ML17158B688

From kanterella
Jump to navigation Jump to search
Amend 157 to License NPF-14,deleting from SSES Unit 1 TS 3.6.3-1, Primary Civs, Three Relief Valves in Residual Heat Removal Sys
ML17158B688
Person / Time
Site: Susquehanna 
Issue date: 06/24/1996
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Allegheny Electric Cooperative, Pennsylvania Power & Light Co
Shared Package
ML17158B689 List:
References
NPF-14-A-157 NUDOCS 9606280057
Download: ML17158B688 (5)


Text

qR,R REC

>>>>*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 PENNSYLVANIA POWER 8[ LIGHT COMPANY LLEGHENY ELECTRIC COOPERATIVE INC.

DOCKET NO. 50-387 SUS UEHANNA STEAM ELECTRIC STATION UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

157 License No.

NPF-14 1.

The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A.

The application for the amendment filed by the Pennsylvania Power 8

Light Company, dated January 26,

1996, complies with the standards and requirements'f the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied..

9606280057 960624 PDR ADQCK 05000387 P

PDR

~

~

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No.

NPF-14 is hereby amended to read as follows:

(2) Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 157 and the Environmental Protection Plan con-tained in Appendix B, are hereby incorporated in the license.

PP&L shall operate the facility in accordance with the Technical Specifica-tions and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and is to be implemented within 60 days after its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

~ John F. Stolz, Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

dune 24, 1996

ATTACHMENT TO LICENSE AMENDMENT NO. i57 FACILITY OPERATING LICENSE NO.

NPF-14 OCKET NO. 50-387 Replace the following page of the Appendix A Technical Specifications with enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

~REHOV 3/4 6-25 NS RT 3/4 6-25

0

~I

TABLE 3.6.3-1 (Continued)

PRIMARY CONTAINMENTISOLATIONVALVES Valve Function and Number Other Valves (Continued)

(

c HV-1 51F007 A,B ERKJ3s (c)

PSV-1 5106 A,B HV-152F006 A,B (f)(c)

HV-152F031 A,B 1-26-072 1-26-074 1-26-1 52 1-26-1 54 1-26-1 64 143F013 A,B XV-143F017 A,B C51-J004 A,B,C,D,E 148F007 (b) 155F049 SUSQUEHANNA - UNIT 1 3/4 6 25 Amendment Wo. 88,

149, 1 57