Forwards Insp Repts 50-387/96-11 & 50-388/96-11 on 961022-1202.No Violations Noted
ML17158B903
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/27/1996
From: Pasciak W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158B904 List:
References
NUDOCS 9701030143
Download: ML17158B903 (4)


See also: IR 05000387/1996011

Text

L A.LKLBUD.X 4

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESS

ON NBR:9701030143

DOC.DATE: 96/12/27

NOTARIZED: NO

'ACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

~

~

~

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

UTH.NAME

AUTHOR AFFILIATION

ASCIAK,W.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

6 Light Co.

SUBJECT:

Forwards insp repts

50-387/96-11

6 50-388/96-11

on

961022-1202.No violations noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

NOTES:

DOCKET I

05000387

05000388

T

05000387

E

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

ILE C

NRR DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGNl

FILE

01

NAL: LITCO BRYCEiJ H

NRC

PDR

COPIES

LTTdt ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNYiC

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

NOTES:

1

1

E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES,,RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

December 27, 1996

Mr. Robert G. Byram

Senior Vice President

- Nuclear

Pennsylvania

Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-387/96-11,

50-388/96-1 1.

Dear Mr. Byram:

On December 2, 1996, the NRC completed

an inspection at your Susquehanna

Steam

Electric Station

1 5 2 reactor facilities. The enclosed report presents the results of that

inspection.

During the 6-week period covered by this inspection, your conduct of activities at the

Susquehanna

Steam Electric Station (SSES) was generally characterized

by safety-

conscious operations,

adequate

engineering support, and adequate

maintenance

activities.

Upper level PPRL management,

and upper level SSES site management

were aggressive

in

the identification and resolution of problems.

The Plant Operations Review Committee

demonstrated

a good safety perspective

in their recommendation

to shut down Unit 1 and

resolve an erosion corrosion problem after identification of a Unit 1 steam line drain pinhole

leak.

We are concerned,

however, about three areas identified during this inspection period.

Our

findings indicate weaknesses

in: operator interpretations of when to enter applicable

Technical Specification Action Statements,

certain maintenance

work authorization

documentation,

and selected Nuclear System Engineering operability determinations.

It is

our understanding

that you are aware of these concerns

and have initiated those actions

that you consider appropriate to resolve them.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR)].

Sincerely,

Original Signed By:

Walter J. Pasciak, Chief

Reactor Projects Branch No. 4

Division of Reactor Projects

Docket Nos.:

50-387;50-388

License Nos:

NPF-14, NPF-22

970i030i43 96i227

PDR

ADOCK 05000387

6

PDR

g ol

Mr. Robert G. Byram

Enclosures:

1.

NRC Inspection Report 50-387/96-11, 50-388/96-11

2.

Notice of Violation

cc w/encl:

G. T. Jones, Vice President - Nuclear Engineering

G. Kuczynski, Plant Manager

J. M. Kenny, Supervisor,

Nuclear Licensing

G. D. Miller, Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

M. M. Urioste, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

W. Burchill, Manager, Nuclear Safety Assessment

H. D. Woodeshick, Special Office of the President,

J, C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Commonwealth of Pennsylvania

t

Mr. Robert G. Byram

Distribution w/encl:

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

L. Cunningham,

NRR (Security/Safeguard

IRs)

D. Barss, NRR (Emergency

Plan IRs)

K. Gallagher,

DRP

D. Screnci, PAO

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

W. Dean, OEDO

C. Poslusny,

Project Manager,

NRR

J. Stolz, PDI-2, NRR

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

R. Frahm, Jr., NRR

DOCUMENT NAME: A:i9611.SUS

To receive a copy of this document, indicate in the bosn

C

~ Copy without a

achment/enclosure

E'

Copy with attachment/enclosure

'N

No copy

OFFICE

Rl:DRP

NAME

PSwetland

DATE

12/ /96

RI:DRP

WPasclq

12

96

OFFICIAL RECORD COPY