice. President - Nuclear Operations
.G. Kuczynski,.Plant Manager W. Burchill, Manager, Nuclear Assessment Services
'. Miller, Manager, Nuclear Engineering K. Chambliss, Manager, Operations J. Kenny, Supervisor, Licensing NOTE:
This transcribed meeting. is closed to the public. Attendance by additional NRC personnel or handicapped persons requiring assistance f
to attend the meeting should be made known by March 19, 1997, via I 4
telephone call to Walter Pasciak, Region I, at (610) 337-5258.
9703i80i66 9703%2 PDR ADQCK 05000387 8
PDR ORIGINAL SIGNED BY Prepared by: PAUL SWETLAND FOR:
Walter J. Pasciak, Chief Projects Branch No. 4 Division of Reactor Projects IIIEl!IIMIIM[IIIIIJIIIIIIIIIIIQIIII
Distribution: (Via E-Mail)
L. J. Callan, Executive Director for Operations S. J. Collins, Director, Office of Nuclear Reactor Regulation J. Lieberman, Director, Office of Enforcement H. Thompson, Deputy Executive Director for Regulatory Programs D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR A. Thadani, Deputy Director, Office of Nuclear Reactor Regulation R. Zimmerman, Associate Director for Projects, NRR S. A. Varga, Director, Division o'f Reactor Projects - I/II, NRR J. Stolz, Director, PD l-2, NRR W. Dean, Regional Coordinator, OEDO
'N. Green, Jr., ORA, RES C. Poslusny, Project Manager, Susquehanna, NRR K; Jenison, SRI, Susquehanna D. Screnci, Public Affairs Officer, Rl.
D. Chawaga, SLO M. Campion, ORA Distribution:
PUBLIC R. Byram, PPSL State of Pennsylvania RA Secretary, Rl DRP Division Secretary, Rl DRS Division Secretary, Rl DNMS Division Secretary, RI DRM Division Secretary, Rl Region I Receptionist B. Letts, Ol
~
DOCUMENT NAME:"A lt0321.sus To receive e copy of this document, indicete ln the boxu C" a Copy thout attachment/enclosure E
Copy with attachment/enclosure N
~ No copy OFFICE Rl'/DRS NAME PSwetlan DATE 3
97 RI/DRP WPas 3
/97 OFFICIAL RECORD COPY