Forwards Integrated Insp Repts 50-387/96-06 & 50-388/96-06 on 960430-0610.No Violations Noted
ML17158B727
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/11/1996
From: Pasciak W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158B728 List:
References
NUDOCS 9607190201
Download: ML17158B727 (5)


See also: IR 05000387/1996006

Text

CATEGORY

2

REGULAT

Y INFORMATION DISTRIBUTION

YSTEM (RIDS)

ACCESSION NBR:9607190201

DOC.DATE: 96/07/11

NOTARIZED:

NO

DOCKET

'ACIL:50-387 Susquehanna

Steam Electric Station,

Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

AUTH.NAME

AUTHOR AFFILIATION

PASCIAK,W.J.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

BYRAM,R.G.

'ennsylvania

Power

6 Light Co.

SUBJECT:

Forwards integrated

insp rept 50-387/96-06

& 50-388/96-06

on

960430-0610.No violations noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

I

ENCL L

SIZE: 34

I 0 0

"TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

05000387 E

RECIPIENT

.ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/TTC

TER

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

EXTERNAL

LITCO BRYCEIJ

H

NRC PDR

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1.

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNY,C

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

-1

D

U

E

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

t

y

sh

July 11,

1996

Mr. Robert

G.

Byram

Senior Vice President

Nuclear

Pennsylvania

Power

& Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC

INTEGRATED INSPECTION

REPORT 50-387/96-06,

50-388/96-06

Dear Mr. Byram:

On June

10,

1996, the

NRC completed

an inspection at your Susquehanna

Steam

Electric Station

1 L 2 reactor facility.

The enclosed report presents

the

results of that inspection.

During the six week period covered

by this inspection,

your staff's conduct of

activities at the Susquehanna facility was characterized

by safe operation

and

conservative

decision making.

However, in one instance

the timeliness

and

adequacy of your engineering staff's response

to a potentially degraded

condition did not reflect their usual

high level of performance'.

This issue

involved a turbine bypass

valve stroke test in which the test results for the

time-to-open criteria were satisfactory,

but the valve did not cycle smoothly,

and

as

a result operability of the fast acting solenoid could not be

confirmed.

The fast acting solenoid

must

be operable for the valve to perform

its function.

Your staff determined

the valve to be operable

based

on it

passing

the time-to-open criteria without addressing its irregular motion and

operability of the fast acting solenoid.

Of concern

was that it took four

days to resolve this issue, particularly since the operability of this valve

is important

as it has

a significant role in mitigation of certain types of

feedwater transients.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room

(PDR).

Sincerely,

ORIGINAL SIGNED BY:

STEPHEN

PINDALE FOR

Walter J. Pasciak,

Chief

Reactor Projects

Branch

No.

4

Division of Reactor Projects

Docket Nos.:

50-387;50-388

License

Nos:

NPF-14,

NPF-22

/CD lf:~4

1

'M07i9020i 9607ii

PDR

ADOCK OS000387

6

PDR

Mr. Robert

G.

Byram

Enclosures:

Inspection

Report 50-387/96-06,

50-388/96-06

(With Attachments I

and 2)

cc w/encl:

G. T. Jones,

Vice President

Nuclear Engineering

G. Kuczynski, Plant Manager

J.

H. Kenny, Supervisor,

Nuclear Licensing

G.

D. Hiller, Manager

Nuclear Engineering

R.

R. Wehry, Nuclear Licensing

M. M. Urioste, Nuclear Services

Manager,

General Electric

C.

D. Lopes,

Manager

Nuclear Security

W. Burchill, Manager,

Nuclear Safety Assessment

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Nuclear Safety Information Center

(NSIC)

Commonwealth of Pennsylvania

Hr. Robert

G.

Byram

Distribution w/encl:

Region I Docket

Room (with concurrences)

K. Gallagher,

DRP

D. Screnci,

PAO

NRC Resident

Inspector

PUBLIC

Distribution w/encl: (Via E-Hail)

W. Dean,

OEDO

C. Poslusny,

Project Hanager,

NRR

J. Stolz,

PDI-2,

NRR

Inspection

Program Branch,

NRR (IPAS)

D. Vito, SAC

DOCUMENT NAME:

a:9606.sus

To receive a copy of this document, indicate in the box: 'C

y without attachment/enciosure

'P ~ Copy with

attachment/enclosure

M'o copy

OFFICE

RI/DRP

RI/

NAME

DATE

HBanerjee

7/

/96

WPas

a

7/

96

OFF

C

L RECORD

COPY